Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal.

Slides:



Advertisements
Similar presentations
July Cornell ALC Workshop Gene Fisk1 LC Muon Detector Studies Overview (mostly recent prototype hardware development plans) Fermilab A. Bross, B.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Dhiman ChakrabortyCal+mu+p-id+test-beam summary LC workshop, Cornell, 16 July, '03 2 Calorimetry Performance goals Electromagnetic Calorimetry (ECal)
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
1 Prototyping Megaton-Scale  Detectors Jason Trevor DOE Review July 25, 2007 Developing a New Lower-Cost Scintillator Design.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
P. Karchin – Scintillator Based Muon System Collaboration page 1 1/8/2004 January 8, 2004 American Linear Collider Physics Group 2004 Workshop Stanford.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
LCD Muon/PID Meeting Friday Oct 29, SUBSCRIBE FIRSTNAME LASTNAME There are "underscores" between: Fermilab, LC.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
Dhiman ChakrabortyCalorimetry + muon/p-id summary LC workshop, Cornell, 16 July, '03 2 Calorimetry Performance goals Electromagnetic Calorimetry (ECal)
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
US ILC Muon Detector and Particle ID R&D DOE/NSF ILC Detector R&D Review Argonne National Laboratory June 19, 2007 Paul E. Karchin Wayne State University.
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Study of Sampling Fractions Shin-Shan Yu, A P, Hans Wenzel, October 18, 2006.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
LC Scintillator-based Muon/Tail-catcher R&D Analysis of 9/06 MTest Data Calibration of Multi-Anode PMT Channels Bench Testing and Measurements of SiPMs.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Neutron Shielding Harry Nelson CDMS EAB August 5, 2004.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Muon/Special Detector Studies Update St. Malo Muon ID - Single muons, single pion rejection. TESLA TDR (M. Piccolo) 2. Muon ID events:  ID efficiency,
1 ILC/SiD Muon System Progress Colorado State – D. Warner, R. Wilson Fermilab – G. Fisk, C. Milstene UC Davis – J. Lizarazo, M. Tripathi Indiana University.
1 Scintillator Based Muon System R&D Institutions/Collaborators Fermilab: A. Bross, B. Choudhary, H.E.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
LCD Muon Studies – FY03 Progress Report University of California, Davis Fermilab Northern Illinois University University of Notre Dame Wayne State University.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Simbol–X workshopMay 14th, 2007 The Simbol-X Detector Payload P. Laurent CEA/Saclay & APC.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
A Magnetic Detector for MINERvA G. Tzanakos, University of Athens Modular Structure Fe Torroids, strong Toroidal Magnetic Field Scintillator strips WLS.
Muon triggering system for the ALICE TOF cosmic tests for the ITEP Moscow: A.Akindinov Yu.Grishuk S.Kiselev D.Mal’kevich M.Ryabinin A.Smirnitski K.Voloshin.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
06 FEB th ACFA Development of fine strip scintillator with extrusion technique SungHyun Chang, DongHee Kim, Jun Suhk Suh, Youngdo Oh, Daejung Kong,
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Beta-ray test for strip scintillator readout MPPC GLD Cal group KEK 06/2/28 (Tue) Niigata university Sayaka IBA.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research Dubna, 25 th January, 2007.
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
SiD Muon System H. R. Band University of Wisconsin H. E. Fisk Fermilab.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Scintillator-based Muon System G. Fisk, A. Para, P. Rubinov - Fermilab, D. Cauz, A. Driutta, G. Pauletta - IRST/INFN-Udine, R. Van Kooten, P. Smith - Indiana.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Roberto Calabrese Ferrara University and INFN
H.E. Fisk, A. Meyhoefer, A. Para, E. Ramberg, P. M. Rubinov Fermilab
Detailed Baseline Design - Muons
EURONu Collaboration Board,
H. R. Band University of Wisconsin H. E. Fisk Fermilab
IFR Status Summary W. Baldini on behalf of the IFR Group
Muon Strip-scintillator + WLS + Pixelated Photon Det. Testing
Design of the He and HB ODU
IFR detector mechanics
SCINTILLATOR HARDWARE
Study of a Scintillating Digital Hadron Calorimeter Prototype
LC Muon Detector Development Overview
Presentation transcript:

Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal. 15 min.Paul Karchin 10 min.Mani Tripathi Readout Options: MINOS 15 min.Adam Para UC Davis Studies 15 min.Mani Tripathi Muon ID in b-b_bar events 15 min.Caroline Milstene

Prototype Module Layout 2.5m 5.0 m 43 full strips 3.6m (L) x 4.1cm (W) x 1cm (T) 43 short strips 3.6m => 0m long Read out: both ends of full strips; one end of short strips (except the shortest 22). 2*( ) fibers/side =128 channels = 8 (1.2mm dia) fibers/pix * 16(4 x 4mm 2 ) pixels => Equivalent of One MAPMT/prototype plane

How many prototype planes & strips? Each plane is the equivalent of 86 strips that are 3.6 m long. Each strip has a mass of 1.52 kg or 3.3 lbs. The weight of a plane (86 strips) is 131 kg or 288 lbs. Order 15% extra scintillator – 100 strips per plane or 330 lbs (152kg). 3 u & 3 v to over-constrain a straight line = 6 planes + one spare to use for resolving multi-hit ambiguities + one to learn the construction technique. => 8 planes. Total scintillator is 2,341 lbs (1.17T) or 700 strips or Tonnes. Scintillator Cost - MINOS paid ~ $10/kg or $10K/tonne. Assume a 50% add’l cost for a small order: $16K

Fiber quantities and costs WLS Fiber Buy enough to instrument every strip: 100 strips*3.6m/strip = 360 m times 8 planes (one to learn on). => 2.88km Kuraray quote of $3.29m => $9,475 plus shipping & duty so add $1,500, which brings the total to: $11K WLS Clear Fiber From engineering drawing: Short near strips: 21*4.6 m = 97m Full strips: 43*(4.6m +2.3m) = 297m Short far strips: 21*4.3m = 90m Total 484m => 550m times 8 planes 4,400 m Clear cost = 4.4km*$3.11K/km = $13.7K +$1.5K = $15.2K Clear

Other fiber and layout costs (Mitch Wayne- Notre Dame) Polishing and splicing: Material costs – teflon tubes $3.0K Ice polishing + splicing: 32 hrs*$48/hr $1.5K Plastic sheets for fiber routes: $10/sqft: acrylic or $6/sqft: Lexan ($6-$10/sqft)*110sqft/sheet*8 sheets $ K Machining of plastic sheets: 20 hrs of programming*$40/hr = $0.8K 60 hrs Gerber routing*$40/hr = $2.4K Total machining of plastic sheets $3.2K

Multi-anode Photomultipliers 16 channel multi-anode PM 30mm Hamamatsu H anode PM’s come in two varieties: w/ or w/o base. H with base $ ea. for 6 or more. R M16 w/o base $ ea. for 6 or more. We will need at least 14 MAPMTs for R&D: 8 for the 7 planes; 2 to replace two loaner tubes (spares); 4 for bench tests of electronics; Procure 7 w/bases; 7 w/o bases. Cost: $9,036 + $7,080 = $16,116

Incomplete R&D Cost Estimate