A1n Meeting R. Michaels, May 24-25, 2012 Welcome !! Recent Activity in Hall A Schedule for Early Beam in Hall A My task list for July 1 New Hall A leader,

Slides:



Advertisements
Similar presentations
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Advertisements

Low Q 2 Measurement of g 2 and the LT Spin Polarizability A. Camsonne, J. P. Chen Thomas Jefferson National Accelerator Facility Karl J. Slifer University.
Workshop on N* excitations at high Q 2 with CLAS12 Page 1 Workshop on N* Excitations at High Q 2 Welcome to Participants in the Workshop on Nucleon Resonance.
Hall A Status Hall A Collaboration Meeting June 9, 2011 Robert Michaels Acting Hall A Leader Recent Activity Publications (please write archival papers.
DVCS collaboration meeting, December 15-16, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
OPEN – FIN – INFO 2-42 June 13-14, 2013 OPEN – FIN – INFO 2-42 June 13-14, 2013 FY2015 Preliminary State Capital Appropriations Request and Campus Capital.
K. Slifer, UNH g2p & the LT Spin Polarizability for the E Collaboration E June 9, 2011.
Where is Williamsburg ? Williamsburg, Virginia A tourist destination for American history – Williamsburg was the capitol of Virginia at the time of the.
Thomas Jefferson National Accelerator Facility Secretary of Technology Page 1 Jefferson Lab Overview Deb Magaldi Public Affairs
Research at Jefferson Lab – K. A. Aniol, M.B. Epstein, D.J. Margaziotis What ? 1)Investigate the structure of nucleons and nuclei. 2)Determine at what.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Office of Research and Sponsored Programs William S. Messer, Jr., Ph.D. Vice President of Research.
Office of Science U.S. Department of Energy The Medium Energy Program Outline: Program Overview Some Recent Results FY 2008 Funding Summary.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Hall A Status Hall A Collaboration Meeting June 7-8, 2012 Robert Michaels Acting Hall A Leader for 3 more weeks, and then: new Hall A Leader Cynthia Keppel.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
SOLID: View from Hall A Robert Michaels, Acting Hall A Leader Issues to Discuss Schedule of Experiments Procedures to Decide Schedules Budget and Manpower.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
1 JLab Users Group Meeting May 29, GeV Program and Preparations PAC Status 4-Hall Running Experiment Readiness Reviews & Experiment Preparation.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
REAL BUDGETS IN THE EAST MIDLANDS Tuesday 8 th June 2010 Lawrence Suite Eastwood Hall Programme 6.00pm Registration & Buffet 6.30pm Welcome & Introduction.
Hall A Installation Review John J. LeRose 2/25/2009.
Hall A Status Hall A Collaboration Meeting Dec 15, 2011 Robert Michaels Acting Hall A Leader Recent Activity Future Projects Scheduling Process Publications.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Double spin asymmetry measurement from SANE-HMS data at Jefferson Lab Hoyoung Kang For SANE collaboration Seoul National University DIS /04/23.
Early Career Internal Review Research and development in superconducting detectors and associated electronics for high rates experiments. Study of radiation.
Thomas Jefferson National Accelerator Facility Page 1 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab September 22-24, 2009 Physics.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
Hall A collaboration meeting, December 3-5, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
GO Virginia Tuesday, July 19, 2016 Page 1. Who is the GO Virginia Coalition? Page 2.
Proton Form Factor Ratio GE/GM from Double Spin Asymmetry with
Collaboration Meeting
Spin Precession At CEBAF
Jefferson Lab Reliability Task Force and Initiatives
Alignment of the 12 GeV CEBAF Accelerator
HRS at small angles for e+/ e- pair for APEX
Jefferson Lab Hugh Montgomery Jefferson Lab UGBOD January 2015.
University of New Hampshire Nuclear & Particle Physics Group
View from Lab Management HPS Collaboration Meeting
CLAS12 Computing Review Discussion
Schedule Rolf Ent HPS Meeting, May 22, 2018.
PEPPo : Polarized Positron Production
BCM test in low current for g2p
StayTreat Wrap Up OPS 2015 StayTreat.
SOLID Collaboration Meeting
Hall A Collaboration Meeting
Presentation transcript:

A1n Meeting R. Michaels, May 24-25, 2012 Welcome !! Recent Activity in Hall A Schedule for Early Beam in Hall A My task list for July 1 New Hall A leader, Cynthia Keppel, starts July 1

New Beam Diagnostics (BPM,BCM,Harps,Tungsten Calo) Chicane Polarized TargetLocal Dump Septa g2p / Gep in Hall A Students: University of New Hampshire University of Virginia Toby BadmanChao Gu Ryan ZielinksiJie Lieu College of William and Mary Duke University Melissa CummingsMin Huang University of Science and Technology of China Hebrew University of Jerusalem Pengjia ZhuMoshe Friedman 60% of data collected, but no “septum-out” (higher Q 2 ) running

Early Beam in Hall A 16 mo. Shutdown Early Experiments 12 GeV Commissioning SuperBigbite Beam 1 st to Hall A Thomas Jefferson National Accelerator Facility Robert Michaels, Hall A FY 2015 FY 2013 FY 2016 FY 2014 FY 2017 SBS Experiments SBS Project APEX and/or PREX A1n / DVCS 11 GeV Dark MatterNeutron SkinNeutron Spin Structure Deeply Virtual Compton Scatt. EM Form Factors at high Q 2

My Task List to July 1 My job: ‘’Strawman’’ schedule for commissioning and early beam Corresponding “strawman” budget : Capital Equipment and Operations  Plans to be presented to C. Keppel, together with a list of what we “did do” and “did not do” in my term. For A1n Collaborating institutions, including Jefferson Lab, to discuss What are the needs for A1n ? What resources each institute will bring ? Please give me (at least preliminary) feedback by July 1