Demand Side Energy Management & Conservation Lighting Retrofits The University of Texas at Austin.

Slides:



Advertisements
Similar presentations
National Church Residences
Advertisements

UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
IAC / WVU Industrial Productivity Improvement Through Energy Efficiency & Waste Reduction By B. Gopalakrishnan, PhD, P.E., CEM Professor & Director Industrial.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Houghton College/NextEra Solar Array. Solar Array Details 2.5 MW system covering 11 acres 2.92 million kWh production (equivalent to powering 270 homes.
Performance Contracting The Honeywell One Source Solution.
Department of Facilities Management Maintenance & Operations.
PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
So much more than a lamp and ballast change out ENERGY SERVICES PEOPLE.PLANET.PROFIT.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
Local Government Case Study – Fairfax County Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) July 11, 2008.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
GREATER LAWRENCE SANITARY DISTRICT ENERGY EFFICIENCY PROGRAM.
STAFFORD COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT PROGRAM 2009 UPDATE Bob Randall CEM,,BEP, CBCP Energy Manager Energy Manager.
Green Building Demonstration Project Adam Saling City of San Diego.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Greening of Libraries. 39% of all energy use 12% of the total water consumption 68% of total energy consumption 38% of the carbon dioxide emissions Building.
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
December 2, 2008 Campus Lighting Retrofits University of Illinois at Urbana-Champaign in conjunction with ICECF Eva Sweeney, P.E., LC, LEED© AP ISTC Sustainability.
KITSAP COUNTY ENERGY EFFICIENCY Autumn Salamack, Resource Conservation Manager Board of County Commissioners Office.
Monterey Model: Strategies for an Efficient Public-Public Partnership Case Studies toward Success George Helms General Services Superintendent.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Green Tip $aving on waste & energy costs gives us more to spend on quality patient care.
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
Energy Efficiency Solutions: Reduce Costs, Improve Infrastructure, Meet Environmental Goals Case Study: Towson University.
Energy UHN. 2 Background –welcome to the University Health Network –UHN’s utility budget Energy UHN –strategy –procurement –conservation.
Lincoln GET REAL! Typical Annual Direct Energy Costs for Large New England Household ($ per year) For 12,000 kWh electricity, 168 MMBtu gas&oil, and 2.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Steven Lanou Deputy Director - Sustainability Program EHS Headquarters Office ehs.mit.edu/site/sustainability.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
CALCULATING PAYBACK PERIOD. Formula Payback Period = Initial Investment Net annual savings + Income.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Pamela A Dorton, PhD Candidate University of Wisconsin – Madison And TCF Intern, Department of Veterans Affairs (paper completed) May 2008 “…And we’re.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
0 OLD TECHNOLOGY NEW TECHNOLOGY ON THE RIGHT TRACK WITH ENERGY CONVSERVATION.
Status of CalCAP Implementation Judy Chess, UC Berkeley UC/CSU/CCC Sustainability Conference July 2008 August 1, 2008.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Enacting Sustainable Initiatives on Campus Plemmons Student Union Sustainability Initiatives Appalachian State University.
Association of Energy Engineers Randy Haines, CEM, CLEP, CMVP Energy Manager, Jefferson April 20, 2016.
Draft SMECO EmPOWER Plans April 15, 2011.
Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.
CalCAP Implementation at UC Berkeley Lisa McNeilly, UC Berkeley UC/CSU/CCC Sustainability Conference July 2008 August 2, 2008.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Calculating Payback Period
Wayne State University Facilities Planning & Management
Resource Conservation Manager
TCU and the Presidents Climate Commitment:
Presentation transcript:

Demand Side Energy Management & Conservation Lighting Retrofits The University of Texas at Austin

The University of Texas at Austin Founded in 1883 – some infrastructures more than 100 years old ~ 22 million gross square feet 427 acres of Main Campus acres at Pickle Research Campus ~50,000 students and ~20,000 faculty and staff University Profile 2

Energy Use and Production Generate our own electricity for main campus Purchase water and natural gas Estimated annual costs for FY 2009/10 greater than $38 million

4 Energy Use and Production

Main Campus Demand 5 Campus Use (MMBTU) Campus Use – Production (MMBTU) Focus on Electricity and Steam Reductions

Electric: Fixture, lamp & ballast replacement, occupancy sensors Water: Fixture replacement, aerators, flush valves, shower heads Steam: Steam trap & valve replacement or repair What We Accomplished – Lighting, Steam & Water 6 DSEMC Retrofit Projects

Conducted full inventory of 122 E&G buildings Utilized Federal Energy Management Program (FEMP) guidelines Developed project measurement and verification procedures Sampled existing conditions Measured performance factors (e.g., watts/fixture, gallons/flush) Estimated and verified savings at building level The Process Audit, Measurement & Verification 7

Lighting Project Renewed or replaced more than 200,000 lighting fixtures Installed 2,300 lighting occupancy sensors Recycled 471 tons of materials 8 Case Study Example

Lighting Project Energy Conserving Lighting Products 9 Ceiling Mounted Occupancy Sensor T12 Lamp (Top) vs. T8 Lamp (Bottom) Electronic Ballast Photo References Benefits $1.9 million per year in lighting savings 25 million KWh per year in electricity More than 21 million pounds of CO 2 E emissions avoided Lamps and ballasts warranties 39% reduction in project areas Electricity for 1,500 average homes Source: City of Austin

Lessons Learned 10

11 Lessons Learned Main Campus Production – Plant Input 1% MMBTU

Contractors Inspection and Coordination Management Project Manager Professional Services Provider WaterLightingSteam Project Coordinators Teams Implementation and Oversight Executive aCATcCATlCATsCATwCATuCAT 12 Lessons Learned Effective Communications Project Management Conservation Action Teams

Design Build – Very Effective Cautious use of energy “savings” as funding strategy Leverage for Auxiliary Organizations Communications as important as “savings” Lighting is an “emotional” issue Revisit Lighting Standards –Energy / Maintenance / Client Expectations –Are we “agile enough” for the technology Lessons Learned 13

Questions? 14