What is a Grading & Drainage Plan?

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Who we are Blue Clarity are a team of experienced and diverse construction professionals whose expertise offers a bespoke CAD, survey and design package.
What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Legal Descriptions and Site Plan Requirements
4/7/2015 Workshop: Development Sustainability & Stormwater Planning/Design Stormwater Infrastructure Financing: Getting Decision Makers on Board Mike Hall,
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Wetland Critical Areas - Draft Ordinance Overview 18.20: Definitions Many new definitions added for clarity when used in the regulations and several unnecessary.
Large scale contour mapping of Bakken production sites
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Chapter 13 Site Plan Layout.
Chapter 8 Plot Plans.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Candidate Briefing and Update. 45 minutes. Not a lot of time for most, for me IMPOSSIBLE ! ◦ Personal background ◦ Vision ◦ Development of a comprehensive.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Engineering and Technical Plans Description, process and standards Dh 2005.
Civil Engineer Jonathan Jones Jake from State Farm Bryan Ventura.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Proposed DRAFT New City Ordinance for Water Use in Landscaped Areas Public Meeting September 15, 2009.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Chapter 12 Legal Descriptions and Site Plan Requirements.
Post Construction Stakeholder Involvement Charles Brown Town of Cary.
La Center, Washington: Balancing Pipelines and Populations 1.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
Shady Acres Dallas Township Zoning. The Concept The following project will be displayed as a proposed development in the Dallas Township. It will be composed.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Objectives At the end of this unit, you should be able to:
Storm Water Runoff Storm Water Runoff
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
Permit Process & Application Guide
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Durham County Soil & Water Conservation District January 28, 2016 Michael Dupree.
Monterey County Grading and Erosion Control Requirements and Enforcement Methods 1.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
OPEN SPACE/ CONSERVATION
Welcome to the Libertyville Stormwater Master Plan Open House
Supervisor, RIDEM RIPDES Permitting Program
Erosion Hazard Near Sensitive Waterbodies
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Kittridge Housing 100 Acre Sub-Division West San Fernando Valley
Construction Drawings
Land Use and Zoning Committee Special Workshop
Commercial Construction Projects
RPPP Policy and Procedures Update
Chapter 15 Site Plan Layout.
SE 12th Street Roadway Improvements February 8, 2005.
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Competency: Create site plan drawings
Love Field Modernization Program
Chapter 6 Site Construction.
Design Charrette and Detailing
Competency: Create site plan drawings
Presentation transcript:

What is a Grading & Drainage Plan? The purpose of a "GRADING & DRAINAGE PLAN" is to direct the movement of the soil and water; thus protecting infrastructure from flooding while accommodating ADA requirements.

The “Hydro-illogical” Cycle FLOOD PANIC PLAN PROCRASTINATION

Why Grading and Drainage Engineering? Natural flooding is documented for City of Rio Rancho……Floods of 2006 most recent Protect human life, housing, utilities, infrastructure and large-scale economic development Recommended drainage infrastructure designed to convey up to and including 100 year storm – 2.90 inches in 24 hours

Why do we need them? Required by City of Rio Rancho Ordinances and Policies Required by SSCAFCA Regulations and Policies City of Rio Rancho DPM - Chapter II.2 Drainage, Flood Control and Erosion Control Grading and Drainage Plan Checklist – 2.2-248 of CORR DPM

City of Rio Rancho Design Process Manual I. GENERAL INFORMATION: 1. Professional Engineer's stamp with signature and date. 2. Drafting Standards: (Reference City of Rio Rancho Standards) A. North Arrow B. Scales - recommended engineer scales: (1) 1" = 20' for sites less than 5 acres (2) 1" = 50' for sites 5 acres or more C. Legend - see City of Rio Rancho D.P.M. Manual, Volume 2, for recommended standard symbols D. Plan drawings size: 24" x 36" E. Notes defining property line, asphalt paving, sidewalks, planting areas, ponding areas, project limits, and all other areas whose definition would increase clarity 3. Vicinity Map 4. Benchmark - location, description and elevation A. Control survey vertical datum B. Permanently marked temporary benchmark located on or very near site 5. Flood Insurance Rate Map (FIRM) 6. Legal Description

Why do we need them? City of Rio Rancho DPM - Chapter II.2 Drainage, Flood Control and Erosion Control Grading and Drainage Plan Checklist – 2.2-248 of CORR DPM

Example Grading & Drainage Plans Large Commercial Grading and Drainage Plan >5 Acres May Require Separate Drainage Report

Example Grading & Drainage Plans Small Commercial Grading and Drainage Plan >5 Acres

Example Grading & Drainage Plans Single Family Residence (SFR) Grading and Drainage Plan

Erosion Control Erosion Control is a must. A Plan will prevent

Erosion Control Large Commercial Erosion Control.

What do they Cost? Cost for a Grading & Drainage (G&D) Plan vary and is based on project size, complexity, and location. Typical Single Family Residential (SFR) G&D may range from $1,500 to $3,500 Typical Commercial Development < 5 Acres may range from $5,000 to $12,000 Typical Commercial Development >5 Acres may range from $8,000 to $25,000

Questions ? Thank you, if you have any future questions or assistance you may contact us. Steve Salazar, PE: 505-898-8021 Mario Juarez-Infante, PE: 505-348-4070