Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Preliminary Design of FONT4 Digital ILC Feedback System Hamid Dabiri khah Queen Mary, University of London 30/05/2005.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen White (Queen Mary, University of London) Alexander Kalinin (Daresbury Lab.) Colin Perry (Oxford) Doug McCormick, Marc Ross (SLAC)

Philip Burrows ATF 15/03/05 General Strategy March 2005: Commission final version of superfast processor + jitter monitor June 2005: FONT3 closed-loop feedback tests with new amplifier During 2005: Develop prototype for FONT4 digital feedback system for ILC bunch spacing December 2005: First commissioning studies with prototype digital system March 2006: Possible first feedback tests with digital system + 3 ILC bunches

Philip Burrows ATF 15/03/05 FONT3 experiment outline Adjustable-gap kicker BPM ML11X Feedbac k Superfast BPM processor Superfast amplifier BPM ML12X BPM ML13X Aim: TOTAL latency < 20 ns

Philip Burrows ATF 15/03/05 FONT3: ATF beamline configuration kicker BPM ML11X

Philip Burrows ATF 15/03/05 FONT3 beam requirements 20-bunch train (56 ns) essential in order to see action of delay loop Uniform charge within train (better than +- 10%) essential since no time for charge normalisation Flat bunch-bunch vertical position profile within train desirable Small bunch-bunch vertical position jitter within train (few microns) essential Small train-train vertical jitter (c. ten microns) essential to avoid amplifier saturation (c. 50 microns)

Philip Burrows ATF 15/03/05 FONT3 jitter monitor Aim to measure bunch-bunch jitter at micron level First tests June 2004: bunches resolved, but position resolution > 10 microns (common-mode rejection issues) Improved processors tested December 2004 (BPMs 8, 10, 13) + 2 BPMs in ring + March 2005

Philip Burrows ATF 15/03/05 y position jitter correlation: extraction line - ring (FONT shift December 2004: 40 sequential 20-bunch trains) Offers possibility for jitter correction by feed forward from ring to extraction line ATF2 demands micron-level position stability at entrance to final focus

Philip Burrows ATF 15/03/05 Jitter Monitor Tuesday shift – 8/9 March 2005 (single bunch) –Measured delays between sum and difference signals using new synchronisation circuit, for BPMs 26 and 27 in ring and BPMs 8 and 13 in extraction. –BPM26 delay = -208 ps –BPM27 delay = 90 ps –BPM8 delay = 430 ps –BPM13 delay = -384 ps

Philip Burrows ATF 15/03/05 Calibration measurement for BPM26&27 –BPM 26 – –BPM 27 – Calibration for BPMs

Philip Burrows ATF 15/03/05 Friday shift – 12 Mar Multibunch mode –3 BPMs in Extraction line – BPMS 8,10,13 –Synchronisation data for BPM10 –Calibration data for all three BPMs Single Bunch mode –Exchanged BPM 10 in extraction line for BPM26 in ring –Took data to study correlation between jitter in ring and extraction line.

Philip Burrows ATF 15/03/05 Multi-Bunch Calibration ML8X ML10X ML13X 1712±111 V/m 2374±24 V/m 2104±20 V/m

Philip Burrows ATF 15/03/05 Multi-Bunch Resolution Residuals from fitted position at ML10X based on ML8X and ML13X for 100 consecutive pulses (at 0.7 Hz). Estimate of jitter at ML10X -> 3.1 um.