1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.

Slides:



Advertisements
Similar presentations
Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
Advertisements

The Cohesion Fund: Programming and link to the Structural Funds Annual Meeting of ISPA Partners 2003: From ISPA to Cohesion Fund and Structural Funds Angela.
EU-Regional Policy and Cohesion Structural Funds and Accession 1 ANNUAL MEETING OF ISPA PARTNERS 2003 FROM ISPA TO COHESION AND STRUCTURAL FUNDS BRUSSELS,
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Sectoral Operational Programme for Environmental Infrastructure Ministry of Environment and Water Management.
„Extension and modernization of water and wastewater infrastructure in Arad County”
   EBRD - Water Project Identification, Financing Approach and Donor Coordination in Central and Eastern Europe European Bank for Reconstruction and.
1 MINISTRY OF AGRICULTURE AND FOOD Rural Development Policy
STARTING NEGOTIATIONS – THE EXPERIENCE OF BULGARIA 7 November 2005 ZAGREB Vladimir Kissiov.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Preparation of Bulgaria for future use of EU Structural Instruments Lyubomir Datzov Deputy Minister of Finance.
Institutional framework for supporting civil society development in Croatia A PLAN C FOR EUROPE: CITIZENSHIP, CIVIC ENGAGEMENT, CIVIL DIALOGUE 17 September.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
ANNUAL REPORT ON THE ABSORPTION OF THE EU FUNDS IN THE REPUBLIC OF BULGARIA IN 2010 MONIKA PANAYOTOVA, CHAIRWOMAN OF THE COMMITTEE ON EUROPEAN AFFAIRS.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Ministry of the Environment and Spatial Planning, Ljubljana, 16 November '07 Breda Mulec, PhD Head of Department Section of legal affairs European Affairs.
9 th NSRF Monitoring Committee meeting, 11 December 2014 EUROPEAN UNION EUROPEAN REGIONAL DEVELOPMENT FUND Investing in Your Future Operational Programme.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
1 MOBILIZING EU FUNDS Lessons Learned in a Pre-Accession Country Hachemi Bahloul, UNDP Bulgaria.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
Croatian Experience with Management of EU Funds Nataša Mikuš, Deputy State Secretary Central Office for Development Strategy and Coordination of EU Funds.
Infrastructure Projects Facility Regional meeting for Senior Officials from SEE and Donor’s Community Brussels 28 November 2008 Rachele Gianfranchi.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Financial assistance to environment - outside the EU Brussels, 28 th May 2009 World Bank event Joanna Fiedler European Commission DG Environment.
PHARE TWINNING CONTRACT BG/2004/IB/TR/02/UE Strengthening the capacity of the Ministry of Transport to manage the Sectoral Operational Programme on Transport.
NATIONAL ASSOCIATION OF MUNICIPALITIES IN THE REPUBLIC OF BULGARIA.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
KAJ MORTENSEN, HEAD OF SAPARD UNIT, DG AGRI EUROPEAN COMMISSION Pre-accession Assistance for Rural Development.
E nvironmental Protection in Bulgaria facts and challenges Workshop on : “Protection of the environment: climate change, pollution and biodiversity” Sofia,
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
JASPERS for CEF Stéphane OUAKI Head Of Unit
Experience of Accessing EU Financial Support in Lithuania 4th PG Funding Meeting , Paris.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
Structural Funds in Ireland Structural Funds in Ireland Financial management, Financial management, control & audit - Ireland Dermot Byrne Head of Unit.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
1 Summary of IPA Component II cross-border priorities in SEE Countries REReP regional meeting on “Energy and climate” in South Eastern Europe May
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
ROUND TABLE “Exchanging Experience in Absorption of the European Funds: Perspectives for Bulgaria and Poland” 1 April 2011, Sofia Tomislav Donchev Minister.
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
PRE-ACCESSION PROJECT IMPLEMENTATION IN CROATIA
Day 1 Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural Instruments.
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
NSRF and National Development Planning in Greece
Presentation by: Marios Miltiadou Greek Ministry of Transport
COHESION FUND MONITORING COMMITTEE
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
Bulgaria – Country Report
EU-Funding in New Member States
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION FUND (1164/94) / ISPA PROGRAMME OF THE EUROPEAN UNION

2 ISPA PROGRAMME - DEFINITION   Instrument for Structural Policies for Pre-accession for the 10 candidate- countries from Central and Eastern Europe for the period 2000 –   Along with PHARE and SAPARD programmes, ISPA is part of the mechanisms for financial assistance of the EU concerning the preparation of the candidate-countries for accession.

