Image Data Compression WG Spring 2004 Pre-Meeting Status Report May 12, 2003 Meeting May 17-19, Greenbelt MD Chair: Pen-Shu Yeh.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
November SLS RFM and RNG REPORT 18 November 2004.
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
CCSDS Navigation Working Group David Berry 10/01/2007.
1 Outline  Introduction to JEPG2000  Why another image compression technique  Features  Discrete Wavelet Transform  Wavelet transform  Wavelet implementation.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Developments of CCSDS Data Compression for Space Exploration in CSSAR/CAS Center for Space Science and Applied Research Chinese Academy of Sciences
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
© 2004 The MITRE Corporation. All rights reserved SCPS-TP Updates Cislunar WG Meeting CCSDS Toulouse November 2004.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Glenn Research Center Networks & Architectures Branch Communications Technology IETF73 - IRTF DTNRG Meeting November Space-based DTN Low Earth Orbit.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
April 25, 2001 GSFC Data Systems Standards Management and CCSDS P1J Status Report NTAG Meeting April 25, 2001 Felipe Flores-Amaya GSFC/Code 572.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
CCSDS Navigation Working Group David Berry 04/20/2009.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
November SECURITY WORKING GROUP REPORT November 2004.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Liang Liao Goddard Earth Sciences & Technology Research Morgan State University Greenbelt, MD Robert Meneghini NASA/Goddard Space Flight Center Greenbelt,
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
CCSDS Navigation Working Group David Berry 01/16/2007.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Image Data Compression WG
Low Earth Orbit Results
SPACE INTERNETWORKING SERVICES (SIS) AREA
CCSDS Navigation Working Group
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
Atlanta, Georgia, USA, 16 September 2005
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
SPACE LINK AREA MID-TERM REPORT
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
D. Hernández Expósito, J. P. Cobos Carrascosa, J. L. Ramos Mas, M
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
Compliance Registration
Presentation transcript:

Image Data Compression WG Spring 2004 Pre-Meeting Status Report May 12, 2003 Meeting May 17-19, Greenbelt MD Chair: Pen-Shu Yeh

Goals and Deliverables Specify an image compression algorithm fulfilling identified space mission requirements Develop a subsequent recommendation together with the supporting information (performances, usage, reference software, …).

Present Status The algorithm is based on a 3-level discrete wavelet transform (DWT) followed by a bit plane encoder (BPE). The DWT is specified in two forms: one with floating-point transform kernels, the other with integer kernels. The latter will allow compression down to “lossless” mode. The algorithm offers attractive compromise between performance and complexity for onboard applications.

DWT Status A final decision was made in January 2004 after extensive simulation showing the integer 9/7 DWT has performance better than the 5/3 integer DWT. Thus the 9/7 integer DWT is specified along with a floating point 9/7 DWT. The latter gives the best performance with no mean-error bias at all rates. Theoretical optimal weights for the integer DWT image is derived. Several variations of this weight set have been used in simulation. The final selection of the weights will wait till the Spring meeting at Goddard Space Flight Center. Chapters 1-3 have been revised and are in good shape.

Status on BPE Chapter 4 has been revised based on action item studies performed in minor details of the algorithm. Figure, table and equation numbers will have to be further edited. Independent software development confirms completeness of the spec: JPL, GSFC, U. Idaho. Cross-check will be performed after Spring meeting after the header specification is fully agreed and software further developed to reflect the final specification.

Plans Resolve minor details in Chapter 1-4. Finalize WhiteBook and request MC for promotion to RED-1 two weeks after the meeting. Review agency RIDS via 3 months after RED-1 is produced Issue Red Book version 2 for agency review two months before Fall meeting. Review RIDS on RED-2 in the Fall meeting and request for promotion to BLUE. Produce draft Green Book for the Fall meeting Produce two independent software implementations to check interoperability and completeness of spec by next meeting. Produce an open source reference software for compliance testing and performance evaluation. Software will be made available at one agency’s ftp site.