13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 13-14 April.

Slides:



Advertisements
Similar presentations
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
Advertisements

University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
21/22 September 2002IMACS update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 21/22 September 2002 Boston, MA.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
Figure 1, MODS exploded Figure 2, Blue Camera Design Figure 3, Blue Camera Structure Figure 4, MODS CCD Dewar Figure 5, MODS I 4k x 4k CCD Figure 6, QE.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Freiburg, May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP Instrument.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Quarterly Review May 1, QUARTERLY REVIEW May 1, 2002.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
Position sensing in Adaptive Optics Christopher Saunter Durham University Centre for Advanced Instrumentation Durham Smart Imaging.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Telescope Integration and Tests Tuesday Afternoon.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Magellan technical updates, Pasadena April 2006 – September 2006.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Binospec - Next Generation Optical Spectrograph for the MMT
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Astronomical Observational Techniques and Instrumentation
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Prime Focus Imaging Spectrograph Status
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Prime Focus Imaging Spectrograph Status
Magellan Telescopes Observatory Report
COSMOS Status David Sprayberry, Sean Points & Jay Elias
FourStar 4K x 4K JHK imager
Control System Summary of Changes Since PDR
Presentation transcript:

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April 2002 OCIW, Pasadena, Ca

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 2 IMACS project team: A. DresslerPr. Investigator B. BigelowInstrument Scientist B. Sutin, H. EppsOptical des./eng. B. Bigelow, T. Hare S. Gunnels, G. Luppino, R. Cleary Mechanical des. V. Kowal, R. Storts, J. CastilloMechanical fab. A. Bagish, D. Carr, J. AsaElectronics G. Burley, I. Thompson, J. EstradaDetector systems C. Birk, K. ClardySoftware eng.

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 3

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 4

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 5

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 6

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 7

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 8 Optics Status: Collimator: C01 (Field lens) Done, ready to mount in cell C02 - C05Done, mounted in structure Long Camera: L01 Done, mounted in cell L02/L03/L04Lenses done, will be re-mounted in cells L05, L06Done, mounted in cells Long camera should be fully assembled by end of April 2002

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 9 Optics Status cont. Short Camera: S01, S08 (aspheres)At Tinsley, due 6/02 S07At TORC, due end of April? S02-S09Ready to be coated at STF Filters: 2 sets of CTIO B,V,I,Done 2 sets of CTIO RDue end of April ‘02 CTIO U (LCAM)Awaits ADC coating results Sloan u’, g’, r’, i’, z’Not ordered

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 10

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 11

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 12

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 13

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 14 Current grating selection:

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 15 Optics Status cont. Grisms: 200 l/mmUndersized mat’l re-ordered 300 l/mmMaterial due in August 600 l/mmMaterial due in May Imaging Mirror:Mirror is being re-coated following failure of over-coated silver.

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 16 Mechanical Engineering Status: Guide camera stages (Hare)Done, mods. IP Mask server (Bigelow)Done, on structure *Field Lens (Hare)Ready for mounting LCAM shutter (Hare)Done, ready to install Filter servers (Bond) Done, ready to install *Disperser server (Hare)Assy. IP, drive remaining *Grating cellsAssy. IP *Grism cellsDesigned, ready for draft. Mirror cellDone

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 17 Mechanical Engineering cont. Collimator mech. (Bigelow)Done, installed *Long camera mech. (Bigelow)Final Assy. in April Short camera mech. (Bigelow)Done, ready for optics Dewar (Luppino)Done, ready for CCDs Instrument Structure (Gunnels)Done, installed *Instrument Carriage (Gunnels)Done, minor mods. IP *Instrument Enclosures (Gunnels)Design IP

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 18 Center-field guide camera assembled and tested

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 19

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 20 Long camera with shutter, FS, and dewar mounted

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 21 Electronic Engineering: Alan Bagish (OCIW) is completing the electronics design for IMACS. Joe Asa is providing final assembly services on a consulting basis. Status of electronics: Schematics design (all motion stages)Done (4) Motion control (MC) chassis, Done (1) Power supply chassis, Done (1) Shutter control chassisDone (2) Electronics racks for chassisIP Instr. wiring harnessesIP

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 22

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 23 Detector systems: Guide cameras: - 23 cameras have been fabricated - IMACS currently has one of three needed - Remainder by May ‘02? Science array: - Detector array (8 CCDs) has been flattened to 7.5 microns - Individual detectors flat to 13 microns - Dewar and detector system mechanics done - Cold test of array in May

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 24 Software: Guiding (Clardy): - Guider position control GUIDone - Guider position graphical displayDone - Interface to telescope control****

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 25

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 26 Slit Mask Cutting (Clardy) : - Mask Generation (MG) **** inputs - images, data files, other output - text file with targets, names, etc. - Mask Definition (MD) Done - inputs - text file from MG, other text files - output - mask definition file - database for observing, data reduction - Mask Fabrication (MF)Done - inputs - mask definition file - output - test, laser G-code, mill G-code,.ps files

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 27 Software: Instrument Control (Birk) Individual module testing: ModuleGUI statusH/W tests Pr. Guiderdone75% SH guiderdone75% CF guiderdone90% Slit Mask Serverdone75% Disperser Server25%0% Long Camera Focusdone90% Filter Servers (2)done90% Flexure Controldone75% Detector Focus25%0% HP Sensor Systemdone50%

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 28 Software: Instrument Control cont. Integrated instrument testing: - One GUI at this level, showing all critical aspects of each module (encoder positions, limit status, temperatures, etc). - This GUI is written and 75% tested, unfinished stages remain (Disperser Server, Grating tilts, detect. focus) User Level Software: - Two GUIs at this level: - Instr. control interface (select a grating, etc.) - 50% done - Graphical Instr. Status Display - 25% done

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 29 Examples of individual stage test GUIs Filter server GUI SH guider GUI

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 30 Engineering GUI, shows status of all stage functions and sensors, operates in parallel for all modules.

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 31 User/Observer instrument control GUI

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 32 Graphics-based instrument GUI

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 33 Software: Science Array Control (Birk) Shutter control: - micro-controller for linear motors90% done CCD readout / camera control: - ‘ccdserver’ for array readout - ‘camgui’ for user interface - both are functional75% done Quick-Look Tool: - functional with simulated data90% done

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 34 Detector GUI Quick-look tool

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 35 Slit Masks: Laser system: - Convergent Gemini 150 W. CO2 laser cutting system - Ordered November 7, $280K - Acceptance testing completed March 18-22, Currently in shipment to Chile - Due at LCO May 1, 2002 ASB Facility: - 200A electrical service required - Air compressor delivered, installation required - Ventilation, fire, and fume extraction systems still required

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 36

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 37 Slit Masks: Slit mask blanks: - Fabricated by California Hydroforming - Current order of 100 mask blanks in progress - Order of 1000 parts to follow first delivery Mask cost: - Estimated to about $100 per mask, including laser (500 masks/year for 10 years)

13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 38 Coming up: - First light through optics - end of April - Grating tilt mechanism assembly and testing - flexure - Cold testing of CCD array - May - Instrument enclosures - August - All short camera optics coated - September