MEP201 Mechanical Engineering Drawing 1 st semester 2005-2006 S R Kale Lecture General Arrangement (G.A.) Drawings.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Identifying Basic Areas of Agricultural Mechanization
MEP201 Mechanical Engineering Drawing 1st semester
Confidential BrainTwister Solutions.  Where? Construction sites, Transport industry.  What is this called? Crane Confidential Braintwister Solutions.
Impact of Increased Modularization New Orleans, 27 October 2011 Guus Stigter.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Control Diagrams.
MBA (Trimester) Term V Module Title : Project Finance and Management
ELECTRIC TRACTION SYSTEM
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
POWER TRANSMISSION with BELTS & CHAINS
PROJECT AND STUDY DRAWINGS & DIAGRAMS
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
General idea of a couple of check rod system and adjustments
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
HVAC523 Circulator Pumps.
MEP201 Mechanical Engineering Drawing 1st semester
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
UNIT 18: APPLICATIONS OF MOTORS
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Site Construction & Installation Services
Vacuum system.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Power Factor Improvement Lecture 9. Normally, the power factor of the whole load on a large generating station is in the region of 0·8 to 0·9. However,
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
HYDRAULIC MOTORS.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
Texonics Proposal for Production Line Redesign and Retrofit.
LEFB Belt Drive AC Servo
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
MNM Fatal Machinery Machinery November 18, 2005 (Tennessee) November 18, 2005 (Tennessee) Crushed Stone Operation Crushed Stone Operation Plant.
Refrigerant compressors Akshay Kr Mishra Sharda University 4 TH YR. MECHANICAL.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
CEE 578 Senior Capstone Design Types of Construction Drawings
Different cable reel has a different role. Hysteresis type cable reel working principle and scope The working principle of A. Power control system is.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
ADVANCED MECHANICAL DRAFTING
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
MANUFACTURING ENGINEERING DEPARTMENT
Session 1: Identifying Construction Drawings and Drawing Components.
Air-cooled Modular Chiller Installation
YOUR BEST CONNECTIONS All parties concerns and interests combined
Upon completion of this module, you will be able to:
Gas Compression and Flow Dynamics NGT 150
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Updated Design of Detector Hall
Activity 1.2.5a Mechanical Efficiency
Lakota CAET Team Capstone Design Presentation
Gas Power Plant - Layout and Operation
POWER TRANSMISSION with BELTS & CHAINS
Activity 1.2.5a Mechanical Efficiency
Activity 1.2.5a Mechanical Efficiency
The Challenges of Electronic Enclosures for US Navy Ships
MSD P15280 RIT HOT WHEELZ TEST BENCH
6 MMC (Off Site Production)
Chemical Engineering Explained
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Assembly drawings Flóra Hajdu B406
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings

G.A. & Layouts (2005)2 Background Schematic / P&I drawings are available, equipment sizing and selection has been done. NEXT: Need data on various equipment to integrate with one another. What data is needed? => G.A. drawing.

G.A. & Layouts (2005)3 Overall features About the manufacturer => Title block Name plate rating Model no., Date of manufacture Ratings (capacity, design parameters) Working substance Electrical input/output Terminal points – Scope of supply (items included or excluded) Related drawings

G.A. & Layouts (2005)4 Mechanical dimensions Overall dimensions – Maximum, moving dimensions, space during operation, space for maintenance, clear space, Movement – space, rails, Mating – pipe flanges locators, size, type Mechanical coupling – Shaft locators, diameter, keyway size, Mountings – flange mounting PCD, thread/hole, locator pins, Mounting locations – base plate, mounting brackets, locations and sizes,

G.A. & Layouts (2005)5 Civil dimensions Weights and forces – Static loads C.G. locations Dynamic loads Speed Allowance for expansion, Foundation – Location of holes for mounting bolts Size of foundation bolts

G.A. & Layouts (2005)6 Handling requirements Weights C.G. Lifting points – Location of holes Hook size Special devices for lifting DO NOT LIFT from …,

G.A. & Layouts (2005)7 Electrical requirements Power requirements – V, A, p.f., 1 or 3 phase Earthing requirements Load type – reactive, …

G.A. Drawing of Motor

G.A. & Layouts (2005)9 G.A. drawings - Examples Examples of pump, chilled water system, Loco, …

G.A. & Layouts (2005)10 Slip-up (challenge!)  Flanges don’t match during erection  Foundation bolts are off  Piping and cabling become a jungle  Inadequate capacity (e.g. HOT crane at Badagrah)  Foundation dynamics are poor

G.A. & Layouts (2005)11 Lecture summary Make or procure G.A. drawing from the manufacturer/supplier, ask for more information if not given => Integrate the information to make the plant. NEXT STEP : Make plant design, O.K. for construction.