CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept

Slides:



Advertisements
Similar presentations
BANK EROSION PINS.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Weirs and Canal Intakes By: Nell Kolden and Taylor Barnett Thursday April 12, 2012 CIVE 717.
Luxuries We Like To Have The “Luxury of Space” The “Luxury of Time” (nature strengthens the project over time) The “Luxury of Monitoring” The “Luxury of.
Rock Riffle Design Course
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP}
Articulating Concrete Mattress (ACM) Systems
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
DESIGNING BENDWAY WEIRS
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
DIFFERENCES BETWEEN BENDWAY WEIRS & ROCK VANES/BANK BARBS {All are redirective methods}
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
BIG SISTER HERMAN PARK, ANGOLA, NY
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS (Looking across and upstream in this view) Designed jointly by.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
DIFFERENCES BETWEEN BENDWAY WEIRS & ROCK VANES/BANK BARBS {All are redirective methods} By Dave Derrick, Potomologist & VP, River Research & Design, Inc.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
Little Miami River Project at Anderson Township Riverside Park, Hamilton County, Ohio Corps of Engineers Louisville District CAP cost-share project.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SINGLE STONE BENDWAY WEIRS
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream

Functions of Bendway Weirs on the West Fork Beaver River: Main function is realignment of the thalweg through the bend and also center the thalweg within the channel immediately downstream of the bend where a pipeline was exposed by erosion. The pipeline cover was protected with Articulated Concrete Mattress (ACM). Secondary function was to provide some bank stabilization within the bend.

West Fork of Beaver River West Point, OH. Pre-project picture. Looking US at an eroding outer bank. SUB MAR

NOTE: We did not build the two upstream Bendway Weirs SUB MAR NOTE: We did not build the two upstream Bendway Weirs

Close-up of Bendway Weirs SUB MAR Close-up of Bendway Weirs

Looking DS at three Bendway Weirs, constructed Sept 2002 Pix by derrick 9-2002 SUB MAR

Looking DS at the same 3 Bendway Weirs 5 years after construction Looking DS at the same 3 Bendway Weirs 5 years after construction. Fines in BW’s have washed out, but well graded 18 to 24 inch stone is stable & bank is stable. Pix by derrick 9-17-2007 SUB MAR

Looking US at two low elevation Bendway Weirs, two years after construction, 05/11/2004. SUB MAR

Looking US at the same two low elevation Bendway Weirs, five years after construction, 9/17/2007. Note stable flat angle, vegetated bank. SUB MAR

Close-up of the DS low-elevation Bendway Weir, five years after installation. Pix by derrick 9-17-2007 SUB MAR

Great aquatic habitat due to the deep pools created by the Bendway Weirs. These pools were full of high quality fishes, indicating that water quality is excellent. {5 years after project completion} SUB MAR Pix by derrick 9-17-2007

WE ARE DOG TIRED, THIS PROJECT IS DONE !! Cleophus Speed Elvis Derrick “Based on the interagency publication, Stream Corridor Restoration: Principles, Processes, and Practices, this introductory training covers: Stream corridor ecosystems and their components Ecological processes, structure & functions Characterization and analysis of stream corridors Development of a restoration plan Design, implementation, monitoring, and Integrated, iterative, adaptive, flexible approaches”.