Height Aware Campaign. Background Work at height Who the campaign is for What will happen Work at Height Regulations 2005.
Hard Hats on Construction Sites
Safe working on or near roofs
Preventing Slips, Trips & Falls
Slips, Trips, and Falls Healthcare Workers Slide Show Notes
CONTRACTOR KILLED IN FALL FROM ROOF WORKING AT HEIGHT Work at height is work in any place at, above or below, ground level, where a person could be injured,
Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
Health and Safety Manual Section F9 Working at Height.
Workplace Safety Young Workers. Why is this important? Canadian statistics show that one in seven young workers are injured on the job. The leading causes.
Copyright  Progressive Business Publications Slip, Trip and Fall Prevention.
1 There are many activities in Well Engineering that involve Working at Height ! An unprotected Fall from a height as low as 1.5 meters can beFATAL.
Risk Management (Safe Work Method Statements)
MAKE SURE YOUR OWN ACTIONS REDUCE RISKS TO HEALTH AND SAFETY.
Avoid accidents by learning about these dangerous hazards.
Preventing Slips & Trips at Work
Electricity. Electricity Electric shock happens when a person becomes part of an electrical circuit and the current flows through their body. When an.
TWM STOP 5/02 Slide 1 To date in 2002 there has been, To date in 2002 there has been, 6 Lost Time Incidents & 55 injuries in Well Engineering (6 LTI’s.
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
Preventing Slips and Trips The safety modules may be used by anyone with the understanding that credit be given to AgSafe.
Site Staff & Management of Contractors February 2013 e.g. Trade Windows Mansards Roofing (Hot Permit work) Electrical Work CJR Electrics or L Electrics.
MNM Fatal Fall of Person Accident Fall of Person Accident April 18, 2007 (Arkansas) April 18, 2007 (Arkansas) Alumina Operation Alumina Operation.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
MNM Fatal Falling Material Accident Falling Material Accident April 21, 2009 (Tennessee) April 21, 2009 (Tennessee) Sand & Gravel Operation Sand.
Health & Safety in the Construction Industry
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
Safety Moment PDO Latest Fall from Height Incident
Safety Moment ‘No Holiday for Safety’
Working at Height How to comply with the new Regulations.
Portable Ladder Safety
PDO Safety Advice Date: LTI: Amputated finger
Let’s Talk Safety! Slips, Trips And Falls.
Injury: Fall from height
LTI: Fractured forearm
Never intervene to correct obstacles without stopping the activity
U.S.D.A. FOREST SERVICE REGION 6
Key Learning: Look for the green tag before accessing a scaffold
Risk MENTORING Alberta Construction Safety Association.
Click anywhere to get started…
Always think to use hands off technique.
Hazard Spotting Test – Incorrect Answers
Check & avoid potential Pinch points
PDO Safety Advice What happened? Your learning from this incident..
LTI: Finger Crush Injury Hands off suspend loads “Use Tagline”
Always observe safe pedestrian zones
THE RISK MANAGEMENT TOOL BOX
HSE LEARNING INCIDENT:
Ensure cat line are under tension before removing elevator bolts
PDO Safety Advice What happened? Your learning from this incident….
If in doubt – stop the job
LTI: Nipped Finger under slips handle Inspect equipment prior to use
Pay attention to your footing
Stay out of the “Line of Fire”
Learning from Incidents Engagement Pack
Risk Assessment – Space Only Stands
Ensure safety devices are working prior to starting work
PDO Incident First Alert - Carillion Alawi
Injury : fractured finger Keep your hands out of the line of fire
Be aware of potential pinch points
Always intervene an unsafe act
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Use the correct lifting device for the load
Keep away from “Line of Fire”
CLICK TO SHOW ANIMATION
Traffic Management Rok Safety Seminar 2007.
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
√ X HSE LEARNINGS INCIDENT: Root Causes: LEARNING:
PDO Incident First Alert - ATE
Falling From Height – Broken Arm
Presentation transcript:

Main contractor name – LTI# - Date of incident Workplace Safety Engagement Pack Volume 2014 Edition 1 Working at Heights

