Proton Source: Linac and Booster Elliott McCrory AAC Review February 4, 2003.

Slides:



Advertisements
Similar presentations
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Booster Operation in Support of the Collider Program
Proton Source Meeting March 12, Agenda MiniBooNE Champaign Goal Achieved What is it? Who did it? How was it done? WBS coming; Budget Codes going.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
The “Run II Era” The proton source is very close the the specifications in the Run II Handbook. Although it’s the highest priority, support of collider.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
The Proton Source (mostly Booster) in the “Collider Era” Eric Prebys February 3, 2003.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Proton Economics Eric Prebys FNAL Accelerator Division.
Toward an Improved Model of the Fermilab Booster Synchrotron A. Drozhdin, J.-F. Ostiguy and W. Chou Beam Physics Department Introduction The Booster is.
Presentation transcript:

Proton Source: Linac and Booster Elliott McCrory AAC Review February 4, 2003

4 February 2003Proton Source--McCrory2 Talk Outline Improvements made since last June. Current operational performance. Beam parameters. Current issues: Operational. Technical. Physics. Administrative. Plans and expectations for the next 8 months.

4 February 2003Proton Source--McCrory3 Improvements Since June, 2002 Linac 201 MHz Modulator “Switch Tube” inventory (61 tubes) tested One tube rebuilt successfully by Econco. Tevatron Clock: Trailer hitch mode for adding MiniBooNE pulses Full flexibility in added MiniBooNE pulses to TCLK. Replaced Booster’s MP02 extraction magnet & power supply No hardware limits for running at 5 Hz Upgrade of Linac water systems (200 MHz) Booster tune measurement through cycle 

4 February 2003Proton Source--McCrory4 Booster Tunes Through Cycle H V Time in Booster cycle, milliseconds

4 February 2003Proton Source--McCrory5 Improvements, Continued MiniBooNE: 4E12 protons/pulse at 1 Hz Booster vacuum controls upgrade underway Longitudinal dampers work ongoing Dedicated cavity commissioned Booster Collimators New plan is underway Project Manager: Kasper Expect to install by July shutdown 2X improvement in flux? Ion Profile Monitor (IPM) operational  Significant improvements in personnel deficit 

4 February 2003Proton Source--McCrory7 Personnel Changes!! Chuck Ankenbrandt (1/1/03) has transferred to Booster as “Beam Physics Liaison,” charged with prioritizing studies. Craig Drennan (1/1/03) has transferred to Booster to assist and to take over engineering duties with/from Bill Pellico (~replaces Bob Webber). Tom Dombeck (10/1/02) has transferred to Booster to help with physics and administrative duties. Trevor Butler (6/15/02) has been hired to perform engineering duties for Linac. Yang Xi (postdoc) will soon join group (2/15/03?), primarily working on non-invasive, laser-based profile measurement. Will work for Chuck and for NICADD (Court Bohn). Xiaobiao Huang (graduate student) will come up from Indiana to work on precision lattice measurement and study mechanisms of beam loss from space charge. Volunteer Linda Coney (postdoc) has begun to contribute significant time. Primarily working on beam steering and lattice measurement. Volunteer Larry Bartoszek has been commissioned, through the efforts of the MiniBooNE collaboration, to assist in designing the collimator shielding.

4 February 2003Proton Source--McCrory8 Current Operational Performance The Proton Source does not limit Run II Operations But MiniBooNE demands lead to compromises Current Linac performance mA at up to 4 Hz NTF operates 3 times/week MuCool Annex construction

4 February 2003Proton Source--McCrory9 Proton Source Parameters Parameter Current Performance Run II Handbook Goal Comments Pbar Stacking Pulse Intensity 4.5E12/batch = 5.5E10/bunch >5E12/batch Limited by Booster efficiency and residual radiation concerns Hourly Intensity0.8E16 Run II1.2E16 Limited by Pbar cooling cycle time Transverse Emittance  mm-mr<15  mm-mr Collider filling Intensity E10 / bunch 5-7 6E10 / bunch Longitudinal Emittance eV-sec / bunch<0.1 eV-sec / bunch Better understanding of transition crossing & improved long’l dampers MiniBooNE Intensity 1 Hz = 1.4E16 pph 8E16 pphResidual radiation issues

4 February 2003Proton Source--McCrory10 Current Booster Performance  Collider: 4.5E12 protons per pulse at (1/2.2) Hz. Approximately satisfying their demands. Can provide 5E12 ppp, but reducing this to accommodate more flux for MiniBooNE. MiniBooNE: 4.0E12 ppp at 1 Hz (1.4E16 pph) Only 20% of desired 8E16 pph

E17 Particles Per Day Total Beam MiniBooNE Stacking One Week of Running over 1/1/2003

4 February 2003Proton Source--McCrory12 Operational Limitations Linac Inventory of 200 MHz power amplifiers (Burle “7835”) still an issue Situation has not affected operations, yet # of spares has not increased Three of last 11 tubes failed prematurely Expect/need 11,000 hours, got: 2664, 5469 and 6410 hours Booster & Linac: Losses & Activation 

4 February 2003Proton Source--McCrory13 Limitations: Losses/Activation Linac Activation is noticeable, but not a limiting factor  Tunnel shielding a problem at flux  5X higher Booster Booster losses increase non-linearly above ~4E12 ppp  Can run 4.8E12 (and higher), but leads to unacceptable activation Activation already limiting maintenance RF15: >200 mR/hr at one foot  Average activation in Booster tunnel is ~10 mR/hr Component damage Cable failures seen already Extraction kicker failed 1/28/2003, probably from radiation damage Activation decays, roughly, as e –a t [days] 0.03 < a < 0.05 Half-life: days

