Managing Variation, Understanding the Effects of Carve-out, Scheduling and Flow.

Slides:



Advertisements
Similar presentations
Queue, Demand, Capacity, Variation and Flow
Advertisements

4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Modernisation Skills - the basics. To be covered: Modernisation methodology Why measure capacity and demand How to measure capacity and demand Summary.
Click here to continue.
Smoothing the Flow: the M25 Dr Steve Kingsbury Dr Ann York.
Lisa Ford, Alieke Van Middelaar, Jennifer Bilton, Alayne Healey, Caroline Ranchhod Acute Allied Health Musculo-Skeletal Outpatient Physiotherapy (MSOP)
Delivering the 18 Weeks Referral to Treatment Time Standard Nicki McNaney Programme Director Access Support Team.
The Referral Is the Key 18 weeks Referral to Treatment standard Tracey Gillies National Clinical Lead for 18 weeks Service Redesign and Transformation.
Advanced Access What can we accomplish in Leader? November 2004.
Mark Murray & Associates ACCESS IMPROVEMENT How to see Differently Mark Murray, MD, MPA.
Group Medical Visits For Specialists.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
The Model for Improvement Introducing Process Mapping.
Reducing Delays at the Appointment Mark Murray, MD, MPA Mark Murray & Associates 2209 Capitol Avenue Sacramento, CA (fax)
SimLean Educate A generalised simulation of a theatre process.
Demand and Capacity Planning and Management A rational approach to delivering the best possible clinically effective and.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
PATIENT SCHEDULING AT COLUMBIA’S RADIATION ONCOLOGY TREATMENT CENTER By David Kuo Chao and Ji Soo Han.
0 Prepared by (15pt Arial) [Insert name of presenter 15pt Arial Bold] [Insert title] [Insert Hospital name] Month 200X (12pt Arial Bold) Understanding.
Copyright © 2009 Wolters Kluwer Health | Lippincott Williams & Wilkins Comprehensive Medical Assisting, 3 rd Ed Unit Two: Fundamentals of Administrative.
An Anaesthetist’s perspective on Same Day Surgery
CA to QI: Advanced skills session Nancy Dixon, Director of Strategic Services Healthcare Quality Quest (HQQ)
Overview of the hospital’s computer systems
1 Providing Timely Access to Healthcare or Must Patients be Patient? Based on presentation by Professor Linda Green Columbia Business School April 20 th,
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
A&C Role Development Yorkhill’s MRI Service Lorraine Peebles, SIM, Diagnostics, NHSGGC 31 Mar 10.
Announcement-exam rules
Introduction to Appointment Scheduling
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
Advanced Access, Efficiency and Chronic Disease Management in Primary Healthcare Date: Name of Presenter: WAVE 6.
How to break the enigma of the OPAT code Debbie Cumming How to break the enigma of the OPAT code Debbie Cumming.
Understanding Capacity Demand and Flow Essential measures and processes for understanding healthcare.
Measurement Mike Davies, MD FACP Mark Murray and Associates.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Trauma Theatre Efficiency Tim White Edinburgh. More patients Sicker patients Unpredictability MTC.
Barrack Lane Appointment System. Why Change Growing demand for appointments High DNA levels Some clinicians blocking appointments (calling patients back.
Patient Scheduling Chapter 13 ICBS 120.
Overview Goal Setting. Budget The Importance of Budgeting Preparation of an annual budget and continuous budget monitoring allows management to anticipate.
Outpatient Journey April Innovations in Outpatient Processes U book - Patient focused booking One point referrals – eReferrals & scanning.
Understanding the Patient Journey Process Mapping and Value Stream / Flow Analysis.
Understanding Variation and Setting Capacity. Why do we get backlog and queues? Because demand exceeds activity Because we want to be efficient Because.
Appointments summary Lawley Medical Practice 02Nov15.
Using the NIATx 5x5 Presentation Model
 Capacity Management seeks to improve organizational effectiveness by increasing operational efficiency and reducing patient congestion.  To include.
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M18 8/20/2001Slide 1 SMU CSE 8314 /
Improving access to CAMHS Applying LEAN within CAMHS Beverley Mack Bexley CAMHS.
Cardinia-Casey Community Health Service (CCCHS) Partnership Development with Casey Hospital Michael Jaurigue Senior Clinician Physiotherapist Belinda Ogden.
Mel Pickup, Chief Executive Warrington & Halton Hospitals NHS FT Andy Davies, Accountable Officer Warrington Clinical Commissioning Group Achieving the.
Kate Parker, Senior House Officer in Paediatric Dentistry Foundation Program Sharing Good Practice Event 11/6/14 Improving the efficiency of dental general.
DCAQ, How to… Kris Wright Improvement & Support Team.
On the road to success: Sustaining 18 week delivery of Cardiac Pathways Piers Young National Programme Manager 18 Weeks implementation team, Department.
2017 City of Ottawa Fields Meeting
IT Solutions – Improving Timely Access to Health Care
Operational Plan 2017/18 and 2018/19
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Who pays for today’s healthcare?
Collaborative Programme
Title of the Change Project
Chapter 7 Appointments.
Prudent Eye Care & Clinical Prioritisation: Reconciling Risks & Waits
Performance Measures, Capacity Planning & Scheduling
Call Management and Clinical Triage
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operational Plan 2017/18 and 2018/19
Capacity Planning For Products and Services
What is it like to be a patient?
Collaborative Programme
Capacity Planning For Products and Services
Presentation transcript:

