Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,

Slides:



Advertisements
Similar presentations
SPS impedance work in progress SPSU meeting August 11 th 2011.
Advertisements

Impedance of SPS travelling wave cavities (200 MHz) A. Grudiev, E. Métral, B. Salvant, E. Shaposhnikova, B. Spataro Acknowledgments: Erk Jensen, Eric Montesinos,
Update on SPS BPM impedance B. Salvant for the 2008 impedance team.
Introduction Status of SC simulations at CERN
1 Impedance and its link to vacuum chamber geometry T.F. Günzel Vacuum systems for synchrotron light sources 12 th september 2005.
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
2012 activities of the ICE impedance working group and plans for
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Agenda: General kickers analysis Wang-Tsutsui method for computing impedances Benchmarks Conclusions Bibliography Acknowledgments: E.Métral, M.Migliorati,
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
Update of the SPS transverse impedance model Benoit for the impedance team.
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Status of PSB Impedance calculations: Inconel undulated chambers C. Zannini, G. Rumolo, B. Salvant Thanks to: E. Benedetto, J. Borburgh.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
11 Update of the SPS impedance model G. Arduini, O. Berrig, F. Caspers, A. Grudiev, E. Métral, G. Rumolo, B. Salvant, E. Shaposhnikova, B. Spataro (INFN),
Impedance of the CLIC-DRs: What we know so far and what else we need to study…. E. Koukovini-Platia M. Barnes, A. Grudiev, N. Mounet, Y. Papaphilippou,
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Instability rise-time far above the TMCI threshold: Comparison between simple theory, MOSES and HEADTAIL E. Benedetto, E. Metral Acknowledgements: G. Rumolo,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
Longitudinal Impedance Characterization of the SPS MBA-QF Unshielded Pumping Ports Simulations, bead-pull and wire measurements Fritz Caspers, Jonas Ghini.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Main activities and news from the Impedance working group.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Reminder on longitudinal modes of the SPS BPMs and ZS pumping ports Benoit Salvant for the impedance team.
Impedance Working Group Update ICE meeting June 12 th 2013.
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Flange Insulation and Grounding in the SPS Jose E. Varela 06 October 2015.
1 Transverse single-bunch instabilities in the CERN SPS and LHC Benoit Salvant for the impedance team: Gianluigi Arduini, Theodoros Argyropoulos, Mike.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
New Contributions to the SPS Longitudinal Impedance Model
SPS Longitudinal Impedance Simulations & Measurements Update Benoit Salvant, Carlo Zannini, Thomas Bohl, Helga Timko, Fritz Caspers, Elena Shaposhnikova.
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Longitudinal impedance of the SPS
Space charge studies at the SPS
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Updated status of the PSB impedance model
Follow up on SPS transverse impedance
Proposals for 2015 impedance-related MD requests for PSB and SPS
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Benchmarking the SPS transverse impedance model: headtail growth rates
LHC at 7 TeV/c: comparison phase 1 / IR3MBC
News on the TMCI and SPS transverse impedance
Impedance working group update
E. Métral, N. Mounet and B. Salvant
Status of the EM simulation of ferrite loaded kickers
E. Metral, G. Rumolo, B. Salvant, C. Zannini (CERN – BE-ABP-LIS)
E. Métral, G. Rumolo, R. Tomás (CERN Switzerland), B
Updated status of the PSB impedance model
LHC impedance: Comparison between phase 1 and IR3MBC – follow-up
SPS-DQW HOM Measurements
Simulating transition crossing in the PS with HeadTail
Observation of Transverse Mode Coupling Instability at the PS and SPS
C. Zannini, G. Rumolo, V.G. Vaccaro
Status of the EM simulations and modeling of ferrite loaded kickers
CERN-SPS horizontal instability
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
Multiphysics simulations of impedance effects in accelerators
Current impedance issues
Presentation transcript:

Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro, Jose E. Varela

Overview Present SPS transverse impedance model Broadband impedance of step transitions Future update of the model SPS Longitudinal impedance model Summary

Present SPS transverse impedance model Elements included in the database: – Realistic model that takes into account the different SPS vacuum chambers weighted by the respective length and beta function. Also the iron in the magnet is taken into account – 19 kickers (CST 3D simulation) – 106 BPHs (CST 3D simulations) – 96 BPVs (CST 3D simulations) – 200 MHz cavities without couplers (CST 3D simulations) – 800 MHz cavities without couplers (CST 3D simulations) – Enamel flanges (CST 3D simulations) KickersBeam pipe BPH BPV TW 200MHz and 800MHz Enamel flanges

Evolution of the extraction kickers in the SPS

SPS vertical impedance model 5

SPS horizontal impedance model 6

Vertical coherent tune shift 100 % 20 % 40 % 60 % 80 % Present SPS impedance model reproduces about 70% of the vertical tune measured in the Q20 Present impedance model reproduces the instability behavior (H. Bartosik, Talk at the SPSU, 12 December 2013) Measurements performed in September 2012

