PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.

Slides:



Advertisements
Similar presentations
PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS IIDR 01/02 Mar 2001 Photoconductor Detector Arrays1 Photoconductor Detector Arrays for PAC S IIDR - ESTEC Stefan Kraft ANTEC-GmbH Germany Günter.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Max-Planck-Institut für Astronomie Heidelberg PACS SVR 22./23. June 2006 MPE Garching J. Stegmaier, U. Grözinger, D. Lemke, O. Krause, H. Dannerbauer,
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
The Effect of Temperature on the Dark Rate of the Silicon Photomultiplier By Jie Zhao Mentor: Dr. Richard Jones.
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
Medipix2 meeting Dec Medipix Activity at Berkeley John Vallerga, Jason McPhate, Anton Tremsin and Bettina Mikulec.
Integration and Test 14 October 2008 Martin Nordby.
October 1 -10, 2014JEM-EUSO Workshop - Toulouse1 Balloon – EUSO Xenon / UV LED Flasher Calibration Evgeny Kuznetsov for UAH / MSFC GLS team University.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Design Progress Allen Ellis 18-September
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA MIRI VM2 Testing Scott Friedman and the MIRI Test Team (special thanks to Paul Eccleston, Alistair.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Another Modular Focal Plane: Part 1 – Sub-modules Bruce C. Bigelow University of Michigan Department of Physics 5/17/04.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
Lessons from CLIO Masatake Ohashi (ICRR, The University of TOKYO) and CLIO collaborators GWADW2012 Hawaii 2012/5/16.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Wide-Field Imager for Solar PRobe Plus (WISPR)
30-Nov-2006 Jean-Marc Defise - CSL
IR Detector - Test cryostat : Machining
EVLA LO/IF Racks/Bin/Modules
Another Modular Focal Plane: Part 2 – FP assembly
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Presentation transcript:

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array2/16 Overview Performance results of FM HS Modules Status of the LS & HS Array Integration

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array3/16 8 Test Runs (32 modules) MPE Test Equipment Improvements 10 filter capacitors at the connector distribution panel inside the cryostat Sense lines for the VDDA, VSS, GRD, VDDr and Zero_bias supply lines Optics include only a black body, 1 mirror but no attenuation filters Stability of BB temperature is < 1 mK Standard Measurements Warm functional test at RT checks the supply currents Cold functional test at 4 K and the output frames Cold performance test (1.85 K) -Dark current -Noise Equivalent Power (NEP) -Responsivity FM HS Modules

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array4/16 Dark current Background of 4.2 K corresponds to a flux < exp(-18) W/pixel Cold Performance Test

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array5/16 Dark current Strong variation between modules Cold Performance Test

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array6/16 Noise Equivalent Power (NEP) The modules behave very similar up to a bias of 70mV, where the sensitivity is maximal Cold Performance Test The NEP is strongly dependent on the flux

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array7/16 Responsivity The responsivity varies by more than a factor 3 for different modules The arrangement in the detector array was chosen according to the responsivity Cold Performance Test

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array8/16 Distribution of the Responsivity in the TEL Focal Plane The modules with the high values were positioned at the center of the array HS Integration

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array9/16 Homogeneity of the Responsivity Each module has its own characteristic distribution not caused by an inhomogeneous flux FM174: almost homogeneous FM190: strong gradient Cold Performance Test

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array10/16 Reproducibility of the measurements Very good reproducibility of the data points after two tests (FEE changed) Multiple tests of modules at different positions in the set-up Different distribution between the two tests (FEE exchanged, connections re-glued) Cold Performance Test The test optics delivers a nearly homogeneous flux distribution

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array11/16 HS-Modules Status after Integration 25 modules integrated 2 open pixels 2 pixel connections cut 2 calibrated temperature sensors (FM161 + FM168) HS-Detector Status ESD protection by aluminized cigarette wrapping paper during the integration

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array12/16 Arrangement of the HS-Modules HS-Detector Status Front view of the HS-detector

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array13/16 Arrangement of the LS-Modules 25 modules integrated in FM FM 135 behavior of few pixels undetermined 3 open pixels 1 pixel connection was cut 2 calibrated temperature sensors (FM132 + FM135) LS-Detector Status

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array14/16 Mechanical Design Blue Detector Array FM Blue Detector Assembly – Integration Status FM PACS Blue Detector Array Integration Status               Mechanical Parts Blackened Baffles Cable Mount BD 4K Post BD Integration Tool BD HP Heater Harness Flasher Sapphire Filter FLBS 25 Detector Modules Suspension Feet Distribution BD Cooling Strap BD ASTECMPEKTQMC J.B.

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array15/16 FM Red Detector Assembly – Integration Status Detector Modules with FO 4K Cooling Staps Flat Mirror Housing Frame Filter Mount (5 Stripes) Baffle Frame Baffling System Clamping Device Filter 2K Cooling Stap I/F Sapphire Filter Baffles Mechanical Design Red Detector Array FM PACS Red Detector Array Integration Status Mechanical Parts Blackened Baffles Mirror Red Detector Cable Mount RD 4K Post RD Integration Tool RD HP Heater Harness Flasher Sapphire Filter FLRS1 RD 25 Detector Modules Suspension Feet Distribution RD Cooling Strap RD Filter FLRS2 Pupil RD ASTECMPEKTQMC J.B.                

PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array16/16 Work in Progress Bake out at 80°C for 3 days Final inspection prior to delivery to KT Warm functional test after cold vibration test