Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Maintenance and Accelerator Support RHIC Start Up 12.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
L1Calo Operations Summary
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%) s Accounting issue on Thursday, August 21st  Sources of downtime u Silicon HDIs trips u Calorimeter power supplies trips u Calorimeter Level 1 trigger noise  Total number of events collected u 11 mln  Beam halo and beam position u Within specifications Day of the Week

Dmitri Denisov Detectors Status  Calorimeter power supplies u Two failed this week – more then typical u Both been replaced during accesses Friday and Saturday u One more power supply is “acting up” s Able to keep running with small downtime for trips resets s Hope to survive till Thursday access  Calorimeter Level 1 trigger noise u Electronics related u Less or about one tower per week get noisy u Diagnostic is not well developed s IN some cases shifters are having troubles understanding which tower should be masked  Silicon u No major problems u Working on procedure of turning problematic HDIs OFF and ON u Data for depletion voltage curves have been accumulated  Fiber tracker u Running smoothly u Required one access last week to replace failed AFE board  Muon system u Running smoothly u Lost mini-drift tubes crate controller last week which was replaced on access  Requested 4 about one hour accesses last week u More then typical u Do not see any tendency – most probably statistical fluctuation u Running well for the last 48 hours

Dmitri Denisov Planning Coming Shutdown  Shutdown goals u Improve reliability of the detector u Improve quality of the data we are collecting u Be ready for physics data taking from the first store in November  Detailed plan has been developed by each group u All our recent Operations meetings are devoted to the shutdown planning u Keeping master shutdown schedule on the Web s Major detector opening/closing items  Plan to finish all critical jobs in 7 weeks u Use last 3 weeks for commissioning  Beginning of shutdown is filled with moving large detector pieces u Will need relatively minor, but timely help from survey crew  Serious about safety u Both personnel and equipment SAFETY FIRST!

Dmitri Denisov Summary  Progressing smoothly with physics data taking u Weekly efficiency is 87+-3% for the last 2 months s 87 looks like a magic number!  Had more, then typical failures last week u Especially in calorimeter u Required more accesses  Plan for September shutdown is well developed u See no problem of finishing all critical planned jobs in 7 weeks u Will need minor, but timely support from survey group