Keeping Mapping Data Current on Long Duration Projects James H. Anspach, P.G. Project Manager (2003-2008) Utility Mapping Alaska Way Viaduct Project, Seattle,

Slides:



Advertisements
Similar presentations
Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
Advertisements

SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC.
PGR Student Introduction to TurnitinUK OriginalityCheck Software Last updated January 2015.
IIT Kanpur Web Based Land Records Management System Prof. P.K.Kalra Developed by Department of Electrical Engineering Indian Institute.
Chapter 3 Creating a Business Letter with a Letterhead and Table
Exhibit A and B Duane Fournier Utilities Regulation Engineer Safety and Engineering Section (515)
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
This presentation is designed to provide you information about Budget Transfers You can advance to the next screen at any time by hitting the forward.
By Kayla Paige Click to Begin!. Try Again! The relationship of width to height in a picture or shape is: A. Crop Crop B. Aspect Ratio Aspect Ratio C.
D AA R Michael P. Doble, P.E., , PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL.
Expansion and Update of the City of Spokane and SAJB Spokane Valley Rathdrum Prairie Aquifer Model Doug Greenlund City of Spokane March 26, Spokane.
Gwinnett County’s Post Development Stormwater Management Program
© 2010 Ariba, Inc. All rights reserved. Style Mapping and Document Properties – Ariba Contracts Professional – Session Two Jasna Sadikovic– Solution Consultant.
What is it? How to Navigate it. How to Understand it.
Integrated Enterprise System 11/1/11Create travel expense report ESS 6.03 vers Employee Self Service – Create a Travel Expense Report tutorial Effective.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Health & Safety Site Verification Audit Procedural Training F b RevNo: 0 / Omni Facility Services Health & Safety Site Verification Audit.
University of Waterloo Library : Using GIS for Managing Information Using GIS for Managing Information : Keeping Track of your Records Eva Dodsworth, Geospatial.
U.S. Department of the Interior U.S. Geological Survey Alabama Water Science Center StreamStats: By Kernell Ries and J.
October 2003Bent Thomsen - FIT 3-21 IT – som værktøj Bent Thomsen Institut for Datalogi Aalborg Universitet.
MAIL MERGE Designing Documents with. Terms Mail Merge: A process that inserts variable information into a standardized document to produce a personalized.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
MnDOT-ACEC/MN Annual Consultant Conference March 5, 2012 Leveraging SUE Data for Utilities on Projects Tom Swafford- Utility Mapping Services, Inc.
Using GaCounts Data to Assist in the Development of Faculty Activity Reports for County Agents Updated October 3, 2014 Marcie Simpson, Program and Staff.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
1 Data List Spreadsheets or simple databases - a different use of Spreadsheets Bent Thomsen.
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Data Collection and Quality Assurance Ron Howard Jr., EI Environmental Coordinator Russell Koenig, PS, EI Surveyor DLZ Ohio, Inc Ohio GIS Conference.
Committed to Shaping the Next Generation of IT Experts. Exploring Microsoft Office Word 2007 Chapter 4: Share, Compare and Document Robert Grauer, Keith.
Committed to Shaping the Next Generation of IT Experts. Exploring Microsoft Office Word 2007 Chapter 4: Share, Compare and Document Robert Grauer, Keith.
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Creating Report Templates.
Service Order Screens Through Utility Billing. Choose option 70 Service Orders to enter the service order entry screen. Main Menu.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 5 Enhancing Forms with OLE Fields, Hyperlinks, and Subforms.
With Excel 2007 Comprehensive 1e© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft Excel ® 2007 Comprehensive 1e Chapter.
D AA R Michael P. Doble, P.E., , PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL.
Underground Cost Analysis; Option 10 and 11 - TRTP Project Project Segment 8A Corridor October 21, 2012.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
Final Presentation Ivan Tam Lindsay Tabas Katrina Rhoads John Mark Josling.
® Microsoft Office 2010 Integrating Word, Excel, Access, and PowerPoint.
Integrated Enterprise System 6/1/15Create travel expense report ESS 6.03 vers Employee Self Service – Create a Travel Expense Report tutorial.
STANDARDIZATION OF UTILITY BID ITEMS AND DESCRIPTIONS FOR ROAD CONTRACTS.
Sequence Diagrams And Collaboration Diagrams HungNM.
5 different skills using Microsoft Office PowerPoint.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Working with Data Lists.
Objectives © Paradigm Publishing, Inc. 1 Objectives.
Securing and Sharing Workbooks Lesson 11. The Review Tab Microsoft Excel provides several layers of security and protection that enable you to control.
Committed to Shaping the Next Generation of IT Experts. Exploring Microsoft Office Word 2007 Chapter 4: Share, Compare and Document Robert Grauer, Keith.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
TABLE OF CONTENTS 2014 BasmahAlQadheeb. What is a report? A report is a clearly structured document that presents information as clearly as possible.
CIS—100 Chapter 8—Tracking Changes 1. Turning on Track Changes On the Review tab, in the Tracking group, click Track Changes. The background of the Track.
Parking Study Analysis Prepared by : Mashel ALDaajam Mohammed ALMasand and Mohammed ALMannaa.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
3 CDBG Disaster Recovery Waterway Debris Program Wednesday, January 13, 2010.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
LEARN TO FORMAT TABLES Unit 10: Lessons What is a Table? ◦ A table is an arrangement of data (words and/or numbers) in rows and columns. ◦ A table.
Join us on Twitter: #AU2013 Substation Assemblies for Inventor Arnold Fry Justin Eyre Manager, Transmission Standards Engineering Technologist.
How To Read MS811 Locate Request Tickets
Shelly Cashman: Microsoft Word 2016
1st Assignment Use this template Open Offical Course Syllabus or adlib
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Auditing with GPS and on-board recording devices
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Information System Analysis
REPLACE THIS TEXT WITH YOUR TITLE
How to Work with Scribe Syndicate
Bent Thomsen Institut for Datalogi Aalborg Universitet
Presentation transcript:

