Inkjet Recycling Cost Analysis Important Cost Factors to Consider OR LEARNING TO CONTROL THE SEEMINGLY UNCONTROLABLE! W2/ Rm. Venetian D 1:00-2:30 PM Benjamin.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

Presented by: Diana Tai Ivan Chen Ronnie Lee Wilson Wong Chapter 11 DQ 35 CAAT.
1 Joint Parking Task Force Update Office of Campus Sustainability The WSU - OfficeMax ® Ink & Toner Recycling Program.
Definition of the KPI Return rate. Purpose This document defines the KPI return rate for suppliers of direct material. The purpose is to measure our supplier.
FDA Economically Motivated Adulteration Conference 119.
Global Supplier Quality Manual PPAP Requirements
Types of Data This module was developed by Business Process Improvement. For more modules, please contact us at or visit our website
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
Copyright © Cengage Learning. All rights reserved. 8 Tests of Hypotheses Based on a Single Sample
Chapter 10 Quality Control McGraw-Hill/Irwin
Quality control of raw materials In-process control
Chapter 11 Quality Control.
Skip Intro Tab then Enter. To start the process, The Warehouse will invite you to use The Supplier Electronic Portal and will send you the link to a website.
RESEARCH, EVALUATION AND ACCOUNTABILITY Preparing Your School’s ALTERNATE ASSESSMENT For Return Student Achievement - Our Number One Priority.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
Inspection Issues in the Analytical Laboratory: An FDA Perspective Yvonne McKnight Chemist US Food and Drug AdministrationPhone: x
Statistical Process Control Chapters A B C D E F G H.
DISPLAY FIREWORKS SEMINAR PARIS LAS VEGAS HOTEL February 21,
6-1. Key Sanitation Condition No. 6: Proper labeling, storage and use of Potential toxic compounds.
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.
Partnership Plus™ Program AFC Distributor Strategy 2004 Return to AFCOnline.com.
Paper Cutting Exercise
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
Important informations
Warehouse Procedure. Receiving Cargo EASTRONGWarehouse Notice SuppliersSend cargo to warehouse.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
Leukocyte-Reduced Blood Components Lore Fields MT(ASCP)SBB Consumer Safety Officer, DBA, OBRR, CBER September 16, 2009.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
VCA - Impact Resistance Testing Progam “10 easy steps to implement a low cost system”
WHO - PSM Materials Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava M.Sci.Pharm Quality.
Logistics Management 1.As a Logistics service provided, we have established proven and tested procedures on how we handle 3 rd party equipment and materials.
Preparing Your School’s FCAT WRITING Folders For Return.
Basic Principles of GMP
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
C HAPTER 4  Hypothesis Testing -Test for one and two means -Test for one and two proportions.
Issue documents by local purchasing dept. security check Document control & issuing slip Unpacking, counting and put in suitable palletes Local Purchasing.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
OUR TECHNOLOGY Copyright All Rights Reserved.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
AutoSimply Process Flow. Legend System Process Manual Process System Document Manual Document Flow Connector to another slide Terminator Predefined Process.
Quality Control significance in pharmaceutical industry
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
United States Department of Agriculture Food Safety and Inspection Service Draft Labeling Policy Guidance for N- 60 Testing Claims for Boneless Beef Manufacturing.
PRE-PACKAGED PRODUCTS SAMPLING Ben Aitken Trading Standards Officer Trading Standards MBIE New Zealand Kevin Gudmundsson Legal Metrology Advisor Trading.
Production Part Approval Process
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
TABLE OF CONTENT INTRODUCTION OVERHAUL PROCESS DOCUMENT REQUIRED
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
SYSPRO Business Model Flows
Statistical Techniques
How to Implement an IG Manufacturing Quality Procedure System
Define, measure, and improve with ISO
Quality Standards Manual
YAMATO TRANSPORT (S) PTE LTD Parcel Handling Procedure
Quality Improvement Plan (QIP) Training Session
HP Officejet Pro 8710 Printer setup for Mac. HP Printer Support Call Our Toll Free The HP Officejet Pro 8710 setup process is made quick.
Tuesday, October 11, 2016 Warm-up
Lesson 1- Operations Management
SKYPORT BAGS MANUFACTORY .LTD
12 Inventory Management PowerPoint presentation to accompany
Chapter 11 Production.
An Overview of Inspection Service
1.5 RAW MATERIAL STORAGE, QUARANTINE AND RELEASING, SOP
Production Part Approval Process
Chap12 Inventory Management Heizer and Render
Strategic Processes Core Processes Support Processes
Presentation transcript:

