AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,

Slides:



Advertisements
Similar presentations
Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Example The following figure shows a reaction system in which the temperature increases with the feed rate of flow-controlled stream D. Heat is removed.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Service Section Technical Training December 2005.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Installation of the T600 at Fermilab
Gaseous N2 -196⁰C Vacuum Liquid N2 -196⁰C Radiation shields Outer wall
Cryomodule test stand at ESS site
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
NWU IT-ES/NWU IT-ELD Monitoring systems
Sequence Valves.
Prepared by: Celeste Ng Updated: May, 2017.
SPS cryogenic proximity equipment and SM18 validation
Recent developments in the Vacuum Control Software
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Advances studies in the low-energy QCD in the strangeness sector
Magnet Safety System for NA61/Shine
Mathew C. Wright October 2016
1MB/sec streaming data out 32 data lines in 4 RS-232 ports Cryopanel
Fault codes.
EVLA MONITOR & CONTROL CDR
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
November technical stop activities:
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Vacuum Control System for Monolith Vacuum
Presentation transcript:

AdV- VAC CTRL SYS/Cryo Interface 06Feb2013

Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature, controller of feeding valve, phase separator electronics...

‘Control System’ The general system that collect data from all vacuum equipment and operate them also by remote trough the supervisor SW. A ‘Vac Rack’ is foreseen for each crytrap, it will allow the operation of vacuum pumps and valves, and interface also with cryogenic equipment (And also interface with DAQ)

Some tasks related to cryo equipment Need to operate cryogenic devices (adjust the set point of LN2 level, feeding valves closing, start / stop temp sensors...) from Local. And also by remote (a few of them..., normally by the general vacuum SW) Need to provide some interlocks from the ‘cryo equipments (alarms) to the ‘rest’ of the system Need also to monitor ‘most’ signals from cryo equipment and record them (normally by the general vacuum SW)

Example of interlocks Alarm of cryotrap over temperature Set point temperature reached (<80K) Alarm of high LN2 level Alarm of low LN2 level Set point LN2 reached Phase separator alarm...

Signals monitored by remote Most of available ones, example

‘’Interface definition & task sharing’’ Discussion about the task sharing and to prepare the exchange of information