Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep. 2001 Global Trigger Global.

Slides:



Advertisements
Similar presentations
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Advertisements

Efficiency of the L1 Trigger for SUSY Study performed by L. Boldizsár, P. Hidas KFKI Budapest J. Erö, M. Fierro, A. Jeitler, N. Neumeister, P. Porth, H.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
The CMS Trigger.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Status of the CSC Track-Finder Darin Acosta University of Florida.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
CMS Week Mumbai, Dec Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menus.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Four Seas Conference Istanbul, 10 September 2004 Claudia-Elisabeth Wulz Institute for High Energy Physics, Vienna Fast Event Selection at CERN’s Large.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
CMS Week Mumbai, Dec Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menus.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
Hardware: Software:
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
L1 Global Muon Trigger Simulation Status URL of this presentation:
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Sridhara Dasu115 April 2002 L1CaloTrigger Algorithms Sridhara Dasu University of Wisconsin Algorithms: Details, Updates and Simulation - 2 x cm -2.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
HCAL Data Concentrator Production Status
CMS EMU TRIGGER ELECTRONICS
Jan Królikowski Warsaw University
Status of CMS and the Austrian Contribution to the Trigger System
Regional Cal. Trigger Milestone: Major Production Complete
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
The CMS Tracking Readout and Front End Driver Testing
Global Trigger and Global Muon Trigger
Sector Processor Status Report
The Trigger Control System of the CMS Level-1 Trigger
Plans for the 2004 CSC Beam Test
Global Muon Trigger Update
Presentation transcript:

Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global Muon Trigger

Annual Review, 24 Sept Claudia-Elisabeth Wulz2 URL’s This talk may be found at: More detailed transparencies prepared by H. Sakulin about the Global Muon Trigger may be found at: GMT-IntReview24Sep2001.pdf More detailed transparencies about the Global Trigger prepared by A. Taurok and presented at the Trigger Meeting on Tuesday, 25 Sep. 2001, may be found at: GT_GTM_status_Sept01.ppt General information about the Global Trigger and the Global Muon Trigger is available at:

Annual Review, 24 Sept Claudia-Elisabeth Wulz3 Global Trigger Environment

Annual Review, 24 Sept Claudia-Elisabeth Wulz4 Board Layout of the Global Trigger Processor PSB (Pipeline Synchronizing Buffer)Input synchronization GTL (Global Trigger Logic) Logic calculation FDL (Final Decision Logic) L1A decision TCS (Trigger Control System Module)Trigger Control NEW: L1A (Level-1 Accept Module)Delivery of L1A TIM (Timing Board)Timing GTFE (Global Trigger Frontend) Readout

Annual Review, 24 Sept Claudia-Elisabeth Wulz5 Global Trigger 9U Crate (old)

Annual Review, 24 Sept Claudia-Elisabeth Wulz6 Global Trigger 9U Crate

Annual Review, 24 Sept Claudia-Elisabeth Wulz7 Global Trigger Rack

Annual Review, 24 Sept Claudia-Elisabeth Wulz8 Global Trigger Progress and Milestones  Milestone March 2002: System Test This includes the backplane, the PSB-6U, GTL-6U, FDL-9U and TIM-9U. The GTFE and the GMT are not included. 4Backplane-6U: Prototype available 4PSB-6U: available. Channel Link receivers used. GTL-6U: Automatic chip design and setup procedure developed. Layout for a 20 channel GTL (4 , 4 isol. e/ , 4 central jets, 4 fwd jets,  E T, E T miss, 8 jet multiplicities; other quadruplets can be connected alternatively for tests) is currently being finished pin Altera FPGA 20k400E included for evaluation. The layout of a conversion board to be used later in final 9U-crate is ready. It contains also memories in FPGA’s to send simulated test data to the GTL-6U board. FDL-9U: Design with 8 final OR’s in progress. TIM-9U: The design of the board is nearly finished. The board contains a TTCrx chip and provides all timing signals for the GT crate. It will be used also in the Drift Tube Track Finder crates. An FPGA provides all necessary test functions to run the crate without the central TTC clock. It simulates also L1A requests for monitoring or to test the readout chain.

