1 SEM08-14 rev. Mar 2001 Specialist Task Forces (STFs) Alberto BERRINI CPM department Specialist Task Forces - Project Manager.

Slides:



Advertisements
Similar presentations
World Class Standards OGF20 OGF-ETSI MoU BoF and ETSI GRID STF 2007 call for expert Introduction to 11th May OGF-ETSI Grid testing workshop and ETSI TC.
Advertisements

How does ETSI work? ETSI Seminar © ETSI All rights reserved.
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
REPORT FROM OCG#50 TO BOARD#93 Doc: ETSI/BOARD(13)93_052r1 Source: OCG Chairman Agenda item: 4 For: Discussion (Late) © ETSI All rights reserved.
SEM08-14 Specialist Task Forces (STFs) Who they are ? What can they do for you ? How we manage ? ETSI Seminar June 2010 Specialist Task Forces (STFs) Who.
SEM02-10 The ETSI Secretariat ETSI Seminar © ETSI All rights reserved.
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
1 The Protocol & Testing Competence Centre. 2 In Pursuit of Interoperability Ultimate aim of ICT standardisation is interoperability Likelihood of interoperability.
1 Why ETSI is the place to bridge EU and LA initiatives on e-administration Francisco Da Silva Chairman of the Kick Off Meeting Sophia Antipolis,
SEM08-14 SPECIALIST TASK FORCES (STFS) ETSI Seminar SEM08-14.
SEM11-06 COMMITTEE PROCEDURES ETSI Seminar © ETSI All rights reserved.
GRID-Workshop 24 May ETSI GRID-WORKSHOP 24 May 2006 Introduction Karl Heinz Rosenbrock ETSI Director General.
Philippe COUSIN Interoperability Service Manager Milan ZORIC ETSI PTCC (Protocol and Testing Competence Centre) In pursuit of Interoperability RFID and.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Reshaping Digital Library Services at National Level – Why, How, When? Kristiina Hormia-Poutanen, Director of Library Network Services, Finland Liber annual.
1Hans van der Veer The New TIPHON STFs for 2002 and beyond Hans van der Veer.
World Meteorological Organization Working together in weather, climate and water Assistance for Haïti Side meeting 9 March 2010 RA IV Hurricane Committee.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
ETSI STF 333 Stephen Furner Chair ETSI Technical Committee Human Factors.
Tetra WC_13 Dec TETRA World Congress 2001 Nice Acropolis, December ETSI & TETRA MoU: the Winning Combination for the PMR Market Karl Heinz.
PEOPLE FIRST Department of Management Services State of Florida Orientation Session & Briefing October 7, 2002.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
World Class Standards Standards Mandate M 376 – Phase 2 European public procurement of accessible ICT Mandate M European Accessibility requirements.
World Class Standards © ETSI 2007 All rights reserved ETSI Tomorrow’s World Today.
. Summary of the consultation on the CES Census Recommendations Conference of European Statisticians 17 June 2015.
The IUCN Programme Nature+ Proposal, May 2011.
TBXXX / STFXXX CLOSE DEBRIEFING REPORT Subject Presented by TB Chairman © ETSI All rights reserved Version: 7 December 2012.
The Preparatory Phase Proposal a first draft to be discussed.
Wave 1 Project Current Status (identify recent engagements, deliverables, etc.) What’s Next Strategic Purchasing – Scientific Supplies MRO Supplies Computer.
WPM What’s behind the icon? Work Programme Management.
Welcome to the first in a series of briefing notes prepared by NES to provide stakeholders with the most up-to-date information available on the project.
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
1 IPv6 and ETSI : some initiatives Interoperability service manager SEE MORE AT
2nd Workshop on Wideband Speech Quality - June ETSI TC STQ STF 294 Improving the quality of eEurope wideband speech applications by developing a.
Doc.: IEEE /296r0 Submission May 2002 Erwin Noble, PhilipsSlide 1 ETSI-BRAN #28 Interworking Group Liaison Report to IEEE WNG Erwin Noble.
Tinus Pulles & Justin Goodwin Guidebook Revision Elements for a Maintenance Plan Consultants view.
Update on ETSI Security work Charles Brookson OCG Security Chairman DOCUMENT #:GSC13-PLEN-57 FOR:Information SOURCE:Charles Brookson AGENDA ITEM:6.3
September, 2005What IHE Delivers 1 A New Governance for IHE-Europe David Monteau, INRIA IHE-International Meeting, Nov
Doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Joint HR / L&D Managers Forum Business Planning & the CFOA Website Joy Flanagan Programme Officer.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
World Class Standards 44TD21 The ETSI Standards Engineering Process STF308 DTR/MTS Steve Randall STF308 © ETSI All rights reserved MTS#44 March.
Session with Partners, 8 October 2014
ETSI STF333: “European accessibility requirements for public procurement of products and services in the ICT domain, Phase 1” (EC Standardisation Mandate.
Support- IRDiRC Proposed Work Plan And Communication Strategy
Technical Organization and approval procedures
HL7/College/University Internship Program
Office of Grant Resources
How to Design and Implement Research Outputs Repositories
Automated Interoperability Testing
TC MTS / STF 430 Close Debriefing Report
Student Administration and Support Programme and Project Timelines
ETSI Activities Related to IP and Multimedia
Student Administration and Support Programme and Project Timelines
Swedish Standards Organizations EC M.376 coordination meeting
<month year> doc.: IEEE ptc November 2012
Student Administration and Support Programme and Project Timelines
Anthony Wiles ETSI PTCC On behalf of Hans Van der Veer
ESO response to EU RFID Mandate M/436
ETSI STF333: European accessibility requirements for public procurement of products and services in the ICT domain (Phase 1, EC Standardisation Mandate.
Second Independent Evaluation of UNAIDS
The ETSI Standardisation Process
ESO response to EU RFID Mandate M/436
RESOURCE MOBILISATION FOR SNA 2008 PROJECT
ETSI MTS#76 Meeting 23-Jan-2019
CEN/WS XBRL PT kick-off meeting
STF 491: TTCN-3 Evolution 2015 Final Report summary
Specialist Task Forces (STFs)
Aim of presentation CBSC was tasked to propose to the Council via IRCC to provide information on the minimum resources needed to support a sustainable.
Presentation transcript:

1 SEM08-14 rev. Mar 2001 Specialist Task Forces (STFs) Alberto BERRINI CPM department Specialist Task Forces - Project Manager

2 SEM08-14 rev. Mar 2001 The STF concept  The normal working method to produce ETSI standards is by voluntary contribution of the Members in the Committees, however, ETSI can contract experts to set-up STFs  STFs are funded from the ETSI budget, EC/EFTA Vouchers, voluntary contributions from Members  STF experts normally work together in sessions in the ETSI premises of Sophia Antipolis  The reference TB has the technical responsibility for the STF and approves their deliverables  The ETSI Secretariat provides management support, technical supervision and office facilities An STF is a group of experts working together to draft urgent deliverables or to perform special tasks on behalf of an ETSI Technical Body

3 SEM08-14 rev. Mar 2001 The STF role in the ETSI standards production Technical Body STF (contracted experts) Funding Boardapproval STF ToR Published ETSI standard TB approval Draft ETSI standard ETSI EC/EFTA Members Committee voluntary work Normal work Urgent work Draft standard

4 SEM08-14 rev. Mar 2001 TB Technical guidance Experts Organization of an STF WG Steering Group Team Leader ETSI Secretariat Project Management

5 SEM08-14 rev. Mar 2001 CPM Administration, Project Management Funded Projects STFs (Experts Teams) Sub-Contracts Studies, Experiments Validation Research, etc. PEX Technical Support PTCC (testing projects) FWP (system projects) ETSI TBs ToR Beyond STFs: the Funded Projects ‘toolkit’ Project Support Technical Control e.g. MCC ‘Tasks’ Partnership Projects

6 SEM08-14 rev. Mar 2001 kEURO FWP STFs1 700FWP STFs1 700 PTCC STFs *930PTCC STFs *930 MCC Tasks * 850MCC Tasks * 850 MCC subcontracts560MCC subcontracts560_____ Total ‘Funded Projects’4 040 Funded Projects resources in 2000 * not including PTCC staff support

7 SEM08-14 rev. Mar 2001 STF contribution to ETSI deliverables Drafted by STFs Drafted by SMG/3GPP Drafted by other TBs without STF TB approved

8 SEM08-14 rev. Mar 2001 STF cost to draft a deliverable (management STFs are excluded) 42,0 31,1 34,2 23,424,1 18,7 17, kEUR/deliv

9 SEM08-14 rev. Mar 2001 Twelve years of STFs STF Teams (20 new STFs in 2000) 240 STF Teams (20 new STFs in 2000) 650 Experts in total (100 experts in 2000) 650 Experts in total (100 experts in 2000) > 1,000 Deliverables produced directly by STFs * (196 in 2000) > 1,000 Deliverables produced directly by STFs * (196 in 2000) * (management and project support not included)

10 SEM08-14 rev. Mar 2001 GA endorsement Board approval TBs negotiation Member’s consultation Members Preparation of the STF Work Programme 2002 EC/EFTA ETSI STF proposals (ToR) Funding Technical Bodies Oct Oct 01 Sept 01 Work Programme 2002 in place Contingency for new STFs in Nov 1 Sep Jan 2002

11 SEM08-14 rev. Mar 2001 Experts’ availability Experts Selection STF work plan Contracts Preparatory Meeting Candidatures Review Candidatures from ETSI Members Call for Experts (Collective Letter) Recruitment and set-up of an STF Funding available 1- 2 weeks 6 weeks ToR approved STF at work weeks ToToToTo (7–10 weeks from T 0 )

12 SEM08-14 rev. Mar 2001 STF home page on the ETSI WEB: Example of information available on the site: How to create an STF How to create an STF How to create an STF How to create an STF STF ToRs template STF ToRs template STF ToRs template STF ToRs template How to join an STF How to join an STF How to join an STF How to join an STF Open Call for Experts (vacancies) Open Call for Experts (vacancies) Open Call for Experts (vacancies) Open Call for Experts (vacancies) STF contractual conditions STF contractual conditions STF contractual conditions STF contractual conditions List of active STFs List of active STFs List of active STFs List of active STFs WEB addresses for more information on STFs Contacts STF Manager: Alberto Berrini Alberto BerriniAlberto Berrini Recruitment Assistant: Christine Voulgre Christine VoulgreChristine Voulgre

13 SEM08-14 rev. Mar 2001 Testing Validation Methodologies TTCN SDL ASN.1 Quality ETSI STFs working areas VoIP Multimedia Terminals VideoPhone TV GSM UMTS DECT TETRA HiperLan ERMES Euro-Rail Radio Aeronautical Satellites 3GPP ISDN Private Networks Q-SIG Leased Lines UPT PABX TBRs Security Human Factors Design for All QoS Speech recognition Unique User ID