DST status Ready for production Analysis of sample ksl DST’s in progress for ~1 week ksl DST event size: 2.8 MB/nb -1 560 GB for 200 pb -1 Other streams.

Slides:



Advertisements
Similar presentations
Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
Advertisements

Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
1 Offline status report LNF 19 Sep News:  MC04  all LSF=1 completed (~535 pb -1 )  mrc dst of 2005 with correct   +  - e + e - ~completed.
“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
KLOE GM Capri May 2003 K charged status report DE/Dx development vs PiD (next talk by E.De Lucia) →K e3 studies: initial design of efficiency measurement.
Sabino Meola Charged kaon group meeting 12 October 2005 Status of analysis.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
Offline Status Report M. Moulson, 20 December 2001 Summary presentation for KLOE General Meeting Outline: Processing of 2001 data History of datarec executable.
Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
BES III core/reconstruction software planning for Release 3.0 BES III core/reconstruction software planning for Release 3.0 Li Weidong
Offline Discussion M. Moulson 22 October 2004 Datarec status Reprocessing plans MC status MC development plans Linux Operational issues Priorities AFS/disk.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
Crossed Channel Compton Scattering Michael Düren and George Serbanut, II. Phys. Institut, - some remarks on cross sections and background processes  
Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
Progress on BR(K L  p + p - ) using a double-tag method A. Antonelli, M. Antonelli, M. Dreucci, M. Moulson CP working group meeting, 25 Feb 2003.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
Status of KLOE real data analysis by the AMADEUS group Oton Vázquez Doce, 4 Maggio 2007.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Status of OPAL data Matthias Schröder
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
STAR C OMPUTING Plans for Production Use of Grand Challenge Software in STAR Torre Wenaus BNL Grand Challenge Meeting LBNL 10/23/98.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
Barbara Sciascia July,29 th - LNF 1 Barbara Sciascia K  semileptonic decays Charged Kaon Meeting July, 29 th - LNF Single photon efficiency in KPM events.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Status of vertex efficiency evaluation Fabio Ambrosino, Patrizia de Simone, Paolo Massarotti, Vincenzo Patera the idea is to look for events where the.
Offline Status Review M. Moulson, P. Valente, for the Offline Group 16 March 2001 Outline: Status update FILFO: new developments (G. Finocchiaro) Questions.
Offline resource allocation M. Moulson, 11 February 2003 Discussion Outline: Currently mounted disk space Allocation of new disk space CPU resources.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
P latform stability and track-fit problems M. Moulson, T. Spadaro, P. Valente Tracking Meeting, 18 Jul 2001.
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
BESF Framework Development Weidong Li
DST data structures: Status report M. Moulson, CP working group 25 October 2001.
M. Martemianov, ITEP, October 2003 Analysis of ratio BR(K     0 )/BR(K    ) M. Martemianov V. Kulikov Motivation Selection and cuts Trigger efficiency.
Kali Calo progress report Dasha Savrina (ITEP/Moscow), Vanya Belyaev.
Electron Identification Efficiency from Z→ee Maria Fiascaris University of Oxford In collaboration with Tony Weidberg and Lucia di Ciaccio ATLAS UK SM.
BEACH 04J. Piedra1 SiSA Tracking Silicon stand alone (SiSA) tracking optimization SiSA validation Matthew Herndon University of Wisconsin Joint Physics.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
MC/OFFLINE meeting  Status  Request by Ke2 group  aob LNF
MC/OFFLINE meeting Status of data reprocessing
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
Update on the false-dead DC wire problem
Marco Incagli – INFN Pisa
P0D reconstruction/analysis update
Large scale MC production II
Offline Report Outline: Status update DST Proposal P. de Simone
Status of Brunel team and next steps
MC/OFFLINE meeting News since the last meeting
KLOE General Meeting - LNF March,
And plan for SICBDST retirement
Agenda SICb Session Status of SICb software migration F.Ranjard
Presentation transcript:

DST status Ready for production Analysis of sample ksl DST’s in progress for ~1 week ksl DST event size: 2.8 MB/nb GB for 200 pb -1 Other streams for which DST’s can be produced: rad? (question about mmg events) rpi? Proposal: Begin DST production immediately A few tens of pb -1 by end of week Ask people to begin looking before Christmas

DST details LRID, EVCLEvent headers T0GLGlobal t 0 TDSTTrigger summary CTRGSector-to-cluster CSPSCalorimeter hits CPLS, CLLSCalorimeter clusters QCAE, QWRKQCAL hits DCNHDC hit counts DTFSFitted tracks DVFSFitted vertices TCLOTrack-to-cluster ECLS, ECLOEvent classification KNVO, VNVO, INVONeutral vertices DST bank list Sample.uic file (ksl) use/path=1 usedtdb eclsfilt/par=1 emcdbini clurec clufixene emcsmooth t0_find/par=1 clufixtim/par=1 clu2trig trclmod t0_find/par=2 clufixtim/par=2 eclmod/par=2 use/path=2 hmake/par=4 eclsfilt/par=2 hmake/par=1 emcdbini clurec clufixene emcsmooth t0_find/par=1 clufixtim/par=1 clu2trig trclmod track_dst trig_dst hmake/par=5 Database interface KSTAG rejection Calorimeter reconstruction Diagnostic histograms t0 Step 1/ECL for KLTAG Bank list adjustment

Reconstruction desiderata (?) SELCOS, SPLASHFILT problemsAffect DBV =10 Updated EmC calibrationsAffect DBV <11 EMCSMOOTHBanks available for DBV <11? Data volumeAll DBV KLCRASH TCA cutProblem in DBV 10, 11 Beta cutToo tight in DBV 8, 9 rad stream mmg eventsAll DBV (cut released now) neutral filterRewritten for DBV 11 ksl stream K L  p 0 p 0, K L  gg tags DBV < 11 K S  p + p - p 0 tagAll DBV (just added) Luminosity, statistics Reject EVCL bits (DC, calorimeter trips, etc.)

2001 data sets and datarec versions DBVpb -1 %MEvts%Dates /3-30/ /6-30/ /6-31/ /10-7/12 None /2-9/12