Annual Review, 24 Sept Claudia-Elisabeth Wulz9 Global Trigger Progress and Milestones  Milestone July 2002: TCS-9U ready TCS-9U: The main functions are defined but the design is still open for additional requests (calibration logic etc.) Trigger Partitions: The maximum number of subsystems is fixed (32). A preliminary agreement about the output to the DAQ Event Manager is has been reached. The input format of Fast Signals should be fixed soon. 5 coded bits per subsystem, sent as parallel data, are proposed. The TCS board provides data for the standard TTCvi as well as for a ”CMS- TTCvi”, but different interface boards are required. L1A driver module to be used with CMS-TTCvi has been conceived.

Annual Review, 24 Sept Claudia-Elisabeth Wulz10 Global Trigger Progress and Milestones  Milestone October 2002: 9U backplane ready The design with the GTLp 80 MHz and Channel Links is in progress.  Milestone June 2003: Complete GT prototype available Integration tests possible from this date. GTFE-9U: Conceptual design of readout board done.  Milestone July 2004: 12-channel PSB-9U available PSB-9U: Conceptual design done. Will have memories inside FPGA’s.  Milestone Nov. 2004: Complete GT available Includes GTL-9U module with all 32 input channels (4 , 4 isol. e/ , 4 non-isol. e/ , 4 central jets, 4 forward jets, 4  -jets,  E T, E T miss, 8 jet multiplicities). The Global Muon Trigger will have been completed by Nov

Annual Review, 24 Sept Claudia-Elisabeth Wulz11 Global Muon Trigger RPC CaloTrigger DTBXCSC PACT Pattern Comparator TRACO Track Correlator Trigger Server DT Barrel Track Finder Wire cards Strip cards Motherboard CSC Endcap Track Finder DT Sorter CSC Sorter RPC Sorter CAL Readout Regional CALO Trigger GLOBAL MUON TRIGGER GLOBAL L1 TRIGGER GLOBAL CALORIMETER TRIGGER 4+4  4  MIP & quiet bits (2x 252) HEPHY Vienna BolognaRice Florida BariBristol BTI Bunch & Time ID Warsaw Wisconsin L1 Accept ………… max. 100 kHz Pipe- lined 40 MHz

Annual Review, 24 Sept Claudia-Elisabeth Wulz12 Tasks and Location of the Global Muon Trigger  Receive Muon Candidates from DT, CSC and RPC  Triggers  Find the best 4 muons in the detector  Make use of the complementarity of the muon trigger  systems (DT/RPC barrel, CSC/RPC endcap)  increase efficiency  reduce ghosts  reduce trigger rate by improving p T assignment  Add MIP and Quiet bits from the calorimeter trigger  Forward best 4 muons to the Global L1 Trigger  GMT is located in the GT crate. It consists of 3 input boards (PSB) for the calorimeter information and 1 logic board. 3 additional slots used due to connectors.

Annual Review, 24 Sept Claudia-Elisabeth Wulz13 Principle of the Global Muon Trigger Inputs: 8 bit , 6 bit , 5 bit p T, 1 bit charge, 3 bit quality Output: 8 bit , 6 bit , 5 bit p T, 1 bit charge, 3 bit quality, 1 bit MIP, 1 bit Isolation Further Inputs: MIP and Quiet Bits of 252 calorimeter regions Responsible: H. Sakulin, A. Taurok, C.-E. Wulz 3 programmable merging modes: winner/loser parameter selection parameter mixing

Annual Review, 24 Sept Claudia-Elisabeth Wulz14 Global Muon Trigger Schedule  Milestones / Plans:  2001Logic design, ORCA + VHDL Simulation Dec 2001 Logic design finished  2002VHDL Simulation, Design of FPGA chips Dec 2002FPGA design finished  2003 Production of VME 9U Boards  2004/05 Integration tests, production of spare boards 

