EGEE is a project funded by the European Union under contract IST-2003-508833 Summary Bob Jones Technical Director AA Meeting, CERN, 18th June 2004 www.eu-egee.org.

Slides:



Advertisements
Similar presentations
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
Advertisements

All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE is a project funded by the European Union under contract INFSO-RI NA1 F. Gagliardi EGEE Project Director All Activity Meeting, 13 th September.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
EGEE is a project funded by the European Union under contract IST SA1 and NA3 Alistair Mills Grid Deployment Group +41.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
Induction: Adding new applications to EGEE infrastructure –April 26-28, Adding new applications to EGEE infrastructure Roberto Barbera EGEE is.
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE is a project funded by the European Union under contract IST NA1 & NA5 Fabrizio Gagliardi Project Director AA Meeting, CERN, 18th June.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
EGEE is a project funded by the European Union under contract IST Presentation of NA4 Generic Applications Roberto Barbera NA4 Generic Applications.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
NA4 all activity meeting V. Breton on behalf of NA4.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Bob Jones EGEE technical director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE All activity meeting Vincent Breton On behalf of NA4.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
NA4 all activity meeting V. Breton on behalf of NA4.
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE Summary from All-activity meeting Bob Jones – Technical Director 10-11/03/2005.
EGEE is a project funded by the European Union under contract IST NA4/NA2 activities Roberto Barbera TB INFN Grid,
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
NA2 Dissemination John DYER Activity Leader
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
JRA1 (Middleware) Overview
LCG Operations Workshop, e-IRG Workshop
Presentation transcript:

EGEE is a project funded by the European Union under contract IST Summary Bob Jones Technical Director AA Meeting, CERN, 18th June

NA1 & NA5, AA Meeting, CERN, 18th June NA1 Federation structure working well for mgmt & admin Prepayment process started Monthly reporting process underway Execution plan updated  Marc-Elian working part-time on tech. coord. (also dissemination PPT tool will not be used for first quarterly report  Timesheets, WBS, project participants and work-flow being finalised PM3 Deliverables  DNA1.1.1 – Quarterly report  DNA1.2 - Gender Action Plan Draft in EDMS. Start review 10 th July Dates for first EU review fixed: February 9 th to 11 th 2005  PM9 deliverables must be completed (reviewed) before Christmas  Consider them as PM8 deliverables

NA1 & NA5, AA Meeting, CERN, 18th June NA5 White paper will evolve to address authorization and accounting issues   Next version to be ready for early November (eIRG meeting in Netherlands)  NA5 deliverables are currently not aligned with eIRG meetings A number of candidates have declined the offer made by CERN for the NA5 post – this is the most urgent point to address  Do you know any suitable candidates?

NA1 & NA5, AA Meeting, CERN, 18th June JRA1 Integration & Testing  Excellent progress on tools infrastructure to support development/integration/testing  Validation testbed setup (CERN, NIKHEF, RAL)  1 st prototype deployed and first bugs found  Configuration documentation available All sw clusters contributing to prototype work 1 st prototype deployed at CERN & Wisconsin - ARDA and Biomed representatives evaluating (feedback next week) More components/services will be integrated over the summer Execution plan : WBS & resource plan updated

NA1 & NA5, AA Meeting, CERN, 18th June JRA1 cont. Risks/Concerns:  Timescales v. quality, requirements v. complexity  DJRA1.2 (design) timeline (PM5) Deliverables/milestones MJRA1.1: tools - done! MJRA1.2: sw clusters dev & test infrastructure – done! (JRA3?) DJRA3.1: Design of grid services (Release 1)  Draft already distributed TO DO before the end of summer  All prototype software must be put in SCM  Establish testsuite

NA1 & NA5, AA Meeting, CERN, 18th June JRA3 Security GAP analysis performed with basic release plan taken into account by JRA1 Mware security established and working Deliverables/milestones  MJRA3.2: PMA group set-up – done!  DJRA3.1: (PM5) security architecture – 80% completed

