Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.

Slides:



Advertisements
Similar presentations
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Advertisements

Implementation of the Record of Decision for Low-Level and Mixed Low-Level Waste Presentation to the National Governors’ Association Federal Facility Task.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
Definition of Solid Waste (DSW) Update John Crawford, Chief Industrial Waste Compliance Section Office of Land Quality.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
 In anticipation of the end of the Period of Performance for FEMA’s FY 2011 and FY 2012 Preparedness Grant Programs this year, GPD reminds Grantees to.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
U.S. DOE Preparation for Shipping of Transuranic Radioactive Waste Cross Country – The Waste Isolation Pilot Plant (WIPP) O.W. “Lynn” Eaton, Manager External.
ACADs (08-006) Covered Keywords Transuranic, radioactive waste, radwaste, waste regulations. Description Supporting Material
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
Hanford Site: Long-term Stewardship Boyd Hathaway Realty Officer Department of Energy – Richland Operations Office Hanford Long-Term Stewardship (LTS)
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
1 Hanford Transportation and Packing Overview Presented by: Jim Portsmouth and Marshall Myrick July 2015 CHPRC
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review April 28, 2014.
Update on DOE’s National Waste Disposition Plans Frank Marcinowski Deputy Assistant Secretary for Logistics and Waste Disposition Enhancements Office of.
Overview of a Developing Data System and Future Data Call Needs Douglas Tonkay Office of Commercial Disposition Options June 22, 2005.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
May Hazard Classification of the Remote Handled Low-Level Waste Disposal Facility Boyd D. Christensen Battelle Energy Alliance, Idaho National Laboratory.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
1 Avoiding Gridlock: Obstacles to Waste Disposition Intergovernmental Group Meeting with DOE Hilton Crystal City – Arlington, VA December 9, 2004 Prepared.
1 Idaho Cleanup Project Extension Work Transportation Accomplishments M. Shawn Tigue July 2015.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
EM-1 Office of Environmental Management Building the FY 2003 Budget u Transition budget to begin implementing the top-to-bottom review u Budget consists.
An Update on the EM Waste Disposition Christine Gelles Office of Disposal Operations Office of Regulatory Compliance Office of Environmental Management.
U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
LLW/MLLW National Disposition Strategy Gary R. Peterson, P.E. U.S. Dept. of Energy.
Environmental Management Review of Corporate Projects.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Environmental Management May 23, Federal Facility Task Force Meeting Update.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Office of Environmental Management U.S. Department of Energy Environmental Management.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
Welco EPA TRIBAL PROGRAMS Cathy Villa, EPA Tribal Coordinator EPA’s Tribal Programs leads the effort to protect human health and the environment of federally.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
DOE’s “New” National Strategy for Waste Management Christine Gelles Director, Commercial Disposition Options, EM-12 Office of Environmental Management.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Update to National Governors’ Association Patty Bubar Associate Deputy Assistant Secretary Office of Integration and Disposition May 16, 2002.
1 Energy Communities Alliance Meeting WIPP Recovery and Greater-than-Class C Disposal Update February 17, 2016.
Option 2a Template Example Phillip Grissom – Southern Nuclear Based on Farley (more or less)
August 28, Waste Inventory Records Keeping Systems United States of America Douglas Tonkay U.S. Department of Energy Washington, DC Office of Commercial.
New Mexico’s Nonpoint Source Management Program and Plan Revision.
Savannah River Downblending Program for Surplus, Non-Pit Plutonium Unclassified Kenneth S. Fuller K-Area Complex Operations Support Manager 2016 INMM Annual.
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Low Level Radioactive Waste Forum, Fall 2014 Meeting
Introduction to the Definition of Solid Waste Final Rule
Shipping to WIPP Travis R. Myers 5/24/17 GV ppt.
The Path Forward for WIPP: A State and Local Perspective
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Overview of Waste Disposition Activities Fall 2017 LLW Forum Meeting
Waste Disposition 2006 Intergovernmental Meeting with DOE
Georgia Update Jeff Cown Land Protection Branch
Status of Disposal Capabilities for Greater-Than-Class C (GTCC) Low-Level Radioactive Waste Theresa J. Kliczewski GTCC EIS Document Manager Office of.
Adding Nuclear Power to the Grid
Brackish Water Desalination Project
RESOLUTION OF GENERIC SAFETY ISSUE 191
Office of Waste Disposal Office of Environmental Management
U.S. Department of Energy Perspectives on Waste Classification
Presentation transcript:

Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III

2 Discussion Topics Waste Shipment Status Regulatory Strategy Transportation/Packaging Strategy

3 Waste Shipment Status Since March 1999, over 5,000 m 3 of contact-handled TRU waste shipped and disposed at WIPP. Over 800 truck shipments from 5 sites to date. A single rail car shipment from Mound to Savannah River Site supporting site closure.