Main contractor name – LTI# - Date of incident PDO’s serious injuries from falls from heights increased by 75% in 2013 Already in 2014 we have suffered an electrician falling over 7 metres onto a marble floor due to unsecure barriers. We need to improve our focus and awareness on the dangers of working at height. Once you fall it is too late. Before working at height ask yourself is it safe ????? Working at Heights 2

Main contractor name – LTI# - Date of incident He fell from 7 metres ATE –LTI- 26 th February 2014 He is in intensive care with multiple fractures Incorrect scaffolding was used 3

Main contractor name – LTI# - Date of incident 4 B&C –LTI- 30 th August 2013 and broke his left forearm He fell from 1.3 metres

Main contractor name – LTI# - Date of incident 5 KCA Deutag, LTI - 4 th August 2013 and fractured his pelvic and collar bones He fell from 9 metres

Main contractor name – LTI# - Date of incident 6 Abraj Energy Services LTI – 4 th July 2013 and fractured his left leg He fell from 3 metres

Main contractor name – LTI# - Date of incident 7 ATE LTI - 16 th June 2013 and fractured his leg in two places He fell from 0.6 metres

Main contractor name – LTI# - Date of incident 8 Weatherford LTI - 20 th April 2013 and fractured his left knee CORRECT He fell from 1 metres

Main contractor name – LTI# - Date of incident 9 and suffered a fracture and spinal injury. ATE Nimr LTI - 17th April 2013 He fell from 2.6 metres

Main contractor name – LTI# - Date of incident 10 and fractured his wrist He fell from 2 metres KCA Deutag LTI - 3 rd February 2013

Main contractor name – LTI# - Date of incident 1.Not securing the ladder. 2.Taking a short cut to be quick. 3.Not replacing handrails which had been removed. 4.Not being vigilant and aware of the area. 5.Not considering the dangers. 11 Top 5 learnings from our fall from height victims last year All resulted in a fall from height…….

Main contractor name – LTI# - Date of incident Acceptance of poor design or practices. Lack of assurance of competency. Poor risk assessment and inspections. Inadequate management of change. Poor subcontractor management. 12 Top 5 tips of how our management controls failed last year All resulted in a fall from height…….

Main contractor name – LTI# - Date of incident 50% of surgical submissions to the main hospitals in the Emirate state related to falls and falling objects, –50%, 307 injuries, related to falls and falling objects –The injured were mostly male migrant workers aged between 22 and 44 (2003 to 2005, 614 occupational injuries,) Cause of FATAL occupational Injuries We can use Abu Dhabis’ information as a guide 13 Latest data available

Main contractor name – LTI# - Date of incident Workers Beware - Checklist 1.Has your Tool Box Talk today reviewed all the hazards of the work? 2.Have you reviewed your area for a risk of falling or dropped objects? 3.Are all fall and dropped object risk areas suitably protected with rails or toe boards? 4.Are ScaffTags in place to show a competent person has inspected the structure? 5.Have you checked that nothing has changed which affects your safety from working at height since you were last there? 14 If you think someone is in danger, STOP and intervene

Main contractor name – LTI# - Date of incident Management Beware - Checklist 1.Are you assured that the appropriate equipment to prevent or protect against falls from height is in place? 2.Are you assured that all equipment provided is fit for purpose for its intended use and maintained in good order? 3.Are you assured that employees have received adequate training to enable them to complete the work safely and method statements are understood? 4.Are you assured that work is properly supervised, checking what is actually happening on site and STOP bad practice? 5.Are you assured that your people are competent for working at height, which means having the right knowledge, training, skills and experience for the task? 15 SP1257 – (Scaffolding, Working at Heights or Over Water, Lifting Operations and Earthworks) Remember by May 1 st 2014 PDO will require all scaffolding personnel to have been assessed and then carry the appropriate competence Card..…… Don’t delay, competency assess today. For more information contact MSE12 – Kevin Doyle

Main contractor name – LTI# - Date of incidentWorking at height is a life saving rule 16 falling from a height can often kill, so pay special attention when working where you can potentially fall. PDO has been lucky so far….