Prahl cruise array deployment/recovery Slide 1: Winches – in our past cruises we used the grey winch on the left, which was overkill for our operations.

Slides:



Advertisements
Similar presentations
Unit 7 Installing Computer Hardware
Advertisements

MO-735 Overlock Dealer Training CLICK.
Module 4, Recitation 3 Concept Problems, Friction.
Selecting the right lens. They come in wide angle, telephoto and zoom. They offer a variety of apertures and handy features. They are also the key to.
Place AS-2259 Antenna into Service
Ropes and Knots Skill Drills.
Installation. Indoor Unit Installation Typical Installation.
Rappelling Techniques ALERT Cadet Alpha 3 rd California Jason Kim March
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
Jason Wagner.  Broken or frayed wire rope run a high risk of breaking.  Poorly clamped cable ends can slip out when placed a under load.  Using a winch.
Calibration Procedure.  A winch calibration is completed via a linear interpolation between 2 points.  Requires 2 references  Known lower weight 
Flag Raising, Lowering, and Folding
Nicholas Harrington Andrew Harrington Bradley Schneider Jayon Wang.
Condensation Piping and Installation Drain Pans
Suspended particle property variation in Gaoping Submarine Canyon Ray T. Hsu and James T. Liu Institute of Marine Geology and Chemistry, National Sun Yat-sen.
Bottle Rockets! 8th grade final project.
CAPT Lab.
Sampling in the Marine Environment. Ready to depart for an exciting day on the high seas. Coastal waters research vessel. Note boom and winch used to.
Light Salvage. Objectives Identify the maximum weight for light salvage. State three areas of salvage organization and describe techniques for each. Describe.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Pressure Changes D. Crowley, Pressure Changes To be able to explain what happens to a diving bell when pressure changes Sunday, May 24, 2015.
How to Play With Your Food: Science at the Dinner Table Robert Sparks National Optical Astronomy Observatory Robert Sparks National Optical Astronomy Observatory.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Ecological Sampling. Why Do We Sample? Determine presence and/or abundance Monitor population fluctuations Assess ‘ecological damage’ Assess quality of.
Teen Living Notes Competency: Basic fashion construction procedures to produce personal clothing & home accessories.
Phase Changes. What are Some Characteristics of Solids? Have a fixed shape and volume in this state. Not easily compressible because there is very little.
MSHA MINE EMERGENCY OPERATIONS MSHA has three mine rescue stations. Each station has different response vehicles. The stations are: 1) Pittsburgh National.
Ocean Water Chemistry. 1.On average how many grams of salt are in a pot of ocean water? 2.What is the chemical name for salt, include the periodic symbols?
Fluid Behavior. Pressure Pressure is the amount of force on a given area P=F/A Pressure (in pascals) = Force (newtons)/Area(meters 2 ) If the area decreases,
Presents Muscle Testing
Installation. Indoor Unit Installation Typical Installation.
Volcanic gas. Need samples of Pumice, Scoria, and tuff Many volcanic samples are full of holes. Some samples of pumice are so full of holes that they.
ME4182 – Preliminary Project Proposal Justis Brogan David Mann Nathan Scripps Aaron Kim Cartus Johanna Kauffman Team River:
Kaia Anderson, Courtney Spang, Alex Elshaw, and Zac Repinski! Hour 5
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Brush 341 Winch Operations. B341 PTO Winch The winch on B341is very different from the electric winches on B342. This winch is driven by a PTO off the.
What Do All These Pictures Have In Common?
Page 1 Assembled trap Bolt Trap jars Screens Dive weights (6kg) Rope threading 8-mm rope Trap cones 13mm sockets 13mm sockets Cut cable ties to remove.
Copyright © Cengage Learning. All rights reserved. 2 Organizing Data.
Heidi Maiers Portrait Sculptor
Fishing Methods I got 99 problems, but a fish ain’t one!
Ropes and Knots Skill Drills.
Testing. Testing Problems  Not Just for Testers!  Although testers are obviously asked more testing problems, developers will often be asked testing.
Ship-based observations: CTD, Nansen and Niskin bottles, inverting thermometer and Acoustic Doppler Current Profiler Ben Lee December 2, 2005 EPS 131.
COMMITTEE WORK THIS IS 6/1/10 DRAFT 1 VERSION OF CRAIG’S SLIDES—FOR DISCUSSION AT 6/3 COMMITTEE CALL Have.ppt professional go through entire show and standardize.
Physical Oceanography Unit II. Physical Oceanography Physical oceanography is the study of the properties of seawater. There are 4 main topics: 1.Temperature.
Preparing Solutions.
HARDWARE – HALO RDDK 5 th Feb 2015.
COMMITTEE WORK THIS IS 6/1/10 DRAFT 1 VERSION OF CRAIG’S SLIDES—FOR DISCUSSION AT 6/3 COMMITTEE CALL Have.ppt professional go through entire show and standardize.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Sail Course ® Section 20, Marlinespike Seamanship.
Milling II Dr. Myasr Alkotaji.
Pulleys Vanderbilt Student Volunteers for Science Fall 2013.
Belay-Climb Test Review.  Feet must stay below Red Line (4 ft.)  Have a spotter when necessary.  Never go upside down.  “SOS “ when falling off wall.
Procedure for Rescuing a Casualty from a Duct Revision 0 – 18 th October 2011 Toolbox Talk.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
Textiles Technology Year 7
Mixtures 5 methods for separating mixtures. What is a Mixture? A mixture is a substance made by combining two or more different materials in such a way.
PostBase Automatic Feeder Component Removal Service Training
CANTY QUICKPORTS™ “How they work”
Chemical and physical changes
What is Buoyancy?.
Wooden stake or rebar Riparian zone Stream Riparian zone Nylon cord
How to Install the Engine Block Heater in your Car
How to Handle the Stress part 1
Equipment Familiarization
Winching Safety.
CARRI CHEF 2 – BUILDING HOW TO BUILD
Presentation transcript:

