EVLA Corr Racks/Cables etc. B. Carlson EVLA Correlator F2F Meeting Dec. 11-12, 2007.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

NetSure™ RDB Series.
Hale Carlson Baumgartner, PLC Conference Room Technology.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Pre-OTS Tests Penticton—H/W B. Carlson EVLA Correlator F2F Meeting Dec , 2007.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
An Introduction and Training Module. Vitalinq Introduction  Vis-A-Vis (pronounced “ vee-sah-vee ”) established in 1986  Intercom and music system designed.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Network Topologies.
ZTF Interconnecting Scheme Stephen Kaye
Programmer’s Guide to the EVLA Correlator B. Carlson EVLA Correlator S/W F2F Apr. 3-4, 2006.
Lab 3 page 1 ENT-DIGI-210 Lab 3 Notes ©Paul Godin Updated September 2007.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Technology and Functionality of the EVLA Correlator (Next Corr Workshop, June 27, 2006)
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Tracker Summary Alan Bross MICE CM October 10, 2007.
Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada The WIDAR Correlator.
EVLA Correlator Prototype and OTS Testing B. Carlson EVLA Correlator S/W F2F Apr 3-4, 2006.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Configuration Mapper Sonja Vrcic Socorro,
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
Lesson learned after our recent cooling problem Michele Onofri, Stefano Zani, Andrea Chierici HEPiX Spring 2014.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Overview of New Connectivity Scheme for the EVLA Correlator B. Carlson July 31, 2007.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
(612) Slide No: 1 RDM CONFIDENTIAL Intuitive Circuit controller PR0650 CCT.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
West Cambridge Data Centre Ian Tasker Information Services.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
Future LBO Developments
Action Items List at PM#7
Data Examination and Checking Programs--Requirements B. Carlson
Software Overview Sonja Vrcic
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
AM system Status & Racks/crates issues
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
EVLA Correlator F2F Meeting Dec , 2007
EVLA Prototype Correlator (PTC)
EVLA Correlator New Connectivity Scheme Software Impact Sonja Vrcic
PTC Setup at VLA B. Carlson
Antenna Monitor & Control Subsystem Engineering Requirements
Rick Perley National Radio Astronomy Observatory
EVLA Monitor & Control System
IRC5C second generation Overview
Progress on EXPreS at JBO Ralph Spencer
Correlator Growth Path
RPC FEE The discriminator boards TDC boards Cost schedule.
VLA EXPANSION PROJECT Correlator Issues.
Presentation transcript:

EVLA Corr Racks/Cables etc. B. Carlson EVLA Correlator F2F Meeting Dec , 2007

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables2 Outline Rack assembly. Meritec cable assembly/installation. Rack shipping/installation. Control Racks. Ethernet cables. VLBI recorder rack.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables3 Rack Assembly Currently in progress in Penticton. Have all sub-racks, fan assemblies. Layout “scoped-out” (baseline plan in A25017N0005), but refinements occurring as we assemble the first 2 racks. Waiting for some parts: –Common Backplanes. –Last minute electro/mechanical parts (switch mounting plate, RPMIB…) But, should be in full-swing assembly ~1 st week January. –Full time contract assembler going since mid Sept. –1 temp worker started, another one shortly…add more EVLA/DRAO techs as needed to meet schedule.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables4 Rack Assembly Plan is to fully assemble racks in Penticton, to minimize site work. (I) need to develop QA checklist and test plan. –Early rack delivery does not permit fully loaded/powered test. –Have tested thermal mock-up to 10 kW successfully. –If there is a thermal problem, the only fall-back position is colder air (rack-mount chiller at bottom). –…the die is cast! 2 shipments: 8 racks each, to mitigate effects of shipping catastrophic failure. –Direct shipment in dedicated shipping crates from Penticton to VLA.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables5 Rack Cables All cables colour coded: –-48 VDC hot: VIOLET; RETURN: BLACK. –Board power control: WHITE; monitor: YELLOW. –Ethernet M&C BLUE; CBE RED; Phased output: YELLOW. –Fan power, M&C. All cables labeled (except for –48 VDC power)