4 Waste Shipment Status Shipments Received as of May 13 (~24,000 drums equivalent) HanfordHanford IdahoNational(INEEL)IdahoNational(INEEL) Rocky Flats Environmental Technology Site (RFETS) Rocky Flats Environmental Technology Site (RFETS) Waste Isolation Pilot Plant (WIPP) Waste Isolation Pilot Plant (WIPP) Savannah River Site (SRS)Savannah (SRS) Los Alamos National Laboratory (LANL) Los Alamos National Laboratory (LANL)

5 TRU Waste Shipping Priorities Highest Priority –Rocky Flats closure by the end of FY 2006 –Meeting Idaho Settlement Agreement Second Priority –Waste shipments from Savannah River Site to WIPP to allow remaining Mound waste transfer to SRS Third Priority –As resources are available meet needs of Los Alamos, Hanford, and small quantity sites

6 Small Quantity Site Strategy Using mobile modular vendors under WIPP control (Central Characterization Project) Savannah River Site CCP audit complete, regulatory approval to begin shipments granted; first CCP shipment from SRS received at WIPP on April 6, Proposed Savannah River Site CCP shipments support additional OHOX railcar shipments from Mound to SRS in FY 2002 CCP mobile vendors at ANL-E and NTS preparing for audits, anticipate regulatory approval to begin shipments in late FY 2002 and into 2003 As mobile modular vendors finish at one site, they will be made available to other sites, e.g., LLNL

7 Anticipated* Remaining FY 2002 Shipments * Dependent upon regulatory approvals, budget, packaging and transportation resources, etc. May 02 - Sept 02

8 RCRA Regulatory Strategy: Current Status NMED is processing several permit modification requests required to maintain current operations –Confirmation of waste characterization at WIPP site (expect NMED Notice of Deficiency soon) –Drum age criteria (expect final NMED decision by Fall 2002) DOE considering submitting permit modifications semi-annually to facilitate processing –RH Waste Analysis Plan & RH Facility (submittal expected Summer 2002)

9 More details on the RH-TRU Program NAS independent review of RH-TRU essentially complete Requires a modification to WIPP’s RCRA permit Requires EPA approval because of change to compliance certification - DOE will submit a 40 CFR change notification to EPA at same time it submits the RCRA permit modification First RH-72B RH-TRU transport cask under acceptance review; 11 more in production with delivery complete in FY 2002

10 Transportation/Packaging Status Coordination with State and local agencies on shipments continues 2 carriers under contract with 16 tractors and over 25 drivers 35 trailers and 59 TRUPACT-IIs currently in the fleet Contracts in place for a total of 67 TRUPACT-IIs and 15 HalfPACTs by April 2003 (delivery rate about 2 per month) Specifications being developed for intermodal large box shipping container, TRUPACT-III to supplement TRUPACT-II –5 ft x 5 ft x 8 ft payload would allow 97% of boxed waste to be shippable avoiding large repackaging cost –Design, production, testing, and certification will require several years before first package is available Consideration being given to using rail shipments to supplement truck shipments when economically viable

11 NRC Certification of Packaging Working with NRC on multiple transportation packaging certification requests –LANL High Activity CH-TRU Waste Future TRUPACT-II SARP revisions are being contemplated to make more waste shippable, e.g., use of hydrogen getter and bag breaching technology; TRUPACT-III will require NRC certification

12 Conclusion Good progress on moving waste to WIPP for disposal, focusing on both large and small sites Aggressive goals are in place for future shipments Significant efforts to implement changes to site characterization requirements and transportation packaging to make the system more efficient and less costly Need continued NGA support to make all this happen