I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Design/Build Team for the US 36 Express Lanes Project.
I-80 Corridor System Management Plan Alameda County Transportation Commission ACTAC Meeting September 7, 2010.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
TRANSPORTATION SOLUTIONS: GETTING THE MOST BANG FOR YOUR BUCK! GPA Fall Conference 2013 Garth Lynch, PE, AICP HNTB Corporation October 10, 2013.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
April 6, 2015 I-4 Ultimate Project Overview. Agenda Overview of I-4 Ultimate How to stay informed Studies and communication Responses to questions provided.
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
THE I-75 DAYTON RECONSTRUCTION
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.
Robert L. Bertini Sirisha M. Kothuri Kristin A. Tufte Portland State University Soyoung Ahn Arizona State University 9th International IEEE Conference.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Challenged Detectors – Volume- Occupancy Plots & Maps.
Traffic Flow Parameters Surface Street Application.
1 Congestion Measurement Mark Hallenbeck TRAC. 2 Historical Use of volume data –AADT –AWDT, –Hourly volumes To estimate delays Can produce a reasonable.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
I-394 MnPASS Express Lanes Project Update Guidestar Board Meeting September 7th, 2005.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
Transportation Committee Update 10/13/2015. Transportation Committee Members Roads Subcommittee Bill Wanatosky Benson King Anthony Watkins Helene Rosenheim.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Work Zone & Incident Management Strategies Denise Markow, PE, TSMO Administrator Susan Soucie, PE ITS Project Manager ACEC/NHDOT 2016 Technical Exchange.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
City of Belmont Pavement Reconstruction Project October 15, 2014.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
SunGuide SM Incident Management Concepts Robert Heller October 21, 2004.
Visit Our Website at: Click to edit Master title style.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
The Oakton Condominium Association September 12, 2017
From North of River Road to North of State Road 681
IA 122 RECONSTRUCTION PRE-BID MEETING
US26: Cornelius Pass Rd -185th Ave
Florida Transportation Commission FY 2009
STATE SUEE AND ONE WAY CORRIDORS
Contract 60X10 Informational Meeting Weber I-55
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Presentation transcript:

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project

Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.

Existing Pavement Conditions

Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

ITS Devices  Dynamic Message Signs (DMS)  Travel Time Signs (TTS)  Also  Flow Detectors  CCTV Intelligent Transportation System Benefits  Quicker Incident Response Times  Informing the Motorists of Accidents and Travel Times  TRIP RELIABILITY

Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

Existing Sign Conditions

Concept 4 and 5 Concept 4 Restripe I-80 EB to I-580 SB on-ramp Concept 5 Widen Virginia St. WB off-ramp to two lanes

Widen E. McCarran Blvd. EB off-ramp Concept 6

Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7

Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts

Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.

Concept 10 Widen Rock Blvd. EB off-ramp

Concept 11 Widen Robb Dr. WB off-ramp

keeprenosparksmoving.com  Traffic alerts  Customize your Commute  Live cameras  Alternate routes  Construction info  Photos

I-80 ROBB DRIVE TO VISTA BOULEVARD LANDSCAPE & AESTHETICS

Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave. Robb Drive

Vista Boulevard Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave.

Tank Farm Screening

July 2011

August 2011

September 2011

Design will be completed by December, The westbound PCCP will be complete this year The eastbound PCCP work will begin spring, 2012 Overall project will be completed by December, 2012 Project Status

Questions? Thank you! Jeff Lerud, Project Manager