Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

BoRit Superfund Site Timeline
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Washington State Department of Transportation Stormwater Discharge Permit January 2008.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Chesapeake Bay Program Habitat Goals Implementation Team June 26, 2013.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.
Nonpoint Source Pollution Reductions – Estimating a Tradable Commodity Allen R. Dedrick Associate Deputy Administrator Natural Resources & Sustainable.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.
EXPLORING RECREATIONAL AND EDUCATIONAL OPPORTUNITIES AT THE PICAYUNE WOOD TREATING SITE Michele Mahoney, EPA TIFSD.
The Non-tidal Water Quality Monitoring Network: past, present and future opportunities Katie Foreman Water Quality Analyst, UMCES-CBPO MASC Non-tidal Water.
Inventory and Monitoring Terrestrial Fauna Inventory and Monitoring Terrestrial Fauna Linking Field Activities to Budget Processes.
Illinois River Basin Restoration (Sec 519, WRDA 2000) Rock Island District Website: Agenda Summary of HQ Com Plan Rest.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
US Army Corps of Engineers South Atlantic Division One Corps Serving The Army and the Nation US Army Corps of Engineers South Atlantic Division One Corps.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Integrated Ecological Assessment February 28, 2006 Long-Term Plan Annual Update Carl Fitz Recovery Model Development and.
Saginaw Bay Phragmites Control and Restoration Demonstration Project Julie Sims MDEQ, Water Bureau SBCI Regional Update Meeting Bay City, MI June 5, 2009.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Chesapeake Bay Program’s Baywide and Basinwide Monitoring Networks: Options for Adapting Monitoring Networks and Realigning Resources to Address Partner.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
THE CHARACTERISATION OF A RIVER BASIN DISTRICT Case study on the construction of the baseline scenario Inspired from the Oise case (F) Most elements picked.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
The Central Everglades Planning Process DOI Team Briefing November 14, 2011 November 14, National Research Council CISRERP Update 5 th Biennial.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Water Quality Monitoring in Michigan, : A Decade of Program Evolution By: Gerald Saalfeld, MI Department of Environmental Quality.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
RECOVER PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
Restoration Under a Future Climate Understanding and managing climate change effects on federal lands Dr. Cynthia West, Director Office of Sustainability.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Klamath Tracking and Accounting Program
The City of Los Angeles and The Los Angeles River
Presentation transcript:

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Options for Accelerating Recovery of Phosphorus Impacted Areas in the Florida Everglades February 28, 2006 Long-Term Plan Annual Update Jamie L. Serino Director, Everglades Division SFWMD

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Options for Accelerating Recovery Problems: Phosphorus (P) enriched discharges into the EPA Human-mediated changes to hydrologic patterns BMP and STAs address the source of P However, sediments in the impacted areas of the Everglades are enriched in P Monotypic stands of cattail have resulted which are dependent on the high levels of P This sediment will continue to be is a source of P for cattail for decades

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Options for Accelerating Recovery

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Options for Accelerating Recovery Approach: Conduct research to answer questions related to accelerating the recovery of cattail impacted areas SFWMD scientists developed research projects to address the issue: ØFire Project ØThe Cattail Habitat Improvement Project (CHIP) These projects were presented at an “Options for Accelerating Recovery” Scientific and Public Workshop The projects were then reviewed by an external panel of expert scientists

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Options for Accelerating Recovery Outcome: A detailed Research Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Options for Accelerating Recovery Projects Personnel: Everglades Division Director (Jamie L. Serino) Project Manager for Accelerated Recovery (Thomas W. Dreschel) Fire Project Scientists (PI: ShiLi Miao) Cattail Habitat Improvement Project Scientists (PIs: Susan Newman, Scot Hagerthey, Mark Cook)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long Term Plan Update Ecological effects of fire and natural recovery in a phosphorus (P)-enriched Everglades wetland (Fire Project) ShiLi Miao

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Fire Project Objectives: To assess whether repeated fire can be used as an effective management tool to manage cattail expansion

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Fire Project Project design: Six 300 m X 300 m plots within WCA2A 300 m

