Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.

Slides:



Advertisements
Similar presentations
Technology Department EDMS nb.?????? Maintenance methods and policy in FPS section Maintenance Management, Spare Parts Management. Overview of activity.
Advertisements

Wincite Knowledge Warehousing and Networking Sophisticated Simplicity.
Beyond the Help Desk Getting ahead of the game Mihaela Damian Dan Sexton 11 th July 2013 CSCS > School of Clinical Medicine > University of Cambridge.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
1 The IIPC Web Curator Tool: Steve Knight The National Library of New Zealand Philip Beresford and Arun Persad The British Library An Open Source Solution.
8.
Chapter 1 Assuming the Role of the Systems Analyst
Chapter 9: Moving to Design
An overview of the CERN CMMS
Is Your IT Out of Alignment? Chargeback and Billing with Parallels Automation Brian Shellabarger, Chief Architect - SaaS.
David Warne Independent Manufacturing Consultant.
Design Office meeting Design office meeting.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
© Rheinmetall Defence 2013 The Geospatial Catalogue and Database Repository (GCDR) and the Knowledge Management System (KMS) Shane Reschke – Technical.
Chapter 9 Elements of Systems Design
Bob Thome, Senior Director of Product Management, Oracle SIMPLIFYING YOUR HIGH AVAILABILITY DATABASE.
Clarity Educational Community Get the Results You Need When You Need Them Transitioning to CA PPM On Demand Presented by: Joshua.
Software Configuration Management
MP5 migration: D7i – P. Martel & B. Vercoutter – TS Workshop Archamps – May 25 th 2005 – EDMS Agenda New Functionalities and Possibilities Underused.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
Software Quality Assurance
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
LHC Maintenance Management Policy Chamonix XIV January 2005 T.Pettersson - EDMS: LHC MAINTENANCE POLICY AND REQUIREMENTS.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Teamcenter – Overview Teamcenter - Lab Wide EDMS1.
COMM89 Knowledge-Based Systems Engineering Lecture 8 Life-cycles and Methodologies
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Safety Commission databases support TS/CSE 1 EDMS TS Workshop 2005 SAFETY COMMISSION DATABASE SUPPORT Presented at the TS Workshop 24 th May 2005 S. Petit,
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Technology Department WP2 Progress Report Th. Otto
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
CERN-IT/DB After-C5 Presentation EDMS Service Migration Monica Marinucci Lopez October 4th 2002 EDMS Document:
Reliability Applied to KM3NET
Adxstudio Portals Training
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Chapter 1 Assuming the Role of the Systems Analyst.
Component and Deployment Diagrams
Vacuum Controls Quality Management
Cisco Data Virtualization
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Deck 12 Accounting Information Systems Romney and Steinbart
E. Manola-Poggioli 05 December 2001 EDMS doc
CAD DESK PRIMAVERA PRESENTATION.
Roadmap for the S-100 Implementation Decade
Presentation transcript:

Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Agenda Present state New application - MTF Target state How to get there Issues Conclusion

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Present state of MP5 usage Classical asset tracking and maintenance management usage: –ST division – Infrastructure maintenance & applications: (GESMAR, CABLOTHEQUE,..) –AT division – Cryogenics maintenance, tools management (MTM) –EST division – MF, SU for equipment and tooling management –TIS - Radio Protection (instrumentation) –Industrial Services - access via special pc;s and special software installations

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc MP5 accounts Several separate MP5 accounts on separate Oracle databases: ST accounts AT accounts EST, TIS accounts …. Initial reasoning (1997): Data manipulation errors cause more problems than multiple system administration does.

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Planning Design Purchasing Production Installation Operation Maintenance Dismantling French INB Regulations EDMS provides tools for LHC Project Lifecycle Design Quality Manufacturing Quality Lifecycle product support

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Web MTF portalMobile MTF portal CADIM Design data Drawings & Documents Other DBs Parameters Production data MP5 Asset tracking Work management EDMS Common Layer The architecture of MTF

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Manufacturing and Test Folder ?  A standardized application for production follow-up, which can be adapted to any kind of equipment.  Allows recording and managing detailed manufacturing information for any individually numbered object: –follow all aspects and details of a piece of equipment’s manufacturing process –integrate the above with the piece of equipment’s conceptual data –integrate this data with existing data from tests and result files –make this information accessible to people geographically distributed

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc MTF Web

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc A Cryo Dipole in MTF

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Physical Layout Physical Element 1 Physical Element 2 PBS Project Breakdown Structure MTF Assembly 1 Manufacturing and Test Folder LHC Item Catalogue MTF Assembly 2 Manufacturing and Test Folder Design, Installation, Maintenance Parameter Database

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc MP5 successor, D7i features Multi Organisational units support: Access rights may be defined per Org. unit, defined by the users. Data still protected but may be shared Web access – no more special installed PC:s. Today’s reasoning : common system on unique database is manageable and has many practical advantages. IT provides redundant clustered system for 365/365 operation.

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Preparations The actions to undertake:  Merge of EDMS and Mp5 Oracle instances and simultaneous move to new Oracle cluster system in collaboration with IT/DB – 3 new machines acquired.  Merge of accounts in MP5 – system engineers have a plan. Waiting for DSTM approval of this plan…. (end – May)  Multi-unit organisational consequences – access rights etc..

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Preparations – cont’d  Study impact of data model change in D7i (known) on GESMAR-ELEC, MTF, ….  Set up test system  Create and test migration scripts (iterative process) in collaboration with DSTM.  Migrate merged account to D7i

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Provisional time schedule  Merge of databases – May  MP5 account merge – September (strongly dependent on DSTM Support…)  Test environment installation – October  Migration to D7i and first production tests – November-December  Acceptance of D7i in production and phase out of old systems – January 2004

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Issues  DSTM technical support  CERN Manpower resources  Adaptation of (large) applications to the new system

Corporate Technical Infrastructure Management T.Pettersson EST/ISS EDMS doc Conclusion  Opportunity to create a unified Organisational wide asset tracking and maintenance management system.  Global management policies may be applied  Industrial support access to data over Web  Lower system support costs with a 365/365 system available.