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables6

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables7

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables8

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables9

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables10

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables11

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables12

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables13

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables14 Meritec Cables All ordered, Meritec is maintaining Dec. 28/07 delivery date. “st-TC”, Station rack, rack-to-rack installation plans ready (A25005N0004, A25005N0003, A25005N0001). PVC labels being made…gearing up for labeling and assembly of rack-to-rack cables.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables15 “st-TC” Cable Install “st-TC”: augmented “NRAO ext-TC” signal with “hop count”. Distribute to all Station racks and Station Boards in a daisy- chained, bi-directional fashion. –Eliminates single board or rack failure from affecting other boards/racks. –Hop count incremented with each hop…compensate for delays in Station Board Timing Chip so that signals going to the Baseline Boards are approximately lined-up in time. –Station Board develops final absolute TIMECODE.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables16

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables17

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables18

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables19

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables20

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables21 Station rack Meritec Cables Route from Station Board center connector to X-bar Boards. –All installation is done in Penticton. Split quad wafer at Station Board end allows for 4 stations on one quad wafer at X-bar Board end. X-bar Board does quadrant switching to allow full resource flexibility. Antenna fiber (IFs/BBs)-to-Station Board routing now established (ICD A25010N0002).

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables22

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables23

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables24

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables25

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables26

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables27 Rack-to-rack Meritec Cables Described in detail in document A25005N cables assembled into 128, 4-cable “sets” in Penticton. –Nice cable set bundling solution using split-expando with heatshrink termination. All cable sets labeled and kitted…ready for install. –Each cable is labeled, with source/destination, but also with unique number.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables28

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables29

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables30

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables31

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables32 Rack Shipping/Installation Several possible scenarios…depends on desire to get H/W to the site ASAP. Anticipate all racks assembled and ready by end of April, possibly sooner. Ship in 2, 8-rack shipments. –Doors and side panels ship directly to VLA…not needed in Penticton. Each rack labeled with its rack number (e.g. S001). Has specific place in room where it is installed. Fan tray assemblies must be attached once in room…due to elevator height limitations.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables33 Control Racks Description in A25026N0000. Dual 1+1 redundancy. Contains CPCC, MCCC, boot servers, switch. 19” COTS racks, all COTS components/computers. CPCC: rack-mount PC or CompactPCI. –My vote is rack-mount PC…generic, easily replaced.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables34

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables35

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables36

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables37 Control Racks 100-pin RPMIB “SCSI” cables are unbroken from CPCC/NI6509 card to RPMIBs in racks. Custom cables…custom lengths. 2 cables per rack. Need final overhead tray configuration so final lengths can be determined and these cables can be ordered. Preliminary spreadsheet ready, based on the following diagram. –Qtys/lengths: 8x12.9 m; 8x12 m; 4x11.3 m; 4x10.5 m; 4x9.7 m; 4x9 m –32 in total for EVLA; 2 for eMERLIN (15 ft)

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables38

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables39 Ethernet Cables All cables are cat6 solid, UTP. All cables broken out at top-front of rack with ~3 ft leader, and cat6 RJ-45 couplers. –Station rack: 4 x BLUE M&C cables out the top…all into Control Rack switches. –Baseline rack: 2 x M&C BLUE; 16 x CBE RED; 16 x VLBI YELLOW out the top. BLUE into Control Rack switches; RED into CBE switch; YELLOW into VLBI switch. Rack-to-Control Rack, CBE, Ethernet cables can be built on-site, or sized and built in Penticton, once all rack and tray locations known. –Add another 5 ft of cable for margin, if pre-built.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables40 VLBI Recorder Rack Location in room doesn’t matter for rack assembly. Each B-rack breaks out a cat6 cable for 1 GigE from each B- board. For full phasing/selection flexibility, route all 128 cables into 1 GigE/10 GigE switch…software then turns on BB data sources for those sub-bands that are to be recorded. –This allows expansion to full 16 GHz phasing capacity. NRC provides access to cat6 signals at top of rack. NRAO provides cabling, switch, VLBI recording equipment.

B. Carlson, 2007-Dec EVLA Correlator F2F Meeting - Racks, Cables41 Summary Rack assembly. Meritec cable assembly/installation. Rack shipping/installation. Control Racks. Ethernet cables. VLBI recorder rack.