Challenged Detectors – Volume- Occupancy Plots & Maps.

Slides:



Advertisements
Similar presentations
Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Grade Separation Alternative
Grade Separation (GS-16) Project. Project Location - Bensenville N.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
Hansen’s Truck Stop Inc. Property in Humboldt County Charlie Fielder District Director Caltrans District 1.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Model: Working Model Calibration Part 2: Results Renee Alsup DTA Peer Review Panel Meeting.
1 NATMEC 2008 Christopher Monsere Kristin Tufte, Robert L. Bertini, and Soyoung Ahn Intelligent Transportation Systems Laboratory Maseeh College of Engineering.
CTP1 Lane/Road Closures beginning 12/27/ W Vickery Blvd 12/27/11 Road closed between Forest Park and Summit 15 th Ave 12/27/11 Road closed at IH30 turn.
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
ROUNDABOUTS. What Is A Roundabout? A specific type of traffic circle Not all traffic circles are roundabouts.
Construction Update City Council Meeting October 26, 2010.
N TELEGRAPH RD Vehicle Position vs. Signal Timing for the Intersection of Telegraph Road and Maple Road Position 1: Vehicle entering intersection 0.1 seconds.
Transnow Student Conference February 9, Techniques for Mining Truck Data to Improve Freight Operations and Planning Zachary Horowitz Portland.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
USING PeMS DATA TO EMPIRICALLY DIAGNOSE FREEWAY BOTTLENECK LOCATIONS IN ORANGE COUNTY, CALIFORNIA Robert L. Bertini Portland State University Aaron M.
Wheely Wednesday Thursday, August 10, 2006 Wheels Around Edmonton aka Welcome to the Sides of your Tires.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Estimating Traffic Flow Rate on Freeways from Probe Vehicle Data and Fundamental Diagram Khairul Anuar (PhD Candidate) Dr. Filmon Habtemichael Dr. Mecit.
June 2006 ITE District 6 Annual Meeting June Evaluation of Single-Loop Detector Vehicle-Classification Algorithms using an Archived Data User.
Abstract The Portland Oregon Regional Transportation Archive Listing (PORTAL) is the official intelligent transportation systems data archive for the Portland.
Abstract The Portland Oregon Transportation Archive Listing (PORTAL) archives high resolution traffic data including speed, volume, and occupancy collected.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice May 9, 2007.
FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice November 8 th, 2007.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice September 6, 2007.
April 18, 2006 Dr. Robert Bertini Dr. Sue Ahn Dr. Chris Monsere Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice April 11, 2007.
“The Body” A Tiny Town Mystery. 5th Ave 4 th Ave 3 rd Ave 2 nd Ave 1 st Ave Zero St. Anteater Black Bear Cheetah Dolphin Elephant Rd. Ct. St. Rd. Hwy.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
1 Congestion Measurement Mark Hallenbeck TRAC. 2 Historical Use of volume data –AADT –AWDT, –Hourly volumes To estimate delays Can produce a reasonable.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
PORTAL Data Quality & Aggregation Sue Ahn, Kristin Tufte.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
July 13, 2005ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
Archived Data Management System in Kentucky Mei Chen, Ph.D. Dept of Civil Engineering University of Kentucky November 7, 2003.
I-270/MD 355 Simulator: An Intelligent Online Traffic Management System Dr. Gang-Len Chang Nan Zou Xiaorong Lai University of Maryland Saed Rahwanji Maryland.
ITE District 6 June 27, 2006 Incorporating Incident Data into a Freeway Data Archive for Improved Performance Measurement ITE District 6 June 27, 2006.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
Kidneys Fail, We Won’t 3 Days 100 Kilometres K-Country to Calgary September 11-13, 2015.
ITE District 6 June 27, 2006 Incorporating Incident Data into a Freeway Data Archive for Improved Performance Measurement ITE District 6 June 27, 2006.
“The Body” A Tiny Town Mystery. 5th Ave 4 th Ave 3 rd Ave 2 nd Ave 1 st Ave Zero St. Anteater Black Bear Cheetah Dolphin Elephant Rd. Ct. St. Rd. Hwy.
Well #4 – 801 Marchesano Drive Well #5 – 2526 Pelham Road.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Nixon Road Corridor Study: Findings & Options
Lane Volume Allocation
Friday, December 16th.
Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages CTS Transportation Seminar Series, January.
FM 518 By-pass Traffic Review
Signal Timing: Putting it All Together
STATE SUEE AND ONE WAY CORRIDORS
Progression of Text Levels Expected in Grades 1 - 5
Quaker Lane & Seminary Road/ Janney’s Lane March 14, 2013
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Current and proposed HOT facilities update
BAS DATA.
Average roller passes across traffic lane
Inscribed circle diameter
Presentation transcript:

