Possible Agenda Working Week Day one Introductory session 8:30 - 11:00 Organization and Goals Cathode Planes Requirements, Assumptions, Alternates Field.

Slides:



Advertisements
Similar presentations
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Advertisements

6.3 Parallel Plane Facts Objectives: 1.Recognize lines parallel to planes, parallel lines and skew lines 2.Use properties relating parallel planes and.
Week 12 More Info Lit Skills. Agenda Tech Talks (4x) Tech Talks (4x) Article analysis Article analysis APA Cheat Sheet APA Cheat Sheet APA Refs/Citation.
Stephen Milton 12 Jan IDR of Undulator System Fixed Supports 12 Jan
Reporting the Progress of the Joint Technical Actions Antenna/wire coupling in the near field A. Rubinstein EMC Group Swiss.
Cool Britannia and After British Literature, Culture, and Society from the 1990s to the Present Session Four: Helen Fielding, Bridget Jones’ Diary.
Chapter 26.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Coplanar lines that do not intersect.. Lines that do not intersect and are not coplanar.
Lesson 3-4 Proving lines parallel,. Postulates and Theorems Postulate 3-4 – If two lines in a plane are cut by a transversal so that corresponding angles.
By: Student #2. Four properties  Equidistant  Have same slope  Do no intersect  Lies on the same plane.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG J stewart - EFIG July
Angles and Parallel Lines
WEEK 1 You have 10 seconds to name…
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
3-4 Parallel and Perpendicular Lines
Lesson 2-5: Proving Lines Parallel 1 Lesson Proving Lines Parallel.
VOCABULARY UNIT 3. PARALLEL LINES Lines on the same plane that never intersect.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG.
Concept Design for LBNF Far detector (LAr single phase)
Team Teaching Methods “Teachers learn best from other teachers, in settings where they literally teach each other the art of teaching.” (Little, 1987)
PARALLEL LINES & TRANSVERSALS Parallel Lines - lines in the same plane that will never intersect.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
CHAPTER 3: PARALLEL LINES AND PLANES 3-1: DEFINITIONS PIB GEOMETRY.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Overview of 35ton Phase 2 Detector Bo Yu 35t Installation Readiness Review August 25, 2014.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
FC: Decisions, Issues, Next steps Bo Yu BNL Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Electrostatic FEA on Field Cage Profile Configurations Bo Yu.
Do Now: Success Criteria: Today’s Agenda Identify angles Write proofs
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
BUS 644 Week 2 Assignment Design of Work Systems Design of Work Systems. Read the “Making Hotplates” case. Answer questions 1-4 in a two to four (2-4)
MGT 330 Week 1 Individual Functions of Management Paper Prepare a 700- to 1,050-word paper in which you define the four functions of management (planning,
CJA 324 Week 1 Individual Personal Dilemma Paper To purchase this material click Individual-Personal-Dilemma-Paper.
PSYCH 555 Week 1 Individual Social Psychology Paper Check this A+ tutorial guideline at 555-Week-1-Individual-Social-Psychology-Paper.
Cathode Discharge Simulation
ProtoDUNE High Voltage Design
3.1 – 3.2 Quiz Review Identify each of the following.
7th HL-LHC Collaboration Meeting Madrid, November 2017 Preliminary programme and practicalities C. Noels, ATS-DO TCC Meeting – 23 June 2016.
Exterior Angle Theorem Parallel Lines Cut by a Transversal
Objectives Identify parallel, perpendicular, and skew lines.
Parallel Lines and Transversals
Opening Executive Session M.C.
NP04 CPA/FC/HV Interfaces
Additional Homework Assignment due next week in class.
CNSL 573 Innovative Education--snaptutorial.com
ENGL 147 Innovative Education--snaptutorial.com
مكتبة الإسكندرية ١٣ ديسمبر ٢٠٠٨ دكتور باسم أحمد عوض
הוראת מיומנויות של עבודה בקבוצה מחקר פעולה
Parallel Lines & Angle Relationships
MATH 1310 Session 1.
Parallel and Perpendicular Lines
Parallel Lines and a Transversal Line
Parallel Lines and a Transversal Line
National Groundwater Modelling System Software workshop pre-release PR07 Peter Gijsbers.
3-2 Properties of Parallel Lines
VOCABULARY (Definitions)
3-5 Proving Lines Parallel
Parallel Lines and Transversals
WARM UP 1. Name the alternate interior angles
3-2 Angles and Parallel Lines
The Motion of Charged Particles in Magnetic Fields
1. Which angle is equal to 1100? 1100 corresponding.
GOVT 518 Week 2.
3-2 Proving Lines Parallel
Presentation transcript:

Possible Agenda Working Week Day one Introductory session 8: :00 Organization and Goals Cathode Planes Requirements, Assumptions, Alternates Field Cage Requirements, Assumptions, alternates APA Requirements, Assumptions, alternates Ground plane Installation Coffee Introductory session 8: :00 Organization and Goals Cathode Planes Requirements, Assumptions, Alternates Field Cage Requirements, Assumptions, alternates APA Requirements, Assumptions, alternates Ground plane Installation Coffee Parallel Working Group Field Cage Cathode Planes Parallel Working Group Field Cage Cathode Planes Parallel Working Group APA - Cryostat Parallel Working Group APA - Cryostat Parallel Working Group Installation Parallel Working Group Installation

Possible Agenda Working Week Day Two and Three Joint Session session 8: :00 Progress Field Cage and ground plane Progress Cathode Planes Progress APA mounting Progress Installation Joint Session session 8: :00 Progress Field Cage and ground plane Progress Cathode Planes Progress APA mounting Progress Installation Parallel Working Group Field Cage Cathode Planes Parallel Working Group Field Cage Cathode Planes Parallel Working Group APA - Cryostat Parallel Working Group APA - Cryostat Parallel Working Group Installation Parallel Working Group Installation

Possible Agenda Working Week Day Four Joint Session session 8: :00 Field Cage and ground plane –Work plan, assumptions, and open questions Cathode Planes - Work plan, assumptions, and open questions APA mounting - Work plan, assumptions, and open questions Installation - Work plan, assumptions, and open questions Joint Session session 8: :00 Field Cage and ground plane –Work plan, assumptions, and open questions Cathode Planes - Work plan, assumptions, and open questions APA mounting - Work plan, assumptions, and open questions Installation - Work plan, assumptions, and open questions