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Fire Project Project Status: Completed Tasks ØSite selection ØWalkway construction ØCoordination with outside labs and agencies ØMethods testing for sampling procedures

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Fire Project Water quality Biomass harvest Plant growth Soil study Studies Initiated: Seed bank

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Fire Project Upcoming events in 2006:  Continued pre-burn sampling and studies  First burn implementation  Post-burn sampling  Initiation of decomposition study  Initiation of native vegetation recruitment study ØPublic outreach

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long Term Plan Update The Cattail Habitat Improvement Project Sue Newman, Scot Hagerthey, and Mark Cook

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project Objectives:  To determine the effects of large scale cattail removal on ecosystem structure (plants and animals) and function (e.g., nutrient cycling)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project Project design: Created fifteen 250 m X 250 m plots within WCA2A  Six plots in an enriched area; three open plots and three control plots  Six plots in a transitional area; three open plots and three control plots  Three plots in an unenriched area; all control plots

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project 250 m Airboat Maintained Buffer (in open plots only) Grab & Tube Samples Autosampler Hydrolab Met Station Designated Paths Fish Sampling Predefined Sampling Area N Staging Platform

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project Project Status: Pre-burn construction: Fifteen wooden platforms (4X4 m) Nine wooden walkways (100 m) Six control plot metal sampling platforms Six open plot metal sampling platforms Completion of firebreaks around open plots

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project Project status Completed tasks:  Protocol selection for each attribute  Pre/post burn water quality and herbicide monitoring design complete  Everglades Research Database Production attributes assigned  Coordinated with analytical labs and state agencies for sample analysis

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Cattail Habitat Improvement Project Upcoming events in 2006:  Continued maintenance of fire breaks  Herbicide application in open plots in May  Controlled back burn of open plots in June  Water quality and herbicide monitoring begins in May  Protocol verification and refinement (inverts and fish)  Construction of last six walkways in open plots after the burn  Public outreach

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Accelerate Recovery of Impacted Areas Tracey Piccone, P.E.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Alternatives Analysis & Plan Formulation Project Manager: TBD Project Description: Conduct a full alternatives analysis and develop a plan formulation of management scenarios for accelerating recovery of impacted areas of the Everglades Protection Area. Prepare report summarizing risks and benefits associated with different management scenarios

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Alternatives Analysis & Plan Formulation Status Work not scheduled to start until FY08 Plan includes recommended funding of $400,000

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Hydropattern Restoration Project Manager: Tracey Piccone Project Description: Restore a sheet flow approximation to various areas along the northerly boundary of the Everglades Protection Area Structural modifications and components to allow delivery of STA discharges to WCA-2A, East WCA-3A and West WCA-3A via a sheet flow approximation

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Hydropattern Restoration Status Work not scheduled to start until FY2009 Construction complete by end of FY2012

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Implement Steps to Accelerate Recovery of Impacted Areas Project Manager: Tracey Piccone Project Description: Implement the most promising techniques to accelerate recovery of the impacted areas in the EPA

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Implement Steps to Accelerate Recovery of Impacted Areas Status Work not scheduled to start until FY2010 Construction complete by end of FY2014

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Adaptive Implementation Project Manager: Tracey Piccone Project Description: To implement additional enhancements and modifications resulting from the PDE process that can be implemented within the existing footprints of the ECP STAs, or added to CERP projects as a locally preferred option to enhance their water quality performance Plan includes recommended funding of $36 million

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Adaptive Implementation Status Plan recommended funding of $9 million per year starting in FY2007 and ending in FY2010 ØUnused FY04 funds from other Long-Term Plan projects were transferred to this project to assist with the surveying phase of the Bolles and Cross Canal Improvements Project (first minor revision to the Plan) ØIn FY05, funds were budgeted and used for the EAA Regional Feasibility Study

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals As part of proposed revision to LTP, FY06 funds not needed for two projects will be used for Adaptive Implementation activities ØReal Time TP monitoring at STAs ØVegetation Management Strategies ØBMPs in District Canals ØSTA-1W Cell 5 drawdown/enhancements Adaptive Implementation

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Public Comment