Annual Review, 24 Sept Claudia-Elisabeth Wulz15 Progress towards GMT milestones  Dec 2001: Logic design finished Progress in detailed logic design Chip Models selected (mostly Virtex II), interconnections defined Design compacted (external RAMs moved into big FPGAs) Improvement of functionality DT/CSC cancel-out unit (improved performance in barrel/endcap overlap region) in parallel: ORCA simulation extended and improved Continuous studies to optimize GMT design parameters and performance –CMS Note 2001/003 published: H. Sakulin, M. Fierro, “Studies of the Global Muon Trigger Performance”  Detailed GMT design document in preparation  VHDL behavioral level simulation has started  Dec 2002: FPGA design finished FPGA models have been selected  Synthesis tools are being evaluated

Annual Review, 24 Sept Claudia-Elisabeth Wulz16 New: GMT solution with 1 logic board

Annual Review, 24 Sept Claudia-Elisabeth Wulz17 Simulation - muon 2001 production

Annual Review, 24 Sept Claudia-Elisabeth Wulz18 Simulation - muon 2001 production  GMT optimized as in ORCA  rate at 20 GeV/c: 3.1 kHz  L1 efficiency (*) : 96.6 %  re-tuned GMT selection:  Only three-station CSC tracks used without RPC confirmation  rate at 20 GeV/c: 1.4 kHz  L1 efficiency (*) : 96.3 % (*) efficiency to find muon of any p T in flat p T sample Rate from unconfirmed 2-station CSC tracks  GMT single muon trigger rates (p T > 16 GeV/c) ORCA re-tuned GMT

Annual Review, 24 Sept Claudia-Elisabeth Wulz19 L1 efficiency with retuned GMT GMT efficiency to find any muon in a flat p T sample as in ORCA w/o RPC noise ORCA eff= 96.6% re-tunedeff= 96.3 % Efficiency contribution from CSC Q2 muons (lost with re-tuning) Efficiency/%

Annual Review, 24 Sept Claudia-Elisabeth Wulz20 Single muon rates  Trigger rate at 20 GeV/c (re-tuned GMT)  1.4 kHz (last year: 2.9 kHz)  Generated rate at 20 GeV/c  ~120 Hz (last year: ~200 Hz)

Annual Review, 24 Sept Claudia-Elisabeth Wulz21 Dimuon rates

Annual Review, 24 Sept Claudia-Elisabeth Wulz22 Single muon and dimuon trigger rates

Annual Review, 24 Sept Claudia-Elisabeth Wulz23 GT and GMT Manpower  System Engineer: A. Taurok  CERN Doctoral Student: H. Sakulin (Logic and Hardware Design of GMT)  Technicians: (shared with DTTF and other activities) H. Bergauer, M. Padrta, K. Kastner (in Vienna) Ch. Deldicque (at CERN)  Physicists: M. Fierro, A. Jeitler, C.-E. Wulz (mainly working on GT/GMT) N. Neumeister, P. Porth, H. Rohringer, L. Rurua (partly working on other activities) L. Boldizsar (GT simulation, about 4 months per year in 2001 and 2002)

Annual Review, 24 Sept Claudia-Elisabeth Wulz24 Conclusions  Progress in hardware design as planned  Global Trigger: Layout of GTL-6U almost ready Timing module designed Other modules also on track Design of TCS system updated  Global Muon Trigger: FPGA chips selected Design compacted New solution with one logic board VHDL simulation has started

Annual Review, 24 Sept Claudia-Elisabeth Wulz25 Conclusions  New simulation results with muon 2001 production for Global Muon Trigger  p T -cut was lower than in last year’s production  improved CSC trigger & GMT can cope with higher background rate  trigger rates with improved trigger are lower despite higher background (even after taking into account the changed sample normalization)