T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network.

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
PLC Based Interlock systems Workshop 4-5 December ITER Organization Headquarters - St Paul-lez-Durance-France ITER Central Interlock System: Central.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Overview 1 Overview Heinz-Dieter Nuhn, SLAC / LCLS June 19, 2008 Introduction Workshop.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
Terri Lahey LCLS Facility Advisory Committee 20 April 2006 LCLS Network Security Terri Lahey.
Terri Lahey LCLS FAC: Update on Security Issues 12 Nov 2008 SLAC National Accelerator Laboratory 1 Update on Security Issues LCLS.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Designing and Implementing Cabling Infrastructure Dr. Saif al Zahir King Fahd University of Petroleum & Minerals Computer Engineering Department Dr. Saif.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
How To Achieve a Wireless Internet Connection Without a Wireless Network Card Jose Mendez March 6, 2010 ENGL 393.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Terri Lahey EPICS Collaboration Meeting June June 2006 LCLS Network & Support Planning Terri Lahey.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Ferndale Electric Company Project overview from September 2007 to present.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
0 If you have set-up the equipment and are unable to access your service, call 1(888)ONE-ATT0/1(888) or for
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Site Construction & Installation Services
CCNA1 v3 Module 5 v3 CCNA 1 Module 5 JEOPARDY K. Martin Galo Valencia.
CCNA1 v3 Module 5 v3 CCNA 1 Module 5 JEOPARDY S Dow.
Terri Lahey Control System Cyber-Security Workshop October 14, SLAC Controls Security Overview Introduction SLAC has multiple.
Connectivity Devices. Network Interface Card (NIC) Allow user to connect to networks via Ethernet cable or Wi-Fi Nowadays integrally fitted into the.
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
Communications & Computer Networks Resource Notes - Network Hardware
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
NETWORKING COMPONENTS lLTEC 4550 JGuadalupe. HUB -THIS IS A HARDWARE DEVICE THAT IS USED TO NETWORK MULTIPLE COMPUTERS TOGETHER. IT IS A CENTRAL CONNECTION.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Network Topologies By: Josh Geller. Star Topology All computers are connected to a central hub. Cheap to expand as hubs are currently inexpensive. No.
NETWORKING MEDIA b Shielded twisted-pair - 2 pair, 150 ohm b unshielded-twisted pair - 4 pair, 100 ohm b fiber optic cable - 2 fibers b coaxial cable -
Network Components and terms. Hub is a device for connection multiple ethernet devices together and making then act as a single network segment.
Integrated Control System IT Infrastructure decisions, issues & progress TAC 12 Remy Mudingay ESS/ICS Date:
Performing Troubleshooting Tasks with Response Point Response Point Troubleshooting Scenarios Joe Schurman Founder, Executive Director Evangelyze Communications,
ESS Integrated Control System Software Core Components S.Gysin
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Use appropriate tools for network cabling and connections. Objective – 2%
Router Set Up Instruction
Cryoplant Controls Installation
Power Monitoring – Requirements (1)
Designing and Installing a Network
Basic Computer Networking at the Toolik Field Station
Engineering Technology Division
LCLS Undulator Undulator Controls Integration Network Status April 29, 2008.
XFEL Vacuum System Commissioning
Essentials of Networking
Laboratoires & Matériels WiFi
Undulator System Installation
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Структурно каблирање Систематски приступ каблирању
LTU/Undulator Installation Status
Communications & Computer Networks Resource Notes - Network Hardware
Cabling Charles Warren.
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network Status Controls (1300 hrs, Redwood Rm A/B)

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 2 Agenda Accelerator Network Infrastructure supports I&C Ethernet and MPS Design Overview Cable Plant Davis Bacon Phase IV & Phase V Contracts Fiber Termination Contract Integrating with other networks: Alignment Diagnostics System Network: G. Gassner Conventional Facilities: J. Sevilla Photon Sections: G. Haller SLAC Scientific Computing and Computing Services (SCCS) centralized networking groups are helping with all networks

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 3 Network Design Accelerator Switches reside in service buildings 913 and 921 to reduce heatload B913: UIR 1-15 B921: UIR cat6 cables to each UIR: CA ethernet, power reset, console port Cat6 longhauls between service building patch panels and cat6 boxes at racks 4 walkup stations: one each COW and wireless Other IOCs are located in service buildings: MPS, BPM, etc. Fiber Trunks support ethernet switches and MPS

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 4 Davis Bacon & Fiber Contracts Phase IV: install and test cat6 longhauls LNET14 is UIR cables Phase V: fiber pull Fiber Termination Contract: terminate and test fibers

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 5 Phase IV Cable Plant Schedule

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 6

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 7 Activate Connections Commission Switches Install jumper cables