Keeping Mapping Data Current on Long Duration Projects James H. Anspach, P.G. Project Manager ( ) Utility Mapping Alaska Way Viaduct Project, Seattle, WA

Project Details About 110,000 vehicles use the viaduct each day. The viaduct is 2.1 miles long. The existing structure has an overall width of 51 feet (near Madison Street).

Original Mapping Scope of Work  All utilities at QL B when possible  Access every structure  Direct Connections  Depths of all pipes, cables, conduits  Sizes of all pipes, cables, conduits  Description of utility endpoints  Entered every basement  Conductor inserted into every empty conduit  Pipe & Cable Locators, GPR, Elastic Wave, Magnetic, Terrain Conductivity all used  Every cable/conduit tracked down, accounted for, and marked

Results 8+ miles of city streets averaging 20+ conductors = 1,000,000 feet of utilities +/- 7 year effort as areas of interest expanded due to geotechnical and utility issues Entered over 1000 communication and electric vaults and documented contents

Problem: How to keep utility data current  Extensive construction by City for IT conduits, security cameras.  Numerous building projects changing/adding service connections  Normal improvements with 8+ miles of City streets  Extensive communication work near stadiums  Advance utility relocation work taking place

Procedures on a yearly basis Walk entire project limits with existing utility mapping in hand –Check every utility pole for new risers and/or new appurtenances/attachments –Look for “new” street patches (on first update, sketched all patches on plans for future comparison) –Look for ongoing long-duration construction projects Aquarium, Art Museum, Stadium district, new roads

Procedures on a yearly basis  Research Permits issued by the City within previous year  If it appeared as if work could involve any utility work (new, abandoned, removed, replaced), re-designate area.  Ask all utility owners (including different City Departments) for any new records within the past year  Re-designate areas where utility changes from records  Research all one-call tickets within project limits for previous year  If appeared to be utility related, re-designate area

ISSUE: How do you communicate any changes to the mapping to the 200+ persons using that data? AutoCADD file with area of any changes “clouded” (outline and translucent mask) New utilities in bold thick line style Note (text box) with call-out arrow Accompanying WORD text document Second AutoCADD file with all changes “accepted” in normal line codes, colors, and with call-outs and clouds removed.

Level of effort  Depended upon amount of changes, but on average:  40 hours for reviewing One-Call tickets for applicability in the office  40 hours for walking project with plans in hand  40 hours for researching new permits  crew hours for designating, surveying any changes  60 hours CADD and professional review and engineer’s “seal” of final results  About 5% of initial effort  If not done annually, quality suffers and percentage of time increases.