NA1 & NA5, AA Meeting, CERN, 18th June NA2 Deliverables:  DNA2.1 (project info) – delivered  DNA2.2.1 (external website) – delivered  DNA2.3.1 (internal website ) - delivered  DNA2.4.1 dissemination strategy – ready for review next week  John Dyer will review DNA1.2 Execution plan uploaded to EDMS  80 individuals from 21 institutes  WBS  Partner descriptions/responsibilities 2 nd EGEE conference  22 nd – 26 th November in The Hague (Netherlands)  Goal: prepare 1 st EU review  In conjunction with DESIA, DILIGENT, SEE-GRID, Geant(?)  Next meeting 5 th July at The Hague  Include representative from GRNET for 3 rd project conf.  Need to set-up programme committee

NA1 & NA5, AA Meeting, CERN, 18th June NA2 (cont.) Products developed – websites & brochures Now completing branding  Style sheets etc. – should not deviate within the project IST2004 conference  Organising common stand Risks  Good communication with partners Websites  Suggested coherent approach with entry, public, technical, industry, training – looks good needs to be discussed offline  Need contributions for external website from activities

NA1 & NA5, AA Meeting, CERN, 18th June NA3 7 courses/presentations already held and 5 more planned through July  Moving towards more but smaller events based on feedback Experience with GENIUS portal and GILDA testbed Good progress on internal website Deliverables/milestones  DNA3.1.1: (PM3) Training Plan – end of June  MNA3.1: Training and induction planning phase complete Consult other activities to ensure “programming” courses are inline with the needs of the project NeSC team now complete Risks  Uneven spread of NA3 partners (None in France, Iberia) – link with NA4

NA1 & NA5, AA Meeting, CERN, 18th June JRA4 Deliverables/milestones  MJRA4.1 (PM3): definition of metrics – document in preparation. Formal review?  DJRA4. 1(PM6): spec interfaces – in progress (50%)  MJRA4.2 (PM6): requirements & use cases (input from users, mware and operations activities) - in progress (<50%) Hiring advancing but not yet finalised Risks  Current architecture model relies heavily on GN-2 software GN-2 timescales not clear  Need better integration with CERN on network activities (JRA4/SA2) Suggested CERN (David Foster) to join TNLC?

NA1 & NA5, AA Meeting, CERN, 18th June SA1 Better defined roles/responsibilities for ROC and CIC  Roles of each ROC identified (ROC coordination) Deliverables/milestones  DSA1.1: Exec. plan for first 15 months of infrastructure operation Will go to formal review 1 st July LCG-2 deployment centres  RCs connected in all federations  Currently 62 sites (covers PM6 and PM12 milestones)  GRNET, Clermont and SARA is a connected non-HEP site Non-HEP applications deployed  BIOMED VO supported by IN2P3-Lyon, INFN-CNAF RB, RCs at Clermont, Lyon Technical problem with CNAF RB to be addressed to get first BIOMED job running

NA1 & NA5, AA Meeting, CERN, 18th June SA1 (cont.) Mware certification testbed  CERN (other ROCs to join, first Italy and SEE) used by SA1 people to certify new mware Pre-production  Starts with LCG-2 waiting for JRA1 components  Nick Thackray (CERN) will coordinate this service and produce execution plan Platforms supported  SA1 questionnaire RC responses collected and supported platform list agreed with JRA1 (RH Enterprise & free distribution from same sources)  Personnel Improved but still some holes and inconsistencies (e.g. CE, SW)

NA1 & NA5, AA Meeting, CERN, 18th June SA2 WBS finalised Manpower  RCC KI have been slow to start and now have a new team ane expect a plan by Monday Milestone  MSA2.1: First meeting of EGEE-Geant/NRENs Liaison Board - first meeting held this week Place to discuss/deal with practical issues of interface between NRENs and EGEE Terms of reference document in EDMS Building db of networks connections (discuss with SA1) Risks  Lack of understanding of networking issues by users hence vague requirements