4 February 2003Proton Source--McCrory14 Activation Decay of Linac 400 MeV Lambertson Slated for replacement in July shutdown mR/hr at 1 foot Days since beam off 13 Jan 2003, 11:45 AM

4 February 2003Proton Source--McCrory15 Activation of Booster RF Station 15 An improvement since November We reduced beam to MiniBooNE  Changed this PA last week

4 February 2003Proton Source--McCrory16 Booster Losses vs. Intensity Intensity (E12) Energy Lost (KJ)

4 February 2003Proton Source--McCrory17 Trips Points Added to Contain Losses ~Dozens loss monitors with trip levels set to reduce activation  Not completely adequate! Average power lost: B:BPL5MA  Equals: (5 minutes) Limit: 400 Watts Also not completely adequate!

4 February 2003Proton Source--McCrory18 Loss Monitor Trip Points BRF11: 200 1ft BRF15: 300 1ft

4 February 2003Proton Source--McCrory19 Power Lost in Booster 1 Sept Jan 2003 Beam power lost, watts Beam extracted per minute, E14 PPP, E12

4 February 2003Proton Source--McCrory20 Current Issues: Technical (1/3) Goal: Reduction of losses at higher ppp levels Longitudinal dampers  Work is ongoing, Pellico Transition jump system Tried ~1.5 years ago, but failed due to longitudinal instabilities and misaligned quads Re-commissioning now

4 February 2003Proton Source--McCrory21 Booster Longitudinal Dampers No DampersDampers Working

4 February 2003Proton Source--McCrory22 Technical Issues, Continued (2/3) Ramp monitor program  Under development, in Java, Guglielmo (CD) Aperture and Orbit Improvements Ramped correctors, Prebys RF cavity upgrade Increase aperture from 2¼” to 5” Entire project is very expensive Universities will machine parts for two prototype cavities of new design Project manager assigned: Padilla First assignment: Can prototypes be installed in August?

4 February 2003Proton Source--McCrory23 Ramp Monitor Program Latest Measurement 1 sigma envelope

4 February 2003Proton Source--McCrory24 Technical Issues, Continued (3/3) LLRF improvements Longitudinal dampers improvements Phase lock improvements to MI Attempt phase lock of beam signal rather than VCO signal to MI RF reference Injection overhaul Maintaining traditional reliability NUMI turn-on is coming …

4 February 2003Proton Source--McCrory25 Current Issues: Physics Space-charge study group requesting studies Many participants: BD/Physics (Chou, Spentzouris, Ostiguy), NICADD (Bohn + students & post-docs), NUMI/MINOS (various), MiniBooNE (various) Ion Profile Monitors Spentzouris, Amundsun, Jungman, Tomlin, Prebys, etc. Understanding the calibration Lattice calculations    Drozhdin, et al. Dispersion problems at injection Caused by injection “OrBump” and the “dog legs” around extraction septum Verified by studies last week Minimum configuration for Collimator Shielding  Kasper, Prebys, Mohkov, Bartoszek, Chen, etc.

4 February 2003Proton Source--McCrory26 Edge Effects of Dog Legs on Dispersion: Predicted No dog legs 3.2 m 1.8 m Dog legs on 7 m 0 m

4 February 2003Proton Source--McCrory27 Edge Effects from Dog Legs H Dispersion Difference: Dog Legs at 100% and 60% Data

4 February 2003Proton Source--McCrory28 Tune Shift from Dog Leg Change Dog Legs NominalDog Legs down 40%

4 February 2003Proton Source--McCrory29 MARS Estimates of Collimator Shielding Activation Residual Dose, mSv/hr (100 mR/hr) Relative Location in Shielding, vertical (cm) Edge of Shielding After: 30 days beam on, 1 day cooldown Mukhov

4 February 2003Proton Source--McCrory30 Mechanical Design for Collimator Shielding Design from Larry Bartoszek

4 February 2003Proton Source--McCrory31 Current Issues: Administrative Staffing. Short-term staffing problem: How to use our new workers! Further needs: Another technician in Booster to support new engineer. Backup for Lackey already approved, but individual not identified. Coordination of offers of help from MiniBooNE and NUMI. More needs will be determined as new workers gain perspective. Complete and cogent plan for studies. Coordination and direction of all Booster studies (Ankebrandt, Prebys). Weekly meetings. Understanding space-charge forces on the beam (Chou). Weekly meetings.

4 February 2003Proton Source--McCrory32 Plans for the Next 8 Months. New Linac power amplifiers 8 scheduled for delivery between now and August Improvements in the longitudinal dampers system Implementation of transition jump Gradual replacement of aged 400 MeV line power supplies Installation and commissioning of collimator shielding Want to install before July shutdown

4 February 2003Proton Source--McCrory33 Plans for July Shutdown Install & commission new 400 MeV Lambertson magnet Installation and commissioning of new 8 GeV EDWA magnets Work on RF cavity upgrade: prototypes installed? Now, possibly install during July shutdown

4 February 2003Proton Source--McCrory34 Summary: Proton Source Steady operation for Collider Operating for MiniBooNE But they want 5X increase in flux Extensive, dynamic and growing team: investigating Booster issues Worries: Linac power amplifiers Booster activation Component damage? NUMI turn on before MiniBooNE is finished?! 32 year old machines And some workers nearing retirement