3 TERITORIAL SCOPE

4 ISPA PROGRAMME MAIN OBJECTIVES   Preparation of the candidate-countries for accession   To get the candidate-countries acquainted with the regional policy and procedures of the European Union regarding the Cohesion Fund and the other Structural Funds   To harmonize Bulgarian legislation in compliance with the EU Directives on environment protection   Development of the National transport infrastructure and access to the trans- European transport network

5 ELIGIBLE PROJECTS UNDER ISPA PROGRAMME   Large infrastructure projects – over 5 million Euro   Environmental or Transport Projects (including phases or groups of projects)   Balance between the Environmental sector and the Transport sector

6 FINANCIAL RESOURCES   For the 10 candidate-countries - 1 billion Euro annually   For Bulgaria – % annually amounting to million Euro for both sectors   For Bulgaria – total amount envisaged for each sector for the period of 7 years million Euro   Basis for determining the financial quota for each country: Population GDP per capita Total area Assessment of the countries with the greatest needs

7 MAIN PARTICIPANTS IN THE MANAGEMENT PROCESS OF ISPA PROGRAMME   The European Commission   DG “Regional policy”,   DG “Enlargement”   DG “Environment”,   The EU Member-states   The EC Delegation – Sofia   Countries in the process of EU accession   National ISPA Coordinator   Paying Authority – National Fund Directorate in the Ministry of Finance   ISPA Implementing Agencies

8 ISPA IN BULGARIA National ISPA Coordinator 4 Implementing Agencies Minister of Finance ISPA Monitoring Committee Joint Management Committee for PHARE, ISPA and SAPARD National Coordination Unit In the Ministry of Finance National Fund directorate Ministry of Finance Ministry of Transport Ministry of Environment and Water MRDPW Agency “Road Infrastructure” Individual Projects National Authorizing Officer European Commission DG Regional Policy

9 ISPA IMPEMENTING AGENCIES   Assigned teams from the Bulgarian public administration, responsible for:   Technical execution of ISPA Projects,   Preparation and implementing of Public Procurement,   Awards of Contracts,   Making payments to Contractors.   “National Fund” Directorate – MF and each ISPA Implementing Agency sign Financial Agreement   Financial Agreement determines rules and procedures for the relationship between Bulgarian teams for management of funds under Cohesion fund (1164) / ISPA Programme.

10 ISPA PROGRAMMING PROCESS   National Economic Development Plan until 2007   Preparation of ISPA National Strategies – for Environment and Transport sectors   Identification of the most priority projects for Republic of Bulgaria   Presentation and justification of the proposed projects in front of the European Commission – DG Regional Policy

11 ISPA MANAGEMENT PROCESS MAIN STAGES   Application for ISPA Grant   Selection of Projects   ISPA Management Committee   Signing of Financing Memorandum   Procurement Procedures – Open International Tenders   Awards of Contracts – Works and Supervision   Project implementation   Monitoring and control   Ex-post assessment and evaluation of results

12 PRIORITIES IN ENVIRONMENT SECTOR   Compliance with principles and objectives of EU Environment Policy   Decrease of the risk for human health   Limitation of the impact on unstable ecosystems   Permanent and rationale use of natural resources   Prevention measures for protection of the environment – in compliance with the “Polluter pays” principle   Identification and elimination of the contamination from the source

13 ISPA MEASURE 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT FOR BOURGAS – EXAMPLE FOR SUCCESFULLY COMPLETED ISPA PROJECT

14 SIGNING OF THE FINANCING MEMORANDUM JANUARY 2006 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS

15 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS WASTE WATER TREATMENT PLANT – BOURGAS BEFORE THE START OF THE PROJECT

16 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS SEWERAGE SYSTEM IN “POBEDA” QUARTER BEFORE THE START OF THE PROJECT SEWERAGE SYSTEM IN “POBEDA” QUARTER BEFORE THE START OF THE PROJECT

17 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Signing of Works Contracts for Lot 1 and Lot 2 July 2007

18 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Signing of Contracts for Construction Supervision for Lot 1 и lot 2 November 2007

19 Construction of new Water Transmission Main from Lozovo reservoir to hotel Mirage ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS

20 Construction of new Water Transmission Main from Lozovo reservoir to hotel Mirage July 2008 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS

21 Official Opening Ceremony Construction of new Water Transmission Main from Lozovo reservoir to hotel Mirage - COMPLETED ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS 28 July 2008

22 Groundbreaking Ceremony - December ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Lot 1 and Lot 2 Rehabilitation and Extension of the Inner Water supply and Sewerage System in Bourgas

23 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Lot 1 Pipe laying on “Tsar Simeon I” Street June 2009

24 “Tsar Simeon I” Street - Completed October 2009 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS

25 August 2009 Crossing of channel “Vaya – Black Sea” ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS November 2009 completed

26 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Drinking water Reservoir “Izgrev” - COMPLETED Lot 1 January 2010

27 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Lot 2 Lot 2 Rehabilitation and Extension of the Sewerage Network in Bourgas

28 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Lot 2 – COMPLETED December 2009 Sewerage system “Pobeda” Quarter

29 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Up-grading of the Waste Water Treatment Plant - Bourgas

30 ISPA Measure 2005/BG/16/P/PE/003 INTEGRATED WATER PROJECT BOURGAS Up-grading of the Waste Water Treatment Plant – Bourgas – COMPLETED August 2009

31 Integrated Water Project for the Town of Bourgas Physical and Financial execution by 31 December 2010 within the validity of the Financing Memorandum