Modu-lab Low Cost Tools for High Tech Learning Electro-Mechanical Services, Inc. 109 Hermosa Dr. SE Albuquerque, NM 87108 Ph: 505 404 1087 Fx: 505 404.

Slides:



Advertisements
Similar presentations
Fields and Isolines.
Advertisements

Architectural Services Department HKSAR Laboratory Design for Secondary Schools.
Chemical Fume hood or Biosafety Cabinet
Lab Safety Rules & Procedures
Transistors (MOSFETs)
BEOL Al & Cu.
I have seen this happen !. You have exceeded your storage allocation.
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
ET Open Forum December How to balance rising energy costs with profitability? Biggest energy users for restaurants*: –Cooking: 45% of Natural Gas.
Lesson 6.5 Scale Drawings Students will be able to understand ratios and proportions in scale drawings.
 Materials & Fittings  What to buy  Quantity  Cost  Where to get them  When to buy i.e. before work starts  Blue print; this tells us the number.
Facility Layout 7 Personnel Requirements Shipping and Receiving.
Introducing the Biggest Breakthrough in Ventilation Since… Fresh Air…
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Current and Resistance
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Each 1 cm square = 20 cm What scale is this plan drawn to? Select the correct answer from the options below. Scale Drawings 1 : : 1.
CVFD Training – Water Supply SFFMA Training Objectives: –
E122 E123 E124 E125 E126 E127 E128 E129 E130 E131 E135 E136 E137 E138 E136 Solar Support Centre Desks for 4 people + connection to Bruce’s Workbenches.
Rotation of Two-Dimensional Solids
AT-LINE A Practical Application of Smart Modular Sampling Components IFPAC 2001 ABB.
Volume.
Volume.
Welcome to Field Controls: HRV / ERV Training Duct Systems Part 3
© Fraunhofer IPMS T. Zarbock I I slide 1 MEMS CLEAN ROOM 1500 m 2, class mm (6”) Wafer line 3 shift preparation for R&D and pilot fabrication.
Emergency Eye/Face Wash Training Training Provided by University of Wisconsin-Stout Safety and Risk Management Services.
Chapter 12 Electronics.
Battery Principles.
Interpret drawings of domestic structures. Drawing Layout The drawings on the next two pages show how a construction drawing can be laid out to show the.
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
DIEDRIC SYSTEM.
By Laura Brooks.  An average home uses more than 200 gallons of water per day  Clothes washer  Dishwasher  Faucet  Showerhead  Leaks  Toilet.
FALL PROTECTION IN THE WORKPLACE Trainer’s Guide
Water piping design.
Basic Circuits Foundations of Technology Basic Circuits © 2013 International Technology and Engineering Educators Association, STEM  Center for Teaching.
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Scale Drawings & Proportions
Bio Science: Safety. 1. Explain why warning signs in labs are symbol heavy 2. List and explain purpose of preventative safety equipment 3. List and explain.
Virtual NanoFab A Silicon NanoFabrication Trainer
Feb 2007Stith1 Semiconductors Material, Components, and Manufacture Joseph Stith February 2007.
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
1 Fundamentals of Microelectronics  CH1 Why Microelectronics?  CH2 Basic Physics of Semiconductors  CH3 Diode Circuits  CH4 Physics of Bipolar Transistors.
Unit 5 Test 2 Geometry Review Game. Please select a Team Tris 2. Christina 3. Four 4. Caleb 5. Eric.
Science Safety Notes. Science Safety Rules 1.Goggles If a lab calls for the use of goggles, keep them on at all times (no matter how dorky you look) until.
Computing Actual Lengths From a Scale Drawing Learning Target I can compute actual lengths in a picture using the scale.
Manual Density Business Today
Perforated PVC pipe attached with PVC tank. Folded galvanized sheet as drain tray over metal supports. Dual side operation and use ADVANTAGES · Can be.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Third angle orthographic projection
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
Microfabrication Home exercise #3 Return by Feb 21st, 22 o’clock
IC Manufactured Done by: Engineer Ahmad Haitham.
EE 3311/7312 MOSFET Fabrication
Special-Purpose Outlets— Electric Heating, Air Conditioning
Microfabrication Home 3 exercise Return by Feb 5th, 22 o’clock
ROCKET TESTING TYPES OF TESTS
Engineering Technical English Islamic University of Gaza
Scale Drawings Bell Ringers
Chapter 1 & Chapter 3.
Manual Set-Up for Density by Hydrometer Method 1.10
Outline Drawing types and scales Types of views used on drawings.
SCT/Pixel Draft Rack Layout rcj
Lecture #25 OUTLINE Device isolation methods Electrical contacts to Si
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Laboratory: A Typical Wet Etching Process
Area Of Composite Shapes
Volume.
Presentation transcript:

