Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Continuous Value Enhancement Process
Establish Verification Procedures (Task 11 / Principle 6)
Systems Engineering in a System of Systems Context
Systems Analysis and Design 9th Edition
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
SOFIA Stratospheric Observatory for Infrared Astronomy DCS PDR at RIT3/7/2000 DCS Preliminary Design Review Sean C. Casey USRA Senior Scientist Lead Scientist.
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Protection Against Occupational Exposure
SEEA Experimental Ecosystem Accounts: A Proposed Outline and Road Map Sixth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
Codex Guidelines for the Application of HACCP
Justice Information Network Strategic Plan Development Justice Information Network Board March 18, 2008 Mo West, JIN Program Manager.
October 2005ALMA Cost Review1 Atacama Large Millimeter Array Science IPT Review Bilateral Project Scientists: Al Wootten, (Lead) Tom Wilson, (Deputy) Ryohei.
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
United Nations Statistics Division
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
1 Framework Programme 7 Guide for Applicants
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
System Planning- Preliminary investigation
ALMA Operations and the North American ALMA Science Center Al Wootten NRAO.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
06/10/2006IRAM Interferometry School1 ARC node at IRAM F.Gueth – IRAM Grenoble.
Polarization at IRAM Status and Plans S.Guilloteau Laboratoire d’Astrophysique de Bordeaux.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
S14: Analytical Review and Audit Approaches. Session Objectives To define analytical review To define analytical review To explain commonly used analytical.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
Office of Science U.S. Department of Energy DETF Recommendations I 2.1Science (Charge questions 1, 2, 7) Andy Albrecht & Nicholas Suntzeff 2.1.2Comments.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
CMSC 345 Fall 2000 Requirements Overview. Work with customers to elicit requirements by asking questions, demonstrating similar systems, developing prototypes,
Status of Computing at PDR B.E. Glendenning (NRAO), G. Raffi (ESO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
ALMA Week 2003 Victoria, B. C. Phase Calibration Al Wootten (based on work by many)
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Kathy Corbiere Service Delivery and Performance Commission
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Analytical Review and Audit Approaches
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
The ESA call for the 9 th Earth Explorer mission (EE9)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
(Additional materials)
CLINICAL INFORMATION SYSTEM
Introduction to Projects
VLA to EVLA Transition Plan
ASAC Charge 4 September 2004 Consider in more detail how the choice of objects for demonstration science with ALMA might be made and in particular how.
Observatory Science Operations
Atacama Large Millimeter Array Science IPT Review
Observatory Science Operations
Presentation transcript:

Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT

Response to ASAC Report of May Stability Specifications The ASAC is requested to consider the following topics, and make appropriate recommendations to the Board: 1. Critically evaluate the specifications for total power and phase stability for ALMA and assess the implications for ALMA science goals. ASAC on Phase Stability: The ASAC recommends that the currently proposed technical requirements for delay errors of 22 fsec max rms change in 300 sec (drift) and 65 fsec rms deviation from 10 sec average (noise), proposed by the Systems IPT, be adopted for ALMA. This strict technical requirement is important to maximizing ALMA sensitivity at the highest frequencies, which is a major ALMA science goal…The ASAC also recommends that the Science IPT carry out simulations to see how this level of phase stability affects ALMA’s high-resolution imaging capability. The results of these simulations should be assessed for their implications on the ALMA Calibration plan and the ALMA Software effort, particularly the Pipeline. Project: We are glad to have ASAC agreement upon our recommendations. The recommended simulations are indeed planned by the Science IPT.

Response to ASAC Report of May Total Power Gain Stability ASAC on Total Power Stability: The ASAC recommends that the project investigate whether there are useful tradeoffs between gain stability and sensitivity that could be made for the four total power antennas. The ASAC also recommends that this issue of gain stability be revisited when the systems group has been able to perform well- controlled and consistent measurements on the ALMA prototype cartridges in the ALMA cryostat. Project: Tests involving some parameters have been made; recommendations for a standard measurement procedure have been made by the Systems group. Science IPT simulations on the interplay between gain stability and polarization measurements have advanced considerably and will be presented shortly.

