Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.

Slides:



Advertisements
Similar presentations
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Advertisements

Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Transportation Systems Highway Transportation Characteristics.
INTRODUCTION TO INFRASTRUCTURE: AN INTRODUCTION TO CIVIL AND ENVIRONMENTAL ENGINEERING Chapter 4: Transportation Infrastructure.
East Bay Bus Rapid Transit Project Description August 11, 2011.
9/7/2012 MBS UU.
MAXIMIZING THE AIR QUALITY BENEFITS OF BUS RAPID TRANSIT Walter Hook, BAQ Conference Agra, India, December, 2004 Funded by the US Agency for International.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Increasing the Quality of Public Transport in Prague Prague Integrated Transport.
BUS RAPID TRANSIT (AS PART OF ENHANCED SERVICE PROVISION) Workshop 2 1.
Prof. R. Shanthini 09 Feb 2013 Write down one word that comes into your thought when you read the following word: Transport.
The Urban Transport Problem  Fifth Freedom Problem- auto convenience and privacy  Congestion- traffic overloads, poor infrastructure, vehicle diversity.
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Transport for London and the Mayor’s Transport Strategy Steve Newsome Transport for London EMTA General Meeting, Madrid 31 March 2011.
ITS in Urban Transport Projects assisted by JASPERS Budapest – 17 June 2010.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
PUBLIC TRANSPORT ACCESS & RIDERSHIP: A CLEAN AIR ISSUE Geetam Tiwari Transportation Research and Injury prevention Programme Indian Institute of Technology.
Road Safety Strategy for Mexican Cities Alejandra Leal Vallejo October,
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
The Use of EMME/2 by Transek – an Overview “Fantasy and imagination is the limit” by Göran Tegnér Transek Consultants, Solna, Sweden Presentation for the.
Auroville, 22 March 2011 Slide 1 Managing mobility for a better future.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
BRT LOST IN TRANSLATION
LETS TAKE THE BUS!.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
Asia Pacific Economic Cooperation Transportation Working Group ITS Experts Group Busan, South Korea September 2, 2003 Walter Kulyk, P.E. Director, Office.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
CEO, Greater Cleveland Regional Transit Authority
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
The Sustainable Development The metro of Sofia (Bulgaria) and the rapid bus system in Astana (Kazakhstan)
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
7 May 2014 Sustainable transport vision for Greater Cairo.
Urban Sprawl Government notices problems in the 1980s –Urban sprawl –Car ownership rising (1960: 113/ : 422/1000) –Little housing for low income.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
EMTA General Meeting , Turin Tamas Dombi, ZTM Warsaw1 Actual Problems of the Public Transport in Warsaw Metropolitan Area.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
Internship Program WRI aims to ensure that cities drive economic opportunity while sustaining natural resources and improving quality of life. Through.
The Transportation Let’s learn the transportation we take. How did you get to the school?
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
The developments in Milan’s sustainable transport initiatives to reduce air and noise pollution Maria Berrini - CEO, Milan Mobility Environment and Territory.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Chapter 5 Sharing the Road.  When following a large vehicle, stay out of its "blind spots". Position your vehicle so the driver can see it in the side.
CEE 970 Colloquium Final Presentation Khalid Aljuhani Veronica Asare-Yeboah Ethan Frost Issam Kayssi Hannah Silber.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Add Your Thoughts: love 1.What do you love about your neighborhood? most want to change 2.What would you most want to change about your neighborhood? big.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
Project Unit 4 Writing an to give information.
Introduction To Rail. What is Rail? Trains Stations Staff Customers Infrastructure Industry Structure.
39th Meeting of APEC EGEE&C Sydney, Australia 28 February 2012
Measuring Walkability
A People’s Plan for Baltimore Transit
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
The impacts of motorization and what can be done to mitigate them
Reinventing Cities of Jharkhand
Achieving World Peace Shreya Gadepalli
Bus Rapid Transit Study
Traffic Safety.
City of Alexandria Virginia Transportation and Environmental Services
Central Avenue Rapid Transit
Erasmus Intensive Program
Presentation transcript:

Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

PROMOTING SUSTAINABLE AND EQUITABLE TRANSPORTATION WORLDWIDE

Aspiration ??

Cars don’t own our streets!

TRANSPORTATION IS NOT A TECHNICAL PROBLEM IT IS A MATTER OF PUBLIC POLICY

City buses are essential

WHAT IS THIS ??? METRO with a BUS !

Quality, Capacity, Safety, with Speed BRT systems that deliver world-class passenger experiences, economic benefits, and positive environmental impacts....not an old bus running in a bus-lane!

Buses have their own way Not stuck behind other vehicles. Bypass traffic jams 1 THE BASICS

Buses on the fast lane In the centre, not on the sides Continuous: not obstructed by slow moving vehicles, stationary vehicles, property accesses, and side lanes 2

All public transport users have to cross a road twice a day

No barrier is too high for people to cross. It is our job to make crossings safe.

3

Platform level boarding Matching station and bus levels Station ledge for gap-less docking Wide automated doors Passenger convenience: Safe & easy access for passengers of all ages, genders & ability Higher system speed: Quick boarding & alighting (saves up to 80% dwell time)

4

Off-board fare collection Higher system speed Convenience for passengers Prevents monetary leakage Automated ridership data

Three left turnsLeft turn + U-turn Left turn + 2 right turns 2-phase, not 4-phase. Right turns prohibited 5

Station Design and Bus-Station Interface Branding and Passenger Information Service Planning Infrastructure Integration and Access BEYOND THE BASICS 1

passengers/hour/direction Buses operated as train Bus Lane Tram / LRTMetro BRT 50000

Passing lanes at stations

“Build Metro with Buses!!!”

The BRT Standard: Ensuring quality