Challenged Detectors – Volume- Occupancy Plots & Maps

High Percentage of No Data Readings Stations reporting No Data for > 5% of readings

Circled stations report No Data for > 30% of readings High Percentage of No Data Readings, Cont’d

High Percentage of No Traffic Readings Stations with detectors reporting No Traffic for > 10% of readings

High Percentage of No Traffic Readings Stations with detectors reporting No Traffic for > 10% of readings Circled stations have detectors reporting No Traffic for > 55% of readings

Vol > 17 >1% of readings

1049 I-5 S Lower Boones SB MP: Lane: 1

1050 I-5 S Lower Boones SB MP: Lane: 2 June 14, 206

Occ > 95% > 10% of readings

1050 I-5 S Lower Boones SB MP: Lane: 2 June 14, 206

1474 I-84 W Sandy WB MP: 2.4 Lane: 3

1121 I-5 N Multnomah Blvd NB MP: Lane: 1

1456 I-84 W 82 nd /Halsey WB MP: 4.9 Lane: 1

1123 I-5N Multnomah Blvd NB MP: Lane: 3

Speed > 100 > 15% of readings

1551 OR 217 South Walker Rd SB MP 0.76 Lane:1

Speed 50% of readings

1934 US26 E Jackson School Road EB MP 58.8 Lane:1

1050 I-5 S Lower Boones SB MP: Lane: 2 June 14, 206

1474 I-84 W Sandy WB MP: 2.4 Lane: 3

1244 I-5 S Swift Blvd/Marine Dr SB MP: Lane:1

1481 I-84 W 33 rd WB MP: 2.1 Lane:2

1434 I-84 E 16 th EB MP: 1.33 Lane: 3

Low Avg Occ (<4%)

1011 I-5 N Stafford Rd WB to NB MP: Lane:3

1099 I-5 N Pacific Hwy NB MP: Lane: 3

1205 I-5 N Denver Ave NB MP: Lane: 3

1206 I-5 N Denver Ave NB HOV MP: Lane:1

1348 I-205 N Sunnyside NB MP: 14.7 Lane: 4 MP alternatively listed as 14.32

1482 I-84 W 33 rd WB MP: 2.1 Lane: 3

1643 US 26 E Cornell Rd EB MP: 65.9 Lane: 1

1694 US 26 W Skyline Rd WB MP: Lane: 2

1787 I-205 N OR 43 NB-NB MP: 9.03 Lane: 2

1813 OR 217 S Barnes SB MP: 0.1 Lane: 1 MP alternatively listed as 0.08

Vol/Occ > +3 std dev

1049 I-5 S Lower Boones SB MP: Lane: 1

1115 I-5 N Spring Garden St NB MP: Lane: 3

1204 I-5 N Denver Ave NB MP: Lane: 2

1205 I-5 N Denver Ave NB MP: Lane: 3

1432 I-84 E 16 th EB MP: 1.33 Lane: 1

1523 OR 217 N Denny Rd NB MP: 2.68 Lane: 1

1920 US 26 W Bethany to US26 WB MP: Lane: 1