NA1 & NA5, AA Meeting, CERN, 18th June NA4 BioMed applications deployed and expect to run first job shortly  Milestone: demo BioMed application running on LCG-2 by Sept.  Mammogrid people are now involved Generic  First EGAAP meeting held June 14 th 4 applications presented 3 applications (comp. chemistry, earth science, astro-particle) recommended for deployment with allocation of NA4 resources –Mini-ProjPlan will be made between each application and EGEE –Progress report at next EGAAP meeting (2 nd conf)  EU projects: GRACE, Mammogrid and Diligent asking for NA4 support  Expression of interest: Planck/Gaia (astroparticle), SimDat (drug discovery) Risk: how to address growing interest from external institutes/ EU projects/ applications

NA1 & NA5, AA Meeting, CERN, 18th June NA4 (cont.) Test team  First test plan written and template defined  Contact with JRA1 Deliverables/milestones  MNA4.1 requirements – done Simple tool being used of mgmt  DNA4.1 common app. Interface (PM3): draft in EDMS Ready for review end of June Manpower  70% identified (some groups have not yet provided info, others are still hiring)  Need better process to involve all NA4 partners NA4 open meeting  to be held in Catania July  Sessions with SA1, JRA4-SA2, JRA1

NA1 & NA5, AA Meeting, CERN, 18th June NA4: Project Technical Forum (PTF) Cross-activity forum to address requirements / specifications etc. Mandate and composition set-up by PEB First meeting held 17 th June  Clarified mandate/programme of work  Members from all activities (except NA2-5)  Info. (agenda/minutes/ list) are public Next steps  Will be submitted to PMB  Put together requirements from all sources and address first specifications  PTF members involved in review of related PM3 deliverables (DJRA1.1, DSA1.1, DNA4.1)

NA1 & NA5, AA Meeting, CERN, 18th June NA4: ARDA LCG(HEP) body to address analysis on the grid Representatives from the 4 LHC experiments and EGEE personnel Currently testing gLite software through experiment frameworks Workshop next week to provide feedback on first evaluation of the gLite software Must ensure mechanism where simulation/reprocessing (i.e. batch jobs) using gLite can be tested with the experiments as well as analysis

NA1 & NA5, AA Meeting, CERN, 18th June Inter-activity issues Technical  JRA1/JRA3 – integrate security design in mware  JRA1/JRA4 – discussion on-going but need to clarify integration of network components  NA4/JRA1 – clarify feedback loop for BioMed and generic applications evaluation of gLite (start with mailing list)  PTF will help at requirements/service specifications level NA3/JRA1/SA1 – technical training programme

NA1 & NA5, AA Meeting, CERN, 18th June Deliverables PM1 deliverables sent  DNA2.1project presentation  DNA2.2.1 external website  DNA2.3.1 internal website PM3 deliverables  DJRA1.1 architecture  DJRA2.1 quality plan  DJRA4.1 common application interface  DNA1.2 gender action plan  DNA3.1.1 training plan  DNA2.4.1 dissemination plan  DSA1.1 execution plan  DNA1.1.1 quarterly report Effort data collected from timesheets Activities to provide textual description of work performed Drafts exist Go to review end of June Moderators/reviewers Send to EU end July Needs to be done during July – keep it short! Send to EU end July

NA1 & NA5, AA Meeting, CERN, 18th June Common themes Requirements tracking  Converge on common tool for managing/tracking requirements across all activities Testing  Coordination many testing activities How to avoid too much overlap, gaps and ensure we focus on priorities Common tools and frameworks Must ensure mechanism where simulation/reprocessing (i.e. batch jobs) using gLite can be tested with the experiments as well as analysis (ARDA) Migration between LCG-2 and GLite  Must avoid “big bang deployment” by evolving existing service  LCG-2 managed data must be preserved - should be transparent for users Training  Link with NA2, NA4 and SA1 to ensure constant supply of participants Next All-activity meeting: September (around 7 th Sept.) review status of PM6 deliverables