GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
Chandra User’s Committee Meeting (6/27/04) P. Slane (Chandra Mission Planning) Constrained and Coordinated Observations Chandra Mission Planning Response.
NOAO/Gemini Data workshop – Tucson,  Hosted by CADC in Victoria, Canada.  Released September 2004  Gemini North data from May 2000  Gemini.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
LAT IOC GLAST Science Support Center September 25, 2002 LAT Science Tools Review Supplemental Slides Seth Digel (Stanford University/HEPL) David Band (GLAST.
LAT Data Server Workshop - 1 Jan 13-14, 2005 Tom Stephens GSSC Database Lead GSSC LAT Data Server Overview.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Mission Operations and Data Flow Overview Koji Mukai Astro-E2 Guest Observer Facility.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
GLAST Science Support Center June 6-7, 2005GLAST Users’ Committee Meeting GSSC Report David Band for the GLAST SSC.
Advance and the Electronic Packet Advance and the Electronic Packet April 5,
UPC/SHMEM PAT High-level Design v.1.1 Hung-Hsun Su UPC Group, HCS lab 6/21/2005.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
Enrolment Services – Class Scheduling Fall 2014 Course Combinations.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Presentation on GLAST Data Policies to Users Working Group October 22, 2003 GSFC Jonathan F. Ormes – Project Scientist Donald A. Kniffen - Program Scientist.
06-1L Suzaku Suzaku UG - 13 Dec, 2007 Suzaku processing and archive Lorella Angelini/HEASARC.
The GLAST Science Support Center’s Role in Supporting the User Community [24.10] Thomas E. Stephens (GSFC/L-3GSI) for the GLAST Science Support Center.
ENL1819T Progress Report Confidence in Our Success.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Serving Data to the GLAST Users Community Thomas E. Stephens (GSFC/RSIS) for the GLAST Science Support Center Abstract.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
GLAST Science Support Center November 8, 2005 GUC Meeting GSSC Report David Band (GSSC/JCA-UMBC)
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
Limited Submissions NCURA Region III Spring Meeting.
GLAST Science Support Center May 8, 2006 GUC Meeting Status of GLAST User Support David Band (GSSC/JCA-UMBC)
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Fermi Science Support Center September 26, 2008 FUG Face-to-Face Meeting Fermi GI Program Update David Band, FSSC CRESST/GSFC/UMBC.
1 Getting Involved with GLAST Workshop, CFA, 06/21/ C. Shrader, NASA/GSFC GLAST Data & Software Release plans + Science Support Center Services C.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST Science Support Center GLAT Users’ Committee Meeting Scheduling GLAST Observations Robin Corbet
APT Visit Planner Review Chris O’Dea. The Gallant Crew v Chris O’Dea - Project Scientist v Jesse Doggett - Software Engineer/Coordinator v Tricia Royle.
Monitoring GLAST Operations: Building tracking displays for the LAT Instrument Science Operations Center By Christina Ketchum.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
GLAST Science Support Center November 8, 2005 GUC Action Item #15 AI#15: Pre-Launch GI Proposal Tools David Band (GSSC/JCA-UMBC)
The GLAST Science Support Center
Introduction to the Astronomer’s Proposal Tool (APT)
TCP - Part II.
Declaring intent in leo
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
GLAST Large Area Telescope:
GLAST Large Area Telescope
ENTSO-E Transparency Platform Vision Project
David Band – Science Lead, GSSC
GLAST Large Area Telescope
Pair Programming Assistant
LAT Operations Scenario Subsystem Meetings
COD Processing and Changes for
Presentation transcript:

GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC

GLAST 2 November, 2005 GLAST Scheduling The GSSC will use TAKO to create observation schedules (“science timelines”). These will contain both sky survey and pointed observations. TAKO is being used for Swift and Suzaku (Astro-E2) and is being tested for RXTE. GLAST-TAKO has had its second release and contains basic functionality.

GLAST 3 November, 2005 Observation Proposal Submission Proposals will be submitted using standard RPS (Remote Proposal System) as used for RXTE, Suzaku, Integral. David Band will discuss RPS later today. RPS will be used for GI proposals and TOO requests. RPS will also be used for calibration requests by IOCs. Accepted proposals transferred from OGIP database to GSSC database.

GLAST 4 November, 2005 Long- and Short-Term Schedules TAKO will be used for both long-term (a complete GI cycle) and short-term (weekly) scheduling. The same master database will contain all scheduling information. i.e. both long-term and short-term. TAKO can apply a variety of constraints such as time of day or periodic constraint such as binary phase. TAKO will combine together accepted proposals and Sky Survey observations to create a Long-Term Schedule. The time precision for the Long Term Schedule will be 5 minutes, but they will be saved in weekly “bins”.