Inkjet Recycling Cost Analysis Important Cost Factors to Consider OR LEARNING TO CONTROL THE SEEMINGLY UNCONTROLABLE! W2/ Rm. Venetian D 1:00-2:30 PM Benjamin A Lyles Legacy Manufacturing, LLC

Program Outline Quality Report Visual Inspection Circuit Test Performance Sample Cost Analysis

QUALITY REPORT All documents within a company must have a practical function. - Supplier - Invoice and packing list information - QC tests and tests results - Distribution - Archiving

VISUAL INSPECTION Correct part number - Is it a 23D and not a 41A Correct count (packing list) - Received only 95, not 100 Physical damage - Cracks, missing nozzle plates, etc. Packaging procedures - Proper protection for circuits, etc.

CIRCUIT TEST General Averages HP45/15: 1-2% HP26: 2-3% HP29/20/78/56/57: 6-8% HP49/23: 8-15% Lexmark 70/80/16/26: 8-12%

PERFORMANCE SAMPLE How do you REALLY know a component conforms to incoming specifications? - Randomly pick from different boxes or randomly from the same box - Sample size is dependent on number size of lot, but be practical - Have an established criteria for approval or rejection; >75% PASS

COST ANALYSIS (Core/cost factor) + (Material/cost factor)+ (Labor/cost factor) + Overhead + Miscellaneous= Cost of Sellable Cartridge

CORE Example: 500 ea. $5/ea. - Circuit Failure: 7 ea. (1.4%) - Damaged: 5 ea. (1%) - Non-virgin: 2 ea. (<1%) - Failed print test: 45 (9%) Core Cost Factor: 1 – (59/500) = 0.882

MATERIAL Example: 500 – 14 = 486 cartridges to recycle Ink Cost Factor: 1 – (45/486) = Seal Cost Factor: 1 – (45/486) = Label Cost Factor: 1

LABOR Example: Inspection Labor: 500 x $0.10 = $50 Process Labor Cost Factor: 1 – (45/486) = Packaging Labor Cost Factor: 1

OVERHEAD & MISC. Example: Overhead per sellable cartridge: $1.25 Miscellaneous: Shipping costs of cores: $100/500=$0.20

TOTALS Example: Core: $5.00 / = $5.67 Ink: $0.74 / = $0.82 ($7/#; 48 grams/cart.) Seal: $0.05 / = $0.06 Other materials (tape, clip, label, box, etc.): $0.75 Labor: $ $1.50 / $0.15 = $1.90 Overhead: $1.25 Miscellaneous: $100/500 = $0.20 Total: $5.67+$0.82+$0.06+$0.75+$1.90+$1.25+$0.20 $10.65 cost per cartridge

COST REDUCTIONS In-house collection: $2 ea. Core: ($5.00/ $2.00/0.95)/2= $3.89 Ink: $0.74 / 0.93 = $0.80 ($7/#; 48 grams/cart.) Seal: $0.05 / 0.93 = $0.05 Other materials (tape, clip, label, box, etc.): $0.75 Labor: $ $1.50 / $0.15 = $1.86 Overhead: $1.25 Miscellaneous: $50/500 = $0.10 Total: $3.89+$0.80+$0.05+$0.75+$1.86+$1.25+$0.10 $8.70 cost per cartridge

CONCLUSION - START WITH A PLAN - CREATE A SYSTEM FOR DOCUMENTATION - CONTROL, CONTROL, CONTROL - ANALYZE, ANALYZE, ANALYZE, - FIND YOUR FINAL COST - REDUCE COSTS AS YOU GO - DECIDE IF PSYCHIATRIC HELP IS NEEDED

Benjamin Lyles VP Engineering Legacy Manufacturing th St. Ste Denver, CO