Modu-lab Low Cost Tools for High Tech Learning Electro-Mechanical Services, Inc. 109 Hermosa Dr. SE Albuquerque, NM Ph: Fx: DIFFUSION FURNACE WET ETCH METROLOGY DEVICE CHARACTERIZE WET PROCESS PVD PHOTLITHOGRAPHY HOTWALL C.V.D. PLASMA Modu-Lab lab layout: This page shows one example of a training lab layout. The approximate scaling is for a room of 7 meters X 15 meters ( ~20 ft. X 45 ft). The gray areas approximate the user areas and delineate free space for operation and maintenance of the systems. The blue is the actual module outline. The modules come in two lengths with only 1 width. The width is 77 cm (30in.) and the lengths are 153 cm(60 in) and 183 cm (72 in.). Modules with circles require exhaust. A large circle designates approx 8.5 m 3 /min(300CFM). The small circle designates a flow of 1.4 m 3 /min.(50CFM) Both flows are with a static pressure of.3 mm H 2 O(1/8”wg). SAFETY EYE WASH OXIDATION FURNACE WET ETCH METROLOGY DEVICE CHARACTERIZE WET PROCESS PVD PHOTLITHOGRAPHY PLASMA HOTWALL C.V.D. OXIDATION FURNACE DIFFUSION FURNACE The layout above shows a full complement of modules. A basic complement that will allow fabrication of transistors, diodes, capacitors and resistors does not utilize the Hotwall or Plasma systems. The fume hood and eye wash are not supplied by EMS. The fume hood is not required, but is highly recommended. The object below are for cutting and pasting into your own layout drawing. In order to rotate the objects correctly, you may have to ungroup the object and manipulate accordingly. SMALL FUME HOOD

Modu-lab Low Cost Tools for High Tech Learning Electro-Mechanical Services, Inc. 109 Hermosa Dr. SE Albuquerque, NM Ph: Fx: WET ETCH METROLOGY DEVICE CHARACTERIZE WET PROCESS PVD PHOTLITHOGRAPHY HOTWALL C.V.D. PLASMA DIFFUSION FURNACEOXIDATION FURNACE SAFETY EYE WASH SMALL FUME HOOD

Modu-lab Low Cost Tools for High Tech Learning Electro-Mechanical Services, Inc. 109 Hermosa Dr. SE Albuquerque, NM Ph: Fx: Layout and Installation Notes: 1)The lab should have eyewash and/or safety shower 2)A fume hood with a sink has proven to be a nice advantage to the lab. 3)A small DI water system is also recommended - the alternative is to provide rinse water in jugs. Distilled water works pretty good. 4)Always keep in mind the required free space around the modules. 5)The use access designation is the dimension from which usage of the module is accessed. eg - the WPM is used from the width side. 6) Maintaining the water supply tanks in the WPM and WEM requires access to both ends in order to remove and replace the rinse water supply. 7)The furnaces are loaded and unloaded from the end; but gas and temp control are accessed on the right hand side when facing the front end. 8)The wet processors are easily field retrofitted for connection to house water and drains. 9)When constructing a layout, it may be advantageous to place exhausted modules in the same vicinity to minimize duct work.