Response to ASAC Report of May Calibration Accuracy The ASAC is requested to consider the ALMA Calibration Plan, and make appropriate recommendations to the Board on: The science loss as a function of the relative and absolute amplitude calibration accuracy of ALMA; and astronomical source calibration activities that should be started before or during early science operations, whether on other facilities or (when available) ALMA. ASAC: The understanding of flow down from calibration accuracy to science loss requires continued study. Many projects will not be demanding on calibration but the broad scope of science enabled by ALMA make it difficult to enumerate the direct impact on derived physical quantities. We recommend that the Science IPT identify and study the impact of calibration on a handful of the most challenging “Level 1” science goals. Project: A report will be issued within a month on a study of the calibration accuracy needed for a suite of DRSP projects. Among these are several which attack the highest ranked ALMA science goals. ASAC: The ASAC strongly encourages continued testing of calibration mechanisms to determine which, if any, can provide the project’s required level of accuracy. The overall area of absolute calibration needs dedicated effort within the project. Project: A kickoff meeting was recently concluded establishing a detailed costing and scheduling for the calibration mechanisms.

Response to ASAC Report of May Preliminary Calibration Activities ASAC: The project should plan and execute phase calibrator surveys with the ATF and ALMA; the project should also make maximal use of parallel efforts at the IRAM30- meter, CARMA, JCMT, APEX, and PdB. The ATF and ALMA efforts must be focused and not interfere with commissioning and testing. Project: The Commissioning and Science Verification Plan is under construction. A Calibrator Survey is a key element of the Science Verification Plan—as no array has previously operated in the southern hemisphere at most ALMA frequencies this is also a necessary element of Science Verification.

Response to ASAC Report of May Early Science Comment upon the modes being proposed for Early Science Operations in comparison to contemporary ground and space facilities planned for those years. ASAC: we recommend the development of “demonstration science projects” to exemplify ALMA scientific capability and public appeal…To maximize the scientific impact, some key ALMA programs should include coordination with programs to other facilities. Project: A similar recommendation emerged from the recent ALMA Science Workshop and will be carefully considered by the Project.

Response to ASAC Report of May Operations Comment upon he ALMA Operations Plan, particularly on issues that impact the Early Science. ASAC: The ASAC agrees with the overall principles outlined in section 7.1. The one- observatory philosophy with data quality monitored maintained by the ALMA Observatory is important. We support the primary goals: (1) producing reliable science quality images as the default product, (2) maintaining an archive for all raw and calibrated data with easy user access, and (3) making the observatory accessible to non- experts and experts alike…we agree with the science-related assumptions that underlie the Early Operations Plan: the requirement of 6-8 antennas, the selection of limited modes of operation for early observations, and the plan to have part-time science operations in the early years…The Early Operations Plan needs to be further expanded to anticipate how new hardware and software will go through commissioning to validation to regular use on the growing array…we recommend the project to seek ways to involve experts from the community in the commissioning, science verification and early science operation activities, both as a benefit to the project and as a way to disseminate expertise back into the community. Project: We are glad to have ASAC endorsement of these aspects of the plan and advice on how it may be enhanced.

Response to ASAC Report of May Software Review the prioritization of the Science Software Requirements in response to the PDR committee’s recommendation to: a. prioritize the requirements in light of schedule and cost drivers, and b. science priorities, and the importance of achieving early-science operations. This should be done in the context of the science operations plan, not independent of it. The ASAC reaffirms the importance of delivering to the user science grade calibrated data and an easy-to-use data reduction package, starting from early science. Achievement of these goals is necessary for ALMA to attract a large community of scientist from beyond the millimeter community. The ASAC is concerned that the current commissioning plan does not allow sufficient time for pipeline development with ALMA data from on-site antennas to meet the Q Early Science milestone. The ASAC recommends that it be charged to examine the prioritization when this process is complete and urges the project to complete the plans for Science Operations and Early Science, and the subsequent Requirements reprioritization as soon as possible. Project: The project shares these concerns and would be glad to have ASAC advice on the completed plans.