3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.

Slides:



Advertisements
Similar presentations
1 Electronics Simulation in the Photon Transport Monte Carlo Preamp model Receiver/discriminator circuit CAFÉ driver circuit model Examples Summary January.
Advertisements

Bunch-by-Bunch Instrumentation Module Design Goals: –Unified conceptual design for all bunch-by-bunch instrumentation Beam position monitoring Bunch tune.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
MIPM and MFW Update 8/6/2008. IPM P-Bar Transfer Spec.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Electrical Engineering 1 WISE Investments Electrical Engineering Lab Digital Logic Laboratory Dr. Keith Holbert.
Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED LANSCE Beam Diagnostics R&D Presented by James Sedillo.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
9 Oct, 2001 “High speed” FEB-ROD Testing at BNL Kin Yip Short report for our FEB-ROD system at BNL taking data at ~ 100 kHz: Data Integrity Noise Continuity.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004.
Recycler Flying Wires Martin Hu Recycler Department.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
CM focuses on controlling outcomes. CM controls change, making sure that its impact is assessed and that every effort is made to prevent erosion of functionality.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
MFW and IPM Update Jim Zagel 5/14/ Vertical Broken Fork After mounting new filament we attempted to align it to parallel the central shaft and.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Calibration and monitoring system for FPD to check the response of the MAPMT and L0PMT as it involves in time ( + to see if we have any dead channels +
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
Status of n-XYTER read-out chain at GSI
Fill-pattern Control System for KEKB
Five Key Computer Components
Introduction Software Hardware
Status of TTF HOM Project Aug 9, 2005
LIU BWS Firmware status
Presentation transcript:

3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10 on Feb 20, Needed to retime gates to BS Clock –Which had been done over the next few days –BUT…

3/14/2007AD/Instrumentation Department Jim Zagel 2 MFW Problem: P-Bar Injection First of 4 bunches is larger than the other 3.

3/14/2007AD/Instrumentation Department Jim Zagel 3 P-Bars to RR Huge P-Bar Bunches are transferred from the Accumulator into the Recycler ring.

3/14/2007AD/Instrumentation Department Jim Zagel 4 Integrator Hold Time Integrator “Hold Time” from data valid was 200ns –Only 25ns is required for the Comet Digitizers. We reduced the Hold time to 100ns.

3/14/2007AD/Instrumentation Department Jim Zagel 5 P-Bars RR to Tev

3/14/2007AD/Instrumentation Department Jim Zagel 6 Retimed Acc to RR

3/14/2007AD/Instrumentation Department Jim Zagel 7 New Problems

3/14/2007AD/Instrumentation Department Jim Zagel 8 Oops! Apparently 2MHz digitizers really have a hard time digitizing at a 2.5MHz rate Recall we have 4 bunches separated by 400ns. We replaced the horizontal 2MHZ Comet with a borrowed 5MHz board.

3/14/2007AD/Instrumentation Department Jim Zagel 9 New Horizontal 5MHz Comet

3/14/2007AD/Instrumentation Department Jim Zagel 10 MFW So Far Have re-timed both wires. Need to replace the Vertical 2MHz Comet with 5Mhz board. Need to check flies on next Tev shot –Set appropriate voltages to eliminate saturation.

3/14/2007AD/Instrumentation Department Jim Zagel 11 Test Loss Monitor at A0 Update

3/14/2007AD/Instrumentation Department Jim Zagel 12 Pulsed LED Signal

3/14/2007AD/Instrumentation Department Jim Zagel 13 A0 Loss Monitor Test

3/14/2007AD/Instrumentation Department Jim Zagel bunches in Tev Unfortunately the PMT is not Powered

3/14/2007AD/Instrumentation Department Jim Zagel 15 Support For new Wire at A0 Need –New Cables to Tunnel –New Computer –New VME Chassis –New Motor Control Hardware –PMT Power Supply Software –Minor modifications to generic FW code –Database Changes