Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Linac 4 LL RF Hardware Architecture and Design Status
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Ron Akre, Dayle Kotturi LCLS LLRF September 19, 2006.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.
The recent history and current state of the linac control system Tom Himel Dec 1,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
LLRF development of SSRF RF Group and Linac Group
ESS LLRF and Beam Interaction
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ILC LLRF Status Ruben Carcagno, Brian Chase
New xTCA Developments at SLAC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
LLRF and Beam-based Longitudinal Feedback Readiness
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
LLRF Control System Outline Scope Requirements Design Considerations
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements Personnel Engineering requirements Interfaces Alternatives Test plan Preliminary Design Review Block diagram Quality control and reliability Safety hazards

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Requirements At 120 Hz, meet phase/amp noise levels defined as: 0.1% rms amplitude 100 fs rms in S-band (fill time = 850 ns) 125 fs rms in X-band (fill time = 100 ns) All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are  Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac (L2 has 28; L3 has 48)

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Personnel Customers = Patrick Krejcik + Paul Emma need LLRF control system thru L1S by Dec 06 Hardware = Ron Akre, Jeff Olsen, Michael Cecere Software = Dayle Kotturi, Arturo Alarcon

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Engineering Requirements When beam is present, control will be done by beam-based longitudinal feedback (except for T- cavs); when beam is absent, control will be done by local phase and amplitude controller (PAC) Adhere to LCLS Controls Group standards: RTEMS, EPICS, Channel Access protocol Ref: Why RTEMS? Study of open source real-time OSStudy of open source real-time OS Begin RF processing of high-powered structures May 20, 2006

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Interfaces LLRF to LCLS global control system PVs available for edm screens, archiving, etc over controls network LLRF VME to beam-based longitudinal feedback from feedback: phase and amplitude corrections at 120 Hz over private ethernet from LLRF: phase and amplitude values (internal) LLRF VME to LLRF microcontrollers from VME: triggers, corrected phase and amplitude from microcontrollers: phase and amplitude averaged values at 120 Hz, raw phase and amplitude values for debug

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Alternatives Through end of January 2005, various solutions were evaluated, from 100% COTS modules to hybrids of in-house designed boards. By May 2005, the options were narrowed down to two: an Off-the-shelf solution and an in-house solution. By August 2005, the in-house solution was selected

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test Plan Will be described for the 5 categories of hardware Low level RF chassis (in-house) Monitor chassis (in-house with COTS timing) Fast control chassis (in-house with COTS timing) Slow control chassis (in-house) Feedback control chassis (COTS products)

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test Plan for Low level RF chassis (in-house) What for? Low level RF distribution where EPICS is not required Where? LINAC Sector 0, the RF hut and klystron stations Status now: 119, 476, 2856, MHz – 16 way distributions complete. 476 MHz master amplifier complete Steps to complete: by Nov2005: PEP-II master phase shifter install and test by Dec2005: IQPAU installation and test by Jan2006: LO chassis installation and test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 RF Distribution

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test plan for monitor chassis – “PAD” (in-house with COTS timing) What for? Local RF phase/amplitude detection/monitoring Where? Laser, gun, L0-A, L0-B, L1-S Status now: Evaluating ADCs Steps to complete: by Dec2005: evaluation of ADCs (1chan) by Mar2006: board prototype (2 or 4 chan, thermo) by May2006: final board. Test (incl temp. cycling) by Sep2006: chassis (15 dual channel) avail. Test. by Oct2006: injector installation and test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 PAD – the monitor board I RF LO Q I&Q MODULATORS X 16 bit ADC (LTC2208) 119MHz Clock I RF LO Q Chan. 2 I Chan. 1 Q Chan. 1 I Chan. 2 Q FIFO 4 X 1k words WCLK 16bit DATA WCLK 16bit DATA WCLK RF CHAN 1 INPUT RF CHAN 2 INPUT Line Drivers MONITORS EXTERNAL TRIGGER 120Hz EXTERNAL CLOCK 119MHz CS/ CLK 16 bit DATA CONTROL / Arcturus uC5282 Microcontroller Module with 10/100 Ethernet ET HERNET LO INPUT CPLD

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test plan for fast control chassis (in-house with COTS timing) What for? Local RF phase/amplitude control Where? Laser, gun, L0-A, L0-B, L1-S Status now: board design Steps to complete: by Jan2006: board prototype by Mar2006: final board by Sep2006: chassis (6 single channel) by end of 2006 downtime: injector install/test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 PAC – the control board

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test plan for slow control chassis (in-house) What for? Phase and amplitude control of the reference Where? Sector 20 RF hut Status now: not started Steps to complete: between now and Feb 2006: determine if fast control module does the job. If yes, this is done. Otherwise: by Feb2006: start design by Mar2006: board prototype by May2006: final board by Sep2006: chassis (6 single channel) by Nov2006: injector installation and test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 RF crate What for? Local feedback control and timing for RF systems Where? Sector 20 RF hut Status now: testing EVR Steps to complete: evaluate number of signals and processor load to determine number of crates design and write software test with simulation and later hardware during 2006 downtime: installation and test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Feedback control crate (COTS products) What for? beam-based longitudinal feedback Where? At sector 20, in RF hut Status now: software design Steps to complete: purchase network switch module if IOC has insufficient ports by Dec2006: software by Dec2006: installation and test

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Block Diagram 1: Laser - Tcav

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Block Diagram 2: L2-L3

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Block Diagram 3: Total Modules

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Block Diagram 4: for December 2006

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Quality control and reliability Buy components from reliable vendors Test each component and circuit board Components will be tested in an incubator cycled from room temperature through 45 degC

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Safety hazards RF 1kW at 120Hz at 5uS = 0.6 Watts average, 2 Watt average amps at 2856MHz, 60W average amps at 476MHz Hazards – RF Burns Mitigation – Avoid contact with center conductor of energized connectors 110V AC Connector Require “Electrical Safety 251” completion for plugging/unplugging Hazards - Shock Mitigation - Don’t touch conductors when plugging into outlet. The LLRF system is less hazardous than a cell phone and equally hazardous as plugging in a 110V AC cord at home

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Supplementary Slides… …on next page to end

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, MHz master amplifier PEP-II master phase shifter

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, to 2856MHz Divide by 16 Chassis LLRF Phase Reference System

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, to 476MHz Divide by 16 Chassis LLRF Phase Reference System