Prahl cruise array deployment/recovery Slide 1: Winches – in our past cruises we used the grey winch on the left, which was overkill for our operations. Chris DuPont brought along the blue winch on the right for trace metal work. This winch or something similar would be sufficient for our purposes. Slide 2: Array and sediment trap deployment – The array uses a 180-m ½” 8-braid nylon line with a ~100 lb weight at the bottom. It would be great if SIO can supply the weight (please let me know by June if you cannot and I will purchase one to be put on the ship before it leaves MARFAC). It has been easiest to use the A-frame for array deployment and recovery. This slide shows deployment of a sediment trap cross with 12 VERTEX-style particle interceptor traps each filled with a saline solution. Slide 3: Sample bottles – Our most challenging bottle deployments are 25-L polycarbonate carboys. Water is transferred from several Niskins to these polycarbonate carboys and the bottles placed in bags made from cargo net. The bags are attached to the line using carabiners (rated at minimum 500 lb breaking strength). Since a 25-L carboy filled with seawater weighs ~80 lbs, it is difficult to attach the bagged bottle to a taught line. During deployment/recovery, tension is taken off the array line by clipping into a line attached to a cleat on the deck. Once tension is off the line, the bottles can be lowered onto the deck and easily/safely clipped or unclipped from the line. The distance from deck to A-frame is critical – it must be enough for us to lift all bottles from a given depth range above the deck so we can clip into a quick-link in the line to remove tension. We typically deploy about a dozen 25- L carboys or 4 depth ranges with 3 carboys per depth interval. This slide shows us recovering the array – the person kneeling on deck is clipping the deck line into a quick-link threaded into the 8-braid nylon array line. We also deploy a variety of smaller bottles (2 and 8 L). Slide 3: Bottles on the deck. This slide illustrates removal of the bottles from the line once the tension has been taken off the line. The reverse procedure applies when attaching the bottles to the line – remove tension by clipping quick-link into deck line, attach bottles to array line, lift in air to take tension on array line, unclip from deck line and deploy. Array Deployment/Recovery pg1

Slide 4: This slide shows the block we have used in the past. It is small enough to maximize distance from deck to block but wide enough to allow our hardware to pass easily through it. Slide 5: Bagged bottle on line. I include this photo to clarify how the bottles are attached to the line. A quick-link is threaded through the line and the bagged bottles attached to the quick-link using a carabiner that is additionally secured with a cable tie (strength rating 100 lbs). A pigtail at the bottom attaches using a carabiner attached to the array line, which simply keeps the bottle from flopping around. Slide 6: Spar buoy, floats. We follow the in situ array using a spar buoy equipped with an RDF (please let me know if you need the frequency) and strobe. There is approximately m of line with three small floats between the spar and 4 hard hat floats. The m of line is sufficient to grapple for recovery. The hard hat floats are lightweight plastic long-line floats that are attached to the array line in a fashion similar to the bottles (carabiner additionally secured with a cable tie). There is usually a mechanical quick release mechanism that we have used to hold tension on the line while deploying the spar buoy and floats. It would be great if this were still on board. I think it is standard equipment because there was a similar one on the Revelle. Please note the cleat on the deck with the green line – this is the line used to clip into a quick-link to take stress off the line while attaching (and removing) the bottles to the line during deployment (and recovery) (e.g., see slide 3). Array Deployment/Recovery pg2

Winches

Array/sediment trap deployment

Sample bottles

Bottles on the deck

Block on A-Frame

Bottle on line