Managing Variation, Understanding the Effects of Carve-out, Scheduling and Flow

How do we manage variation in demand? Delay Forced booking Carved out capacity

Carve-out can be… Huge Number of doctors Number of appointment types 2 week wait Urgent Soon Routine Urgent follow-up Routine follow-up Secretary Post-op Thousands of combinations It is impossible to balance the queues

The size of the carve out Number of specialists 432 Surgeon Physician 1 5 Radiologist Number of appointment types Flexi-sig Colonoscopy ERCP OGD urgent soon routine urgent soon routine urgent soon x x x x x x xx x x x x x xx xx x x xxxx x x x x x xxxx xxx xx xx xxx xxxx xxxxxxx x xxxxx x x x x x x x xx x x x xx 73 queues

Server Queue type AQueue type B

Is all carve-out bad? Capacity for urgent cases (prioritisation of patients) Subspecialisation The issue is not to eliminate all carve-out, but rather to eliminate unnecessary carve-out and reduce the impact of carve-out we can’t eliminate

Terms Carve-out When the flow of one group of patients is improved at one bottleneck at the expense of another group of patients Streaming or segmentation Separation of the process of care along the whole pathway for one group of patients to improve overall flow but not at the expense of other groups of patients

Analogy of segmentation and flow: traffic flow on motorway Slow lane 50 mph Middle lane 70 mph Fast lane 90 mph All vehicles keep to same speed in allocated lane and all progress according to their need

What happens when lorry moves into middle lane at 55 mph? Slow lane 50 mph Middle lane 70 mph Fast lane 90 mph backlog of traffic actual consequences are not seen at point of bottleneck flow rates compromised few needs met

Carve-out Carve-out interrupts the flow of patients and keeps them waiting (traffic lights) Concrete barriers so traffic can’t move into ‘spare space’ Can’t match demand and capacity Queues galore

When is it carve-out? When ring-fencing resources for one group reduces resource available for another group How can we tell whether the problem is carve- out or capacity?

Demand exceeds capacity If Demand > Activity or Capacity Numbers waiting will go up Waiting times will go up

Carve out and churn Number waiting is constant over time But waiting times may not be If Demand = Activity urgent routine “Skimming off the froth”

Variation and carve-out Variation helps cause the waiting list Carve out makes it worse So what are we to do?

