CENF meeting 3-Oct-2013. What is going on? WA104 and WA105 still waiting for an official CERN communication, to be treated as any other approved experiment.

Slides:



Advertisements
Similar presentations
1. Long term auction platform IFE: Progress report. Signature of the MoU and preparation of transfer of long term auctions to CASC.EU IPE: Planning for.
Advertisements

A quick pre-session primer.
The Registration Process REFERRING. Students are referred to Cyber School a number of different ways including: School Based Administration School Based.
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Meet Mary. Mary is your Receptionist. She is happy, professional and energetic.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
What is the Advanced Placement Program? The Advanced Placement Program are courses taught at local high schools, which allow students to participate in.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Performance Management and the cycle of appraisal.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
Forms Development Important Considerations. Forms Development Step 1  Determine all official forms you use, ie. grade forms, transcripts, attendance.
Copyright Course Technology 1999
SIMS: Secondary Ion Mass Spectroscopy
K-12 MONITORING REPORT HIGHLIGHTS DECEMBER ELEMENTARY NOTES  ELA & MATH NEW COMMON CORE FULLY IMPLEMENTED  HIGHER LEVEL THINKING SKILLS  EVIDENCE.
Linear Collider Common Fund Report M. Hronek1 19.JUN.15 CERN.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
TESTING SERVICES Overview Testing Accommodations is a collaborative process between the DRC student, the Professor, and DRC. COMMUNICATION IS ESSENTIAL.
Title I Annual Parent Meeting Bardmoor Elementary.
Introduce Crown College College Advising vs. Major Advising Review Policies that may differ Enrollment Deadlines Review Degree Requirements Review General.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Presented By: Nicole Perez.  Appointed by the department  Gain approval for hosting conference  Plans conference/event Registration and Payment Website.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
HFM-coll-meeting, 20 th Mar. 2013, GdR & FK, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk & Francois Kircher 20 th March th EuCARD-WP7-HFM Collaboration.
Simplifying the Budget Process
Finding Value in Your Audit Oregon Fire District Directors Assoc. Conference November, 2013.
1 Seventh RD51 CB meeting – 2/9/2011 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the VII CB CERN, 14/4/2011 (Minutes circulated.
WEEK 1 You have 10 seconds to name…
1.Is it More, Less, or Exactly Half? 2. Is it More, Less, or Exactly Half?
Ian Bird GDB CERN, 9 th September Sept 2015
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Anna Hogrebe Corporate Communications November 15, 2012 Issues Management & Corporate Communications.
Right 0f Way Parking Snug Harbour. History Snug Harbor Built in 1983 Parking in Right-of-Way Over 30 Years Formal MOU submitted to town in 2008 Verbal.
CERN Test Beam Update and Schedule
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
CERN Neutrino Platform 4 th April, 2014 FNAL M.Nessi.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
A. Valassi – CERN Clouds 2 nd Price Inquiry LHCb brainstorming – 7 th Oct CERN Cloud 2 nd Price Inquiry Andrea Valassi (IT-SDC) Thanks to Andrew,
1 TenStep Project Management Process ™ PM00.5 PM00.5 Project Management Preparation for Success * Manage Scope *
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
SPSC113 summary for EATM Lau Gatignon / EN-MEF Open Session:WA104, WA105, RD52, NA62, AEgIS, GBAR Closed Session:Neutrinos, P348, AD experiments, DIRAC,
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
© Questionnaire 27 th September 2010.
 Each S shop, or assistant is to brief of coming tasks, current projects  Steps toward completing those tasks and projected completion dates  Areas.
WEEK 6 Introduction to Project Management. Agenda Phase 4: Controlling.
CMS Communication plan for stable beams Preliminary plan 21 April 2016.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
CERN - IT Department CH-1211 Genève 23 Switzerland t RITS Forum 29 October 2009 Nick Ziogas IT-UDS.
The CE RN N EUTRINO F ACILITY Marzio Nessi & Rende Steerenberg On behalf of the CENF study/project team LAGUNA, DESY 25 February 2013.
CERN Neutrino Platform 10 th January, 2014 ICFA, Neutrino European Meeting A.Ferrari, M.Nessi, P.Sala.
General Information & Templates S. Prodon. Medium Term Plan MTP approved by the Finance Committee in June Peaks at a cumulative deficit of 540.
Safety Documentation EHN1
CERN Neutrino Project 26th November, 2013 M.Nessi.
NA61 news and plans News from other labs/experiments
Defending the Dissertation
Ad#1 for model essay Ad#2 for model essay.
Associate Director of Financial Aid
Convent of Mercy Secondary School Science Show attended by all 6th class pupils Science Week November 2017.
Registration Timeline
Practice Geometry Practice
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

CENF meeting 3-Oct-2013

What is going on? WA104 and WA105 still waiting for an official CERN communication, to be treated as any other approved experiment Start of logistic/infrastructure discussion with CERN services to prepare/consolidate b182 and b185 Starting a new level of discussions with the various CERN groups and departments First discussions have started with ICARUS to define a list of activities and sharing of responsibilities with CERN (next meeting tomorrow) towards a MOU Next step: same discussions with LAGUNA and NESSiE Attempt to organize a brainstorming meeting on possible future R&D activities with the US colleagues (second half of November)

What is going on? Organization of a Neutrino town meeting at CERN November. Still discussing exact scope and attendance Preparation of a CERN budget request for the next MTP. Need to be understood now to avoid surprises Work on EHN1 extension continues (see later) Work on Secondary beam continue (see later) LAL studies on a possible primary beam geometry should converge by next week