Environmental Management Review of Corporate Projects.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

HIV Drug Resistance Training
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Shared Services Vision
Objectives Terminal Objective
Department of Environmental Quality Environmental Management System Overview.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
An Intro to Professionalizing Procurement & Strategic Sourcing
Introduction to Enterprise Risk Management (ERM)
Green Remediation An Overview of the State of the Practice
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
Managing Risk in Information Systems Strategies for Mitigating Risk
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
The Evergreen, Background, Methodology and IT Service Management Model
Engaging Contractors in the Environmental Management System (EMS) Department of Energy EMS Workshop: Implementation, Lessons Learned, and Best Practices.
Global Program Management Dawn Davis, SVP Global Records Management.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
From Research Prototype to Production
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Acquisition and Contract Management Update Jay Rhoderick Associate Deputy Assistant Secretary for Tank Waste and Nuclear Material AtomEco-2012.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
Disaster Recover Planning & Federal Information Systems Management Act Requirements December 2007 Central Maryland ISACA Chapter.
National Centers for Coastal Ocean Science Environmental Management System Implementation August 2005.
EM-1 Office of Environmental Management Building the FY 2003 Budget u Transition budget to begin implementing the top-to-bottom review u Budget consists.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
INL SNF PROGRAM presented to National Spent Nuclear Fuel Program Technical Exchange Meeting November 8 - 9, 2005 Washington, DC presented by R. O. Ramsey.
Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
Environmental Management Systems National Ocean Service National Centers for Coastal Ocean Science March 1, 2006.
Planning for FY08: Managing the Transition of the LM Organization December 2004.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Office of Environmental Management U.S. Department of Energy Environmental Management.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
SCHOOLS FINANCE OFFICERS MEETINGS Records Management, “Paper-Lite” Environments and Procedures when a school closes Elizabeth Barber.
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
DOE’s “New” National Strategy for Waste Management Christine Gelles Director, Commercial Disposition Options, EM-12 Office of Environmental Management.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
Laboratory Operations Board
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Update to National Governors’ Association Patty Bubar Associate Deputy Assistant Secretary Office of Integration and Disposition May 16, 2002.
PPBS Planning Programming Budgeting Systems. PPBS The Department of Defense is the only Agency to use this type of budget.budget.
Program Manager’s Review Joe Christy September 19, 2005.
National Center for Coastal Ocean Science Environmental Management System Implementation August 2005.
Dale Emmerson 75 FSS/FSD Chief, Force Development Flight I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Sustainment Center AFSC Way.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Overview of Environmental Management Systems Using ISO John Rupe Forest Service Rocky Mountain Region.
Waste Management Working Group FY2016 EFCOG Annual Meeting Sonny Goldston Atkins Global Working Group Chair June 7, 2016.
Lifecycle Services for Advanced Wireless LAN (LCSAWLAN) practice-questions.html.
Oak Ridge Office of Environmental Management Update
Presentation transcript:

Environmental Management Review of Corporate Projects

EM Goals from November 2001: Improve Safety Performance Reduce the cost and time required to complete cleanup Close Rocky Flats, Fernald, Mound and 6 other sites by 2006 Improve approach to high-level waste

EM Goals from November 2001: Consolidate nuclear material Make EM a better customer Shrink the EM footprint Get waste to disposal facilities quickly Reshape EM systems & infrastructure to drive accelerated cleanup

Why did we create corporate projects? We could not reform the system from within…we had to continue to do work while creating change We wanted a different approach and new ideas We wanted to drive managing EM as a project We wanted to develop next generation of leaders

Corporate Projects Getting more performance from performance based contracts National Focus Project Managing waste to reduce risk-other than SNF and HLW Integrated/risk-driven disposal of SNF Managing waste to reduce risk-HLW Focusing EM resources on cleanup Safeguards and Security/Nuclear material consolidation A Cleanup Program driven by risk-based end states

Getting more performance from performance based contracts What we found: We were getting the performance we were asking for in the contracts. What we did: Developed a contract review process and Implemented Contract Management Advisory Council Developed 5-Year Acquisition Plan Developed aggressive Small Business Contract Strategy Restructured all large contracts tying fee to objective, measurable, and meaningful performance Developed integrated training program for EM Managers Developed Source Evaluation Board Guidance

