Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
1 KFPA Critical Design Review – Fri., Jan. 30, 2009 KFPA Data Pipeline Bob Garwood- NRAO-CV.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, MIB FUNCTIONALITY.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
18-19 July, 2002Correlator Backend System OverviewTom Morgan 1 Correlator Backend System Overview Tom Morgan, NRAO.
EVLA Monitor & Control EVLA Advisory Committee June 10 – 11, 2002.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
EVLA Data Processing PDR E2E Data Archive System John Benson, NRAO July 18, 2002.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
INTRODUCTION CSE 470 : Software Engineering. Goals of Software Engineering To produce software that is absolutely correct. To produce software with minimum.
Jeff Kern NRAO/ALMA.  Scaling and Complexity ◦ SKA is not just a bigger version of existing systems  Higher Expectations  End to End Systems  Archive.
Software Overview Sonja Vrcic
Monitor and Control Software
EVLA Computing Software Overview.
Antenna Monitor & Control Subsystem Engineering Requirements
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Correlator Growth Path
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
Requirements Bryan Butler.
Presentation transcript:

Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15

Gareth HuntEVLA M&C PDR 2002 May 15 Assumptions We will never want to correlate un- upgraded antennas with the new correlator No one, except perhaps the project scientist, sees any value in truly concurrent operations, viz, splitting the IF from the enhanced antennas so that the same signals can be processed in the old and new correlators at the same time

Gareth HuntEVLA M&C PDR 2002 May 15 Summer 2002 (initial engineering support) Basic support for engineering development is needed As mentioned elsewhere, this date is going to be tight due to the availability of the MIB chip and the RTOS for the chip

Gareth HuntEVLA M&C PDR 2002 May 15 Early 2003 (tests with enhanced antenna) The MIB board will be needed in early 2003 for the engineering groups to develop interfaces to the modules Outfitting of the first antenna is scheduled for April 2003 Adequate control will be needed if we are to move the antenna The achievement of this is tight

Gareth HuntEVLA M&C PDR 2002 May 15 Correlator System Controller This is needed as soon as possible The tape (or equivalent) output will probably be written directly from the CSC –(Replacement for 6250 bpi drives) The new CSC is a new device, and has been designed so that both old and new systems will be able to communicate with it easily

Gareth HuntEVLA M&C PDR 2002 May 15 Tape Data Format If the data format is unchanged, the CSC will have to write FP data to the tape in ModComp format for the AIPS and AIPS++ fillers to digest If the format is changed, then time will have to be given to allow the on-line and downstream data tasks to change – any time until 2009

Gareth HuntEVLA M&C PDR 2002 May 15 Late 2003 (observing with two enhanced antennas) When the second enhanced antenna is available at the end of 2003, we will want to have a single baseline correlated To achieve this date is extremely challenging –Should we adopt another telescope’s control system? –Decisions on languages and tools needed in 2002

Gareth HuntEVLA M&C PDR 2002 May 15 Early 2004 (observing with enhanced antennas) With more antennas, a subarray of enhanced antennas will be available The EVLA M&C system will have to have sufficient functionality to support these when needed –EVLA debugging –Or as a science component with the VLA

Gareth HuntEVLA M&C PDR 2002 May 15 True Concurrent Operation New antennas controlled by new M&C At least two possible paths to achieve this Both options require a significant amount of throw-away coding effort –Need to make good estimates

Gareth HuntEVLA M&C PDR 2002 May 15 Concerns We need to be able to retire the (recently upgraded) ModComps as soon as possible Minimize effort on throw-away code Operation with “main” array as reliable as possible –Transition from a majority of un-upgraded antennas to enhanced ones in 2006 (?) Operate with the new system as soon as practical –Maximize debugging availability Easy to use in parallel by the Operators

Gareth HuntEVLA M&C PDR 2002 May Prototype correlator Only a few (4?) antennas will be supported Old correlator still the workhorse Begin passing new correlator data through the backend computer systems to the pipeline and archive

Gareth HuntEVLA M&C PDR 2002 May New correlator shipped to the VLA site for assembly and testing –Installation and final debugging of correlator backend computers begins –Prototype pipeline and archive hardware Shared risk science observations begin Old correlator still the workhorse

Gareth HuntEVLA M&C PDR 2002 May Full deployment Acquisition of “final” pipeline processors and archive systems Old correlator decommissioned