Stability diagram: Q20 o Two regimes of instability in measurements Fast instability threshold with linear dependence on ε l Slow instability for intermediate intensity and low ε l o Excellent qualitative agreement with HEADTAIL simulations Slightly lower threshold in simulation (amplitude detuning or space charge?) LIU SPS-BD, 12. December measurementsHEADTAIL simulations 4.5x eVs nominal Island of slow instability H. Bartosik

Intra-bunch motion: Q20 (I) o Example for slow instability Clear indication for mode 1 in measurement Good agreement with HEADTAIL simulation LIU SPS-BD, 12. December measurementsHEADTAIL simulations H. Bartosik

Intra-bunch motion: Q20 (II) o Example for fast TMC instability Excellent agreement between measurements and simulation Travelling wave pattern clearly visible LIU SPS-BD, 12. December measurementsHEADTAIL simulations H. Bartosik

Horizontal coherent tune shift The kicker impedance model predicts a negative horizontal effective impedance (positive slope of the coherent tune shift) in agreement with the measurements Measurements performed in February 2013

Overview Present SPS transverse impedance model Broadband impedance of step transitions Future update of the model SPS Longitudinal impedance model Summary

Broadband impedance of a step transition Based on the results of 3D EM simulations, the broadband impedance contribution due to an abrupt transition is independent of the relativistic beta. Therefore, based on the aperture model, the generalized broadband impedance of the PSB transitions has been calculated as: C. Zannini, Electromagnetic simulations of CERN accelerator components and experimental applications. PhD thesis, Lausanne, EPFL, CERN-THESIS Transverse Impedance

Broadband impedance of step transitions Weak dependence on L L

Broadband impedance of step transitions Weak dependence on L2 L2

Broadband impedance of step transitions L2 mm The imaginary part of the transverse impedance is weakly dependent on the cavity length below 1 GHz For all the SPS cavity like structures the first resonating mode is well above 1 GHz (r<80 mm)

Broadband impedance of step transitions L2

Courtesy of Jose E. Varela Broadband impedance of step transitions Flange Type EnamelBellow N um. of elements Resistor BPV-QDYes 90No BPH-QFYes 39Long QF-MBAYes 83Short MBA-MBAYes 14Short QF-QFNoYes26Short QD-QDYesNo99No QF-QFNo 20No BPH-QFYes 39Long QD-QDNo 75No QD-QDYesNo99No

Vertical coherent tune shift 100 % 20 % 40 % 60 % 80 % Step transitions seem to explain almost the totality of the missed tune shift

SPS Pumping port SPS Pumping port shielding Pumping ports 2000 Impedance reduction campaign: shielding of the pumping ports, lepton cavities etc.)

Estimation of the broadband impedance of unshielded transitions between bending magnets and straight sections 744 step transitions: – 377 MBA-Straight A – 377 MBB-Straight B Imag [ Z y (f=0) ]= 11.8 MΩ/m Measured13.1 Expected (only from transitions in the magnets) 11.8

Overview Present SPS transverse impedance model Broadband impedance of step transitions Future update of the model SPS Longitudinal impedance model Summary

New elements to be added in the model Simulations are ongoing or must be finalized – Septa – Wire scanner – Non standard elements (special transitions, valves) Update due to future installations – New wire scanner – New kicker for high bandwidth feedback system – New MSI-V septum

Overview Present SPS transverse impedance model Broadband impedance of step transitions Future update of the model SPS Longitudinal impedance model Summary

Status of the SPS longitudinal impedance model Elements included in the database: – Realistic model that takes into account the different SPS vacuum chambers weighted by the respective length and beta function. Also the iron in the magnet is taken into account – 19 kickers (CST 3D simulation) Kickers Wall impedance

Longitudinal wall impedance Calculation performed with ImpedanceWake2D

Longitudinal impedance

SPS impedance in total LIU-SPS BD Meeting, 24th October f r (GHz)R sh (MOhm)QR/Q (kOhm) BPMs Zs (?) 200 MHz HOM Flanges + cavity & kicker impedance Courtesy H. Timko

Overview Present SPS transverse impedance model Broadband impedance of step transitions Future update of the model SPS Longitudinal impedance model Summary

Summary and next steps The SPS impedance model (kicker, wall, cavities, BPMs) explains about 70% of the measured vertical coherent tune shift Transition pieces seem to be able to explain the remaining 30% More realistic model of transition pieces Update of the model including septa and wire scanner Continuously update of the model according to new installations and modifications

Thank you for your attention

F. Caspers, T. Kroyer, M. Barnes, E. Gaxiola et al. 32 Serigraphy Seven out of eight SPS extraction kickers have been serigraphed Realistic models: SPS extraction kicker (MKE-L)

Realistic models: MKE kicker with serigraphy

f=44 MHz Comparing MKE with and without serigraphy

The peak observed in the MKE with serigraphy is a quarter-wavelength resonance on the finger length Comparing MKE with and without serigraphy

The trend of the vertical effective impedance along the last 10 years is in good agreement with the expected changing of the kicker impedance model Kickers play a major role in the SPS total impedance Evolution of the extraction kickers in the SPS: vertical tune shift

The trend of the horizontal effective impedance along the last 10 years is in good agreement with the expected changing of the kicker impedance model Kickers play a major role in the SPS total impedance Evolution of the extraction kickers in the SPS: horizontal tune shift