Qualification Plans for new Insulation Sources Daniel Dietderich.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1 Insulation Status for QXF Cables D.R. Dietderich, LBNL LARP-CERN Collaboration meeting April 9, 2013.
This is how we can help:  Avoid Risk of pollution  Trade effluent management  Generate good publicity  Protect your business and environment  Global.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.
Conceptual Design Review Senior Design University of Idaho College of Engineering.
Conceptual Design Review Senior Design
Geometry 11.4 Circumference and Arc Length. July 2, 2015Geometry 11.4 Circumference and Arc Length2 Goals  Find the circumference of a circle.  Find.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
EQ: How do you find an arc length and an area of a circular sector?
F. Borgnolutti January 17 th 2013 Proposal for a winding test procedure for qualifying the QXF cable.
Warm Up Evaluate. Round to the nearest hundredth () 6. (3)
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
Circles…… Area and Circumference The Circumference of a Circle Find the circumference of the following circles. C =  d C = 2  r 8 cm cm 2 C =
Science Puzzle by M. Deal. Electricity Cable Here is an electricity extension cable. There is nothing unusual about it but it has a curious label and.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Arc Lengths and Sectors Unit 6-3. Finding the length of Arcs An arc is part of the circumference of a circle, so you will use the circumference formula.
Perimeter and Area with Circles. Circumference of a Circle Circumference is the perimeter of the circle Formula: or (for exact answers, leave π in your.
CIRCLES RADIUS DIAMETER (CHORD) CIRCUMFERENCE ARC CHORD.
Sections Perimeter and Area with Circles.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
Full-scale trial results to qualify optimized manufacturing plan for ITER Toroidal Field coil winding pack in Japan Dummy double-pancake (DP) winding was.
BNL Progress with LR, application to LQ
Coil Design and Fabrication
TQS Overview and recent progress
Winding tests on Roebel cables
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
Development of the Canted Cosine Theta Superconducting Magnet
11 T dipole coil features and dimensions
Mechanical stability and QXF coil winding
Circles.
Voltage tap layout and quench antenna options for the long QXF magnet
9-2 and 11-3: Perimeter and Area of Circles and Sectors
6.1 Angles and Radian Measure
EVERYTHING YOU NEED TO KNOW TO GET A GRADE C
Unit 4: Circles and Volume
Presentation transcript:

Qualification Plans for new Insulation Sources Daniel Dietderich

Present Procedure for Sleeve Insulation Receive 6-20m of sleeve from the start up of the run –Confirm that the insulation easily goes over the Teflon tube Easy hand packing of insulation over tube Cable can pass down the inside of the tube –Place sleeve on reference cable sections Evaluate sleeve coverage –Is the coverage good enough? Perform 10 stacks to determine sleeve thickness –Is it the thickness desired? Unusually ~0.100mm.

SV-12 (HQ) and SV-16 (HD) Insulation from NITIVY Co. Possible sleeves for replacing S-glass Japanese vendor: 72% Al 2 O 3 – 28 %SiO 2 –SV-12 sleeve has a diameter of 12 mm –This converts to a circumference of 37.7 mm. –HQ cable perimeter is: 2*(15 mm) + 2 (1.44) = 32.9 mm

SV-12 & SV-16 on HQ Cable

SV-12 Ten Stack HD3 Cable 997R

SV-16 Ten Stack HD3 Cable 997R

A & P Technology How to inspect a spool with of sleeve? Braided Sleeve, 400' long; 0.588" diameter, 96-Carrier, S2 CG 150 1/2-1 end; degree braid angle

Insulation Braided onto Cable How should an insulated cable be evaluated? –Re-spool and inspect the entire length for defects? Insulation De-cabled section – “Bump monitor” Perhaps 100m of cable could be inspected in 4 hours. –Wind coils and repair any bad sections as needed? Perhaps OK for coil R&D but not production LBNL is developing an imaging system to monitor cables during fabrication. –Perhaps this could be implemented for insulated cables At the vendors perhaps?

Summary