Getting more performance from performance based contracts What we learned: You can’t change performance unless you change the expectation FIRST Getting the acquisition process right is essential EM needs to become better contract managers Small businesses are key to our future success The project team developed tools, but success can only be measured by the acquisition process, the contract, and its execution

National Focus Project What we found: “Small” sites aren’t really small…they cost EM $600M annually What we did: Worked to develop project baselines at the small sites, starting with requirements and ending with completion

National Focus Project What we learned: Its as hard to get baselines in place at our small sites as it is at our largest sites Establishing requirements is one of the single most important elements in project management We can’t afford to lose ‘focus’ on our small sites again

Managing waste to reduce risk-other than SNF and HLW What we found: We weren’t using our disposal sites and infrastructure as effectively as we should have What we did Placed the WIPP baseline under configuration control Made over 800 shipments of waste to WIPP in FY03…eight sites shipped TRU waste last year Made record shipments of LL and LLMW in FY03 Started to manage the transportation infrastructure

Managing waste to reduce risk-other than SNF and HLW What we learned: We still don’t have a site to dispose of LLMW nCi/gram Waste management/disposal costs EM over $1B/year The best waste is the waste that is never generated…need to control waste at its point of generation or before We have to change our approach to waste through the contract

Integrated/risk-driven disposal of SNF What we found: SNF disposal was not thought of as an integrated DOE system What we did Designed a DOE-wide SNF disposition system Developed a business and risk-driven strategy to accelerate transfer of all EM-managed SNF Identified opportunities to reduce risk, cost, & schedule by avoiding unnecessary treatment and packaging activities. Closed 5 SNF basins in last 16 months

Integrated/risk-driven disposal of SNF What we learned: This is a very complex issue…this project will go on into FY04 There are things we can do today to decrease the risk Wet to dry storage Consolidation

Managing waste to reduce risk-HLW What we found: SNF and HLW disposition are the single largest cost element in the EM program today What we did Provided a technical risk-based approach for the disposition of HLW and associated facilities Developed and defined HLW processing and disposal alternatives that permanently dispose of HLW consistent with its risk, as quickly and cost effectively as possible

Managing waste to reduce risk-HLW What we learned: This is a very complex issue…this project will also go on into FY04 There are things we can do today to decrease the risk Get waste out of single shell tanks Optimize production Decrease volume

Focusing EM resources on cleanup What we found: EM as an institution was not managing its own resources effectively…we were the third highest cost in the closure project What we did: Eliminated unnecessary activities and transferred non- core functions to appropriate organizations Focused resources on accelerating risk reduction Institutionalized our new business processes

Focusing EM resources on cleanup What we learned: To reform the system required that we reform EM is responsible for cleanup…its role needs to be spelled out in the contract Leaders inspire change, however, changing the institution is the only way to ensure that the change is lasting Change will be the only constant

Safeguards & Security/SNM Consolidation What we found: Safeguards and security costs EM over a quarter-billion dollars annually…doing nothing is not an option What we did: Focused on EM accountable quantities of SNM that were not contained in SNF, HLW, or other waste forms Provided policies and objective for consolidation & disposal of EM excess SNM to enhance security and reduce risk

Safeguards & Security/SNM Consolidation What we learned: Although the system is complicated, we can do this Stabilization and packaging material is key DOE-wide integration key

A cleanup program driven by risk-based end states What we found: We absolutely needed to look at this corporately What we did Generated a DOE Policy for Risk-Based End States Prepared site-specific Risk-Based End State documents Developed a corporate strategy to implement the policy and achieve the RBES goals

A cleanup program driven by risk-based end states What we learned: Coming in the next presentation

Safety Safety needs to improve before work can be accelerated In the last 2 years, EM has seen a 40% improvement in recordable case rates and lost work day case rates… …but we are not satisfied with our safety performance We need to see at least that much improvement in safety in the next two years if we are going to be successful Outstanding safety performance is a requirement to do work at our sites Federal Managers will be held accountable for safety at their sites

What did we learn?

A lot of ideas that no one had ever thought about…we were forced to look at things differently as an institution We had set back, restarts, and failures…but we learned from that We had projects that were extremely successful

What did we learn? Projects had more interaction with other projects and the “established system” than was originally anticipated…to reform the system, you needed to re-connect back to the system The institution is starting to change We got more than we bargained for…and more than we hoped for