Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

EMS Checklist (ISO model)
Global Congress Global Leadership Vision for Project Management.
INPO Update CMBG Meeting June 2013
Ensure Vendor/Engineer of Choice Product Quality
Environmental Management System (EMS)
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Vermont Yankee Presentation to VSNAP 7/9/12 VY/Entergy Fukushima Response Bernard Buteau.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Contractor Management and ISO 14001:2004
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Network security policy: best practices
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
EHS Management System Elements
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
ASEAN GMP TRAINING MODULE PERSONNEL
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NIST Special Publication Revision 1
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Roles and Responsibilities
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Chapter 6 CRISIS MANAGEMENT. Introduction - Crisis: ◦is a situation that specifically involves a pharmaceutical product, medical device or activity with.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Hazards Identification and Risk Assessment
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
ISO Registration Common Areas of Nonconformances.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
State of Georgia Release Management Training
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Evaluating Configuration Management
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
OHSAS Occupational health and safety management system.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Business Continuity Planning 101
Standard Design Process Overview
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
1 Auditing Your Fusion Center Privacy Policy. 22 Recommendations to the program resulting in improvements Updates to privacy documentation Informal discussions.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
SNC Severe Accident Management NEI Workshop 4/5/12 David Gambrell – Director, Severe Accident Management
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.

NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Current Plant Performance
NEI Configuration Control Benchmark – Palo Verde
Standard Design Process (SDP) Change Management Ashley Taylor TVA
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC Cyber Security Regulatory Overview
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
EMS Checklist (ISO model)
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Jim Powers - Director, Fleet Engineering
TRTR Briefing September 2013
Vendor Technical Information
Break Out 1: CM of Digital Equipment
BWROG – Emergency Procedures and Severe Accident Guidelines (EPG/SAG) Revision 4 Highlights Ken Klass (Talen Energy), Lesa Hill (Southern Nuclear) & Phillip.
Presentation transcript:

Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear

Introduction SNC Perspective on CM Challenges presented by the implementation of the NRC and Industry initiatives in response to Fukushima Objective – Ensure clear documentation and future control of commitments – Address both actions taken, and final plant configuration Challenge – Multiple, overlapping initiatives on different timelines – Expedited time frame resulting in parallel efforts. – “Beyond Design Basis Event”

Scope of Impact 12 NRC Recommendations with 32 items and 9 additional concerns prioritized into 3 Tiers. – 50.54(f) Letters – Required evaluations, voluntary commitments with uncertain future outcome of regulation. – Orders – Required actions, fixed implementation schedule, lagging endorsement, with uncertain final codification. – Rulemaking – Measured, public consensus approach with future required actions. – Subsequent evaluation, response, inspection, drills and audits INPO IERs, PO&Cs, Emergency Response interfaces, Regional Response Centers, etc. “Beyond Design Basis” – ultimate gray area challenge of scope, requirements, and configuration management.

Net Effect on Plants Operational strategy changes to mitigate extreme events Physical modification to plant and additional connections Portable operational and responder equipment, and storage building(s) Interface with Regional Response and INPO emergency centers Changes in staffing and/or emergency responder roles Significant changes in procedures, training, and drills Maintenance and testing of equipment

Configuration Management Impacts Licensing – Technical Specifications – Not currently expected to effect TSs – FSAR – No NRC direction yet. Expect plant specific updates for impact to existing information. Expecting industry standard approach for new section regarding Mitigation Strategies for Beyond Design Basis Events (either at Order implementation or result of rulemaking). – Plans (e.g. Emergency, Security) – Potential changes – Programs (e.g. Fire Protection) – Potential changes

Configuration Management Impacts Programmatic – NEI 12-06, Section 11 defines the scope of programmatic controls necessary to implement and maintain compliance with Order EA – NEI 12-06, Section 11.8 specifically defines the configuration control requirements.

Configuration Management Impacts Traditional Configuration Management – Implementation Stay in process – maximize use of existing processes such as design change, maintenance, testing, training, QA records, corrective action, etc. Procedure Use and Adherence - Revise or create new supplemental procedures to execute and document required actions such as: Seismic/Flooding walk downs, operability reviews of beyond design basis impacts, special reviews of licensing packages, special financial controls, project plans, configuration control expectations for project personnel, etc. Ensure adequate documentation trail for NRC inspection/audit

Configuration Management Impacts Traditional Configuration Management – Programmatic Controls Compliance – Per NEI 12-06, plants will be required to develop an overall “program document” that establishes and maintains these controls, including guidance for NRC review of changes. Existing “Control” Programs – Update existing programs / controls to sustain CM of new requirements such as: Design Control, Equipment labeling, ER/PM system classification, Risk Management, etc.

Configuration Management Impacts Traditional Configuration Management – Implementing Processes and Documentation Execution procedures and processes – Operating procedures, equipment procedures, emergency response procedures, maintenance, testing, calibration, deployment of equipment, etc. Supporting procedures and processes – (in response to a significant event) – work control, access/egress, HP control, fire protection, security, documentation access, etc. Training and Qualifications – SAT process, critical operation actions, assignment of roles, training material, drill scenarios, qualifications, etc. Interfaces – Regional Response Centers, INPO, External agencies, Memorandum of Understanding, Permitting, contracts, alliances, etc.

SNC Procedure Approach Project Execution Procedures Provides direction to perform Project specific duties (Life of Project) Walk downs Licensing Reviews Project Charters Project Files Oversight Plan Etc. Programmatic Controls Establishes plant programmatic controls ((Life of Plant) FLEX Program Document Equipment Labeling PM / ER Classification Design Control Etc. Execution Procedures Performs specific action (Life of Plant) Operating Procedures EP/ERO Procedures Testing and Calibration Etc.

Industry Fleet Approach Leverage the power of your peers – Be Aware – Be Involved – Be Aligned

Industry Activities affecting CM FLEX Program Document template Owners’ Group EOP and SAMG procedure development EPRI PM Maintenance Templates INPO ER Program Revision PIM Regional Response Centers INPO Emergency Response Training Development Working Group INPO Emergency Planning Training / Drill Working Group INPO Engineering VP Working Group (Handling of Beyond Design Basis Information) Weekly industry adhoc phone calls

Q&A More Q&A in afternoon Breakout Session