The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.

Slides:



Advertisements
Similar presentations
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Advertisements

Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Sergio Palomares-Ruiz June 22, 2005 Super-NO A Based on O. Mena, SPR and S. Pascoli hep-ph/ a long-baseline neutrino experiment with two off-axis.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
MINOS sensitivity to dm2 and sin2 as a function of pots. MINOS sensitivity to theta13 as a function of pots Precision Neutrino Oscillation Physics with.
Booster Radiation Damage Facility (RDF) Some History The Radiation Damage Facility originated in the AP4 beam line, used primarily for testing the D0 Vertex.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
The MINERnA Experiment
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
Physics Topics in MINER A David Boehnlein - Fermilab for the MINERvA Collaboration Overview of MINERvA The high intensity of the NuMI beamline at Fermilab.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
1 SciBar for Booster Neutrinos T. Nakaya (Kyoto) March 30, 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
July 6, INPC 1 The MINER A Experiment R. Ransome Rutgers, The State University of New Jersey for the MINER A collaboration ν Full MINERνA Detector.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Status Update of Ongoing Efforts for NuMI Horn 1 Stripline Redesign and Horn Change Out Kris E. Anderson All Experimenter’s Meeting 06-Jul-2015.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Future Neutrino Physics Mitch Soderberg Fermilab Institutional Review June 6-9, 2011.
NuMI NBI03 November 7-11, 2003 FNAL thin beam windows Jim Hylen / FNAL Page 1 FNAL experience with thin beam windows Issue is: Survival of window in high.
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
1 Future Short-Baseline Neutrino Experiments Workshop – March 21, 2012 Workshop on Future Short-Baseline Neutrino Experiments March 21, 2012 Fermilab David.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Accelerator Status and Plans
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
The MINER A Experiment Sacha Kopp, University of Texas at Austin on behalf of the Minerva Collaboration.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Beam Studies December 2014 Runs: 7821, 7822, and 7860 December 29, 2014.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
PROTON ECONOMICS: Program Planning Steve Geer Institutional Review 11 February 2015.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
Accelerated Protons and Personnel Doses
Opportunity for Near Detector Test at NUMI
Jaewon Park University of Rochester
Gep/SANE this week – quick overview
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011

Getting NT07 Ready We would like to thank Jim Hylen, Kris Anderson and the NuMI target group for getting NT07 ready for Beam and addressing all the issues that the last set of targets had. 2

3 Data Beam started in FHC mode, LE100, Medium Energy running –We will not request a target move before Oct 3 –The precise day will depend on how well things go. Beam started 10 AM Sep 24 and running well since Running at 36×10 12 POT/pulse & the plan to continue running at that intensity Detector came up with no problem –No change in the MINERvA detector during the shutdown 0.21×10 19 POT delivered from Sep Live time will be given next AEM Meeting

NuMI Beam Plots 4

Protons for the Week 5

FY2011 Protons 6

NuMI Protons over History 7