GLAST 5 November, 2005 Short-Term Scheduling Process (i) Because of TDRSS long lead time, the initial schedule (Preliminary Science Timeline) must be produced ~3 weeks ahead of being loaded to spacecraft. Initial version created and distributed to MOC, LISOC, and GIOC. MOC uses initial schedule to make TDRSS contact requests.

GLAST 6 November, 2005 Short-Term Scheduling Process (ii) LISOC and GIOC send corresponding instrument commands to GSSC. GSSC examines instrument commands for effects on science observations: –If any conflicts found, inform IOCs who will provide revised commands where appropriate. –If no conflicts, GSSC creates combined timeline (“Observatory Timeline Package”) including Final Science Timeline.

GLAST 7 November, 2005 Short-Term Scheduling Process (iii) Although the Science Timeline is initially generated well in advance of upload, it may be changed within a few days before upload if: –(i) TDRSS contacts not affected or –(ii) MOC agrees to loss of contacts (TDRSS overscheduled as expect to lose contacts to TOOs or ARs anyway). Before upload to spacecraft a final review is done (open to GSSC, LISOC, GIOC, & Project Scientists).

GLAST 8 November, 2005 Testing the Scheduling System Ground Readiness Test #2 (~June 28) included a basic test of scheduling scheme: –Initial distribution of TAKO generated schedule. –Reception of commands from LISOC/GIOC. –Transmission of Observatory Timeline Package to MOC. Continue to test scheduling in further GRTs. –GRT #3 in December will include more complete test of command/schedule flow between GSSC, IOCs, and MOC. RXTE planners are also evaluating TAKO and starting to use it for complicated scheduling.

GLAST 9 November, 2005 Enhancements to TAKO in Progress Full implementation of 17 point rocking profile. –Currently TAKO deals with fixed pattern (e.g. rock north for one orbit, rock south for one orbit.) –17 point profile gives capability for complicated rocking patterns. Display of instrument command times. Display of TDRSS contact times and warnings if TDRSS contacts would be lost by schedule change.

GLAST 10 November, 2005 Availability of Schedules All schedules will be publicly available on the web. Includes: –Long Term (1 year) Schedule. –Most up-to-date version of Science Timeline. For every week goes from: Preliminary -> Final -> As-Flown –As-flown may differ from Final due to TOOs, ARs, and any anomalies. Posting done by User Support tools which read information from the observation database.

GLAST 11 November, 2005 Simulations (“Planning Tool”) To (i) investigate sky coverage and (ii) simulate and test the scheduling process, a planning process has been designed: –Generate fake “proposals”. –Ingest into TAKO and create schedule. –Make FT2 files from Science Timeline. –Make exposure maps and calculate statistics. Entire process will be run from GUI wrapper to make it easier to use.

GLAST 12 November, 2005 TOO Submission/Execution (i) TOO requests start with RPS. GSSC alerted by paging system. GSSC provides assistance to Project Scientist in determining whether to carry out TOO. –Examine proposal –Look at review panel’s comments for pre-approved TOO –Compare coverage of target obtained with current science timeline compared to TOO If decide to do TOO, send TOO order to MOC with RA, dec., duration, ARR-interruptible flag. GSSC software for evaluating and submitting TOOs will be wrapped together by a password protected “Duty Scientist’s Assistant” web page to facilitate use at 3:00am

GLAST 13 November, 2005 TOO Submission/Execution (ii) The Operations section will provide a message to User Support which will cause the GUS to notify the proposer of TOO acceptance or rejection. MOC nominally provide 3 response messages to GSSC: –Acknowledgement – TOO order received. –Notification – they’re going to send TOO commands (or not). –Disposition - TOO commands sent to spacecraft. These will be available for posting to GSSC web page.

GLAST 14 November, 2005 TOO Issues ARR-interruptible flag needs to be added to definition of TOO order. Unclear whether ARR-threshold can be included in TOO order. –i.e. don’t allow AR interrupt by ordinary bursts, only by “burst-of-the-century” events. MOC question whether TOO “Notification” message is really necessary.

GLAST 15 November, 2005 After TOOs & ARs (i) The GSSC will use the as-flown-timeline provided by the MOC to see what was actually observed. Two types of as-flown-timeline: –Definitive, delivered number of days later. –Immediate preliminary version available on MOC web page (gain speed at cost of potential gaps in timeline). As-flown timeline also posted to web by GUS. Automatically check for difference between AFT and science timeline caused by (e.g. ARRs and TOOs).

GLAST 16 November, 2005 After TOOs & ARs (ii) Make decision whether to modify future science timelines because e.g. pointed observations were interrupted. –For urgent changes make early delivery of science timeline to MOC –For less urgent changes, modify observations in one or more subsequent weeks and deliver in usual way. –Or, where appropriate, make no changes to future science plans.