Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye
N Design a stormwater drainage system for the city of Bluffdale Assess current infrastructure Assess current drainage needs for a 100 year 24 hour storm Design of new infrastructure using EPA SWMM Prepare a cost estimate
Map of Existing Inlets and Pipe Locations
3 Drains in Neighborhood 1 drain has no pipe exit 2 drains empty into trench 9 Drains on Northern Street Pipes over to Bangeter Highway system
STEPS Create drainage basins for each inlet Find the depth of the 100 year 24 hour storm Calculate flow lines and accumulations Calculate curve number using soil type and land use data Export information into HEC- HMS Map of Drainage Basins
HEC-HMS Model HEC-HMS Output
Node Average Depth (ft) Maximum Depth (ft) Outfall0.66 Link Max Flow (CFS) Max Depth (ft) Flow Volume vs. Time in Fullest Pipe Depth of Water in Pipe vs. Time Depth of Water and Inlets Depth and Flow in Pipes
b 6b 5a 2b 2a 1a 4a 3 4b 5b 6a Final Design Existing Proposed……………. Pipe Labels…………… Inlet Label……………
Pipe IDSurface UpstreamSurface DownstreamInvert UpstreamInvert DownstreamLengthGradePipe Diameter % % % % % %1.5 Total Length Inlet IDSurface Elevation Invert ElevationDepth of Pipe 1a b a b a b a b a b Cross PipesUpstream InvertDownstream InvertGrade % % % % % Pipe elevation and length information Inlet elevation and box depths Cross Pipe depths
ITEMQUANTITYUNIT UNIT COST ITEM COST Mobilization1LS $ 8, Furnish and Install 18-inch RCP Pipe1635LF $ $ 85, Furnish and Install 15-inch RCP Pipe152LF $ $ 6, Manhole6EA $ 2, $ 15, Inlet8EA $ 2, $ 17, Roadway Patching596SY $ $ 11, Remove Surface Materials (asphalt)1787LF $ 9.00 $ 16, Construction Cost: $ 159, Construction Contengencies (20%): $ 31, Engineering Design and Construction Management (15%): $ 23, Total Cost: $ 215, Total Cost (Rounded): $ 216,000.00