24x7 Support Ian Bird GDB 9 th September 2008. The response times in the above table refer only to the maximum delay before action is taken to repair.

Slides:



Advertisements
Similar presentations
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Advertisements

1 The Path to the Ph.D. in IS: Part 3, Advanced coursework and dissertation research.
Shift Blocks Preview takes into account discussion at Run Coordination Meeting of 2009/04/01 Prepared by C.Clement, B. Gorini M. Aleksa, A. Ciocio, S.
Ian Bird LCG Project Leader LHCC + C-RSG review. 2 Review of WLCG  To be held Feb 16 at CERN  LHCC Reviewers:  Amber Boehnlein  Chris.
Copyright © 2014 by The Segal Group, Inc. All rights reserved. The Case for Pension Relief Presented by: Joseph A. LoCicero Harold S. Cooper July 16, 2014.
Organisational policies
TEG next steps Ian Bird, CERN GDB CERN, 9 th May 2012.
Organization & Supervision. Daily Work Schedules General Consideration: A work schedule must make the maximum use of the human recourses available and.
New Shuttle Routes. Current Health Sciences Shuttles – Four (4) different primary routes with excessive stops – A few single purpose routes – “Concierge”
f has a saddle point at (1,1) 2.f has a local minimum at.
1 times table 2 times table 3 times table 4 times table 5 times table
Surge Capacity Plan EMERGENCY DEPARTMENT.  Surge capacity strategies will be implemented when volume exceeds staffing and/or treatment space POLICY:
Tier-1 Overview Andrew Sansum 21 November Overview of Presentations Morning Presentations –Overview (Me) Not really overview – at request of Tony.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Aircraft maintenance technicians perform routine maintenance and repair work on aircrafts Usually under pressure because customers and passengers cant.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
7-8 SCHEDULED MAINTENANCE AND REPAIRS OBJECTIVES: 1. TO FIND THE COST OF SCHEDULED CAR MAINTENANCE 2. TO FIND THE COST FOR CAR REPAIRS Example 1 p 280.
UNAC/UHCP/SFRNA Proposal: Professional Practice Standards.
Ian Bird LCG Project Leader LHCC Referee Meeting Project Status & Overview 22 nd September 2008.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
Summary of RSG/RRB Ian Bird GDB 9 th May 2012
Ian Bird GDB; CERN, 8 th May 2013 March 6, 2013
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Ian Bird LCG Project Leader WLCG Collaboration Issues WLCG Collaboration Board 24 th April 2008.
Scheduling. As the manager, one of your main duties is to staff your area of responsibility To do this, a manager must: Understand what jobs need to be.
Feedback from the Tier1s GDB, September CNAF 24x7 support On-call person for all critical infrastructural services (cooling, power etc..) Manager.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
WLCG Tier1 [ Performance ] Metrics ~~~ Points for Discussion ~~~ WLCG GDB, 8 th July 2009.
Ian Bird GDB CERN, 9 th September Sept 2015
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
High Availability Technologies for Tier2 Services June 16 th 2006 Tim Bell CERN IT/FIO/TSI.
Texas Nodal Program ERCOT Readiness Update TPTF June 23, 2008.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
 Dispatcher and Fulfillment changes Phase 1 - Launching 3/13/2011.
Data management demonstrators Ian Bird; WLCG MB 18 th January 2011.
Tables Learning Support
Ian Bird WLCG Networking workshop CERN, 10 th February February 2014
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
Texas Nodal Program ERCOT Readiness Update TPTF May 5, 2008.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
APWU Tentative Highlights of the New Collective Bargaining Agreement.
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.

Communication, Communication, Communication
Ian Bird WLCG Workshop San Francisco, 8th October 2016
VENDOR ON-BOARDING PROCESS
Cross-site problem resolution Focus on reliable file transfer service
Service Level Agreement/Description between CE ROC and Sites
KISTI-GSDC Tier-1 SITE REPORT
Time Shifting / Storage – Above Ground
2012 Line Information System Coca-Cola Refreshment
Times Tables.
Popular Ways to Reduce the Cost of Garage Door Repairs
Washington Reading Corps Site Applicants
Request for Proposal and Selection Procedures
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.

Who to Hire & What to Consider
3 times tables.
6 times tables.
Backtesting.
Presentation transcript:

24x7 Support Ian Bird GDB 9 th September 2008

The response times in the above table refer only to the maximum delay before action is taken to repair the problem. The mean time to repair is also a very important factor that is only covered in this table indirectly through the availability targets. All of these parameters will require an adequate level of staffing of the services, including on-call coverage outside of prime shift. The following parameters define the minimum levels of service. They will be reviewed by the operational boards of the WLCG Collaboration.

Issues / discussion How do Tier 1s provide after hours coverage (“on- call”)? Has this worked in the last few months – if not how will this be addressed? How do (and should) we measure response to issues? – This is an MoU parameter – If sites reliable and experiments happy – no issue.... But... How will we manage scheduled downtimes? – Do we need regular scheduled maintenance? Some sites propose this, others do not always need it – Can’t have several sites scheduled down on same day