B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

Everything you ever wanted to know about 774….
SETUP Chapter 6 Lead Abatement for Workers Course.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Moving Out of Mount Hall What you need to know. Move Out Schedule Currently: Media Services June 23: – Student Support Services (to Enarson) (Owens) –
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Shop Safety and Conduct By: Mr. Beese. Safety In The Work Area Keep Work Area Clean Tools Put Away Fire Hazards can be avoided Shop Floor.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
To Do: 1.Egg Babies due – get stamped! 2.Apartment Search due Tuesday! 3.Buying a Home Power Point – take notes for quiz Tuesday! 4.Bring budget WS Tuesday.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
Home & Office Design Web app. Final Spec The Web page will have 5 main areas: 1.Design tools 2.Objects view 3.Objects menu 4.Information Zone 5.Main menuu.
INNERSPACE HOME STYLING PRESENTS STAGING TO SELL Enjoy This Series of Tips & Ideas To Guide You Through Preparing Your Home for Sale.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
INTD 54 estimating carpet. measuring for carpeting carpet layout/map saves money and time shows: exactly where each carpet piece goes yards of carpet.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
Lab design Assignment 3 Unit 2.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Unit 15 Description (I) Step 1: Opening Remarks Step 2: Explain listening skills in Unit 15 Part A : Micro-Listening Listening for Key Words.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Energy Basics Understand it, Control it and Save.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Organising 904 RPC lab Ian 23 April Already done, ISR I3-I4 tunnel is empty. Move out and chamber/gap sorting done in the ISR. Manpower available.
External Data and DIP Oliver Holme 18 th January 2008.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
Physical Security Concerns for LAN Management By: Derek McQuillen.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Installation of the T600 at Fermilab Fermilab, February 15,
ELENA installation progress F. Butin / ELENA collaboration.
Schedule Access to the hall b508. Magdalena Kowalska.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
The Next Generation of a Gamma Irradiation Facility GIF++
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
EXTENSION ELENA = BUILDING 193 Status of integration
Maintain a single control room for all accelerator programs
Magdalena Kowalska, CERN PH-SME-IS
Presentation transcript:

B508 and 275 Magdalena Kowalska

b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics lab 3 AD offices Shelves and cupboards for small parts Entrance key changed – can request it via Jenny Part of bldg freed for AD experiments (Mar-Jun):  Only ASACUSA moved in by now  Ground-floor: COLLAPS cleanup ongoing, ex-SSP lab should be emptied for decontamination checks  First floor: electronics lab and detector lab cleaned, solid-state lab – partly cleaned, host also VITO things  Mezzanine: cupboards and shelves ready and used by experiments Like in February: Try to apply transparent rules: remaining space to be shared by all groups  Ground floor room – big equipment which has to be accessible asap during beamtimes or is fragile  SSP lab: space for test setups  1 st floor – shelves and several cupboards for smaller equipment Equipment which doesn’t meet this criteria:  Pease send it long-term storage or home- institutes  Our associate is documenting the equipment to be shipped away

B508 Done Signal cables Visitor room: Fixed projector and window blinds CERN locks for all doors Machine placement and conformity in mechanical workshop Ongoing Sorting tools in mechanical workshop – Ermanno Emptying cupboards from detector lab – already in use by COLLAPS and IDS In the pipeline - Kitchen furniture Every quotation more expensive than previous Finally EN and BE departmenst will pay – but need 2 more offers For when? ASAP – by October? Issues Ventilation was turned on only 2 weeks ago! External doors – difficult to open (low-quality crash bars inside) - ongoing Water dripping from some aircon connections - ongoing Kitchen wall with cracks – repaired Ground floor: Users moved in Aircon working rather well Laser DAQ rooms in use Laser labs getting ready (including interlock system) Physics users are moving in In preparations:  Closed cooling water system  Vacuum gas exhaust  Opening for SSP gases and fume cupboard First floor – in use: DAQ room for running setups ISOLTRAP DAQ RILIS room Visitor room