Match capacity and demand! Set the maximum waiting time to the time the most urgent referral can afford to wait –Do today’s work today –Do this week’s work this week –Do this month’s work this month

What do we want to achieve? Maximise Throughput Treat the maximum number of patients with the minimum amount of waiting How? By keeping every machine and person working flat out Utilisation = efficiency Sweat the assets! Wrong

Flow We need to optimise the whole process - not each individual step Don’t maximise utilisation, maximise throughput Manage the flow

How long does a scan take? Multiple queues Multiple slot types »arthrogram »thorax with contrast »spine »thorax Eliminate the carve-out

Build new CT templates Prepare patient Scan patient Get off scanner Report Films Type Report 20 minutes - “Quickie” Prepare patient Scan patient Scan patient Contrast Get off scanner Report Films Type Report 40 minutes - “Longie”

Monitor progress

Matrix Allocation: Step 1 Draw a matrix Consultant CCConsultant BB Consultant AAConsultant DD Consultant EE Consultant FF Condition 6 Condition 5 Condition 4 Condition 3 Condition 2 Condition 1

Step 2 Fill in the matrix Consultant CCConsultant BB Consultant AA Consultant DDConsultant EEConsultant FF Condition 6 Condition 5 Condition 4 Condition 3 Condition 2 Condition 1 x x xx x x xxxx xx Ensure all conditions have at least one consultant xxx xxx

Step 3 Establish clinical care groups Consultant CCConsultant BB Consultant AA Consultant DDConsultant EEConsultant FF Condition 6 Condition 5 Condition 4 Condition 3 Condition 2 Condition 1 x x xx x x xxxx xx xxx xxx ccg 1 ccg 2

Step 3 Allocate patients Patient with condition 4 Consultant CCConsultant BB Consultant AA Consultant DDConsultant EE Consultant FF Clinical care group 4

Scheduling You cannot schedule your way out of a capacity problem...

What doesn’t scheduling do? Solve problems of a mismatch of capacity and demand Deal with unusual events

Define capacity and demand: Capacity: 180 patients per month Activity: 160 patients per month Demand: 200 patients per month Backlog: 350 patients Scheduling will not resolve this problem

The solutions: Increase Capacity to match Demand Decrease Demand to match Capacity There are no other options!

Define capacity and demand: Capacity: 240 patients per month Activity: 160 patients per month Demand: 200 patients per month Backlog: 350 patients But it might solve this one...

An example of scheduling the bottleneck Prepare bowel Prepare patient Scope Write notes Recover balance Patient Nurse Endoscopist Identify the - number of people - number of rooms - pieces of equipment available 2 loos for preparation 1 theatre for scoping 1 nurse for preparation 1 scoper for scoping and writing notes 4 recovery chairs for recovering balance Flexi-sigmoidoscopy

Line up the templates Only 1 endoscopist, so cannot start 2nd patient till endoscopist free Only 2 loos, so cannot start the third patient until a loo is free! What is the constraint? (defining capacity) What is the bottleneck? (current limit on activity) endoscopist can’t start till late Wasted time Only 4 patients done

What solutions can you suggest? Add another endoscopy suite Add more toilets Get patients to do the bowel prep at home

Fix the loos and set new templates… 11 patients done in the same time! Appointment times set so that the endoscopist starts on time Schedule the template around the constraint

What are the risks? Some patients will not come fully prepared They will have to be rescheduled to another day or at the end of the clinic Do not schedule to 100% utilisation of the scarcest resource Do you want to fly in a plane that is scheduled to use 99% of the available fuel to get to its destination? Remember that capacity is 80% of the fluctuation in demand

The road to ruin: Capacity plans and contracts based on average past activity Fail to deliver required activity Income less than expected Cost cutting initiatives Fail to account for variation in demand Reduces effective capacity Guarantee waiting times beyond emergency and elective targets Increase staff overtime & waiting list initiatives Increased costs Increased variations in capacity Fail to account for variation in capacity +

The road to financial health Capacity planning and contracts based on variation in demand Income guaranteedCosts controlled increases productivity Required activity guaranteed No waiting beyond emergency or elective targets Staff capacity to reduce variation in capacity