U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.

Slides:



Advertisements
Similar presentations
Table of contents 1 Manual of Operational Procedures (MOP) 2
Advertisements

Slide 1 The Universal Business Language International, royalty-free library of electronic transaction documents. Designed in an open and accountable vendor-neutral.
Intellectual Property Rights Policy Mark Palmer – Vice Chair 24 May 2006 U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
15 th UN/CEFACT Plenary Geneva, November 2009 Standards Development Organisations Anders Grangard UN/CEFACT Vice-Chair Standards liaison.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT The UN/CEFACT Vision.
A summary of ebXML (the new World Standard for e-Business) Dave Welsh Collaborative Domain Corporation.
Country Stakeholder Perspectives Virginia Cram-Martos Director UNECE Trade and Timber Division U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND.
TBG3 Transport Vancouver Meeting Closing Plenary 17 March 2006 Chair : Dominique Vankemmel (France) Vice-Chairs : Verna Schultz (USA), Yoshi Kito(Japan),
Country Stakeholder Perspectives Virginia Cram-Martos Director UNECE Trade and Timber Division U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND.
Introduction to ebXML Mike Rawlins ebXML Requirements Team Project Leader.
TMG Report to the Plenary UN/CEFACT TMG Report Chair: Gunther Stuhec Vice Chair: Christian Huemer.
1 CIM User Group Conference Call december 8th 2005 Using UN/CEFACT Core Component methodology for EIC/TC 57 works and CIM Jean-Luc SANSON Electrical Network.
UN/CEFACT Forum, Bonn Germany 2004 Closing Plenary 12 th March 2004 UN/CEFACT U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS.
EbXML Overview Dick Raman CEO - TIE Holding NV Chairman CEN/ISSS eBES Vice Chair EEMA and HoD in UN/CEFACT Former ebXML Steering Group.
Views of France on CEFACT By Jean-Pierre Henninot France HoD at CEFACT Plenary.
USER GROUP Meeting Sophia Antipolis June 23/ Sophia Antipolis June 23/ UN / CEFACT TRANSPORT GROUP 2 - European ICTSB / ITSSG 3 -
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT Information Technology.
Progress Update by T. A. Khan UN/CEFACT Vice Chair AFACT Steering Committee Mid-term Meeting 9-10 May, 2005, Hanoi, Vietnam U NITED N ATIONS C ENTRE F.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT UN/CEFACT Core Components.
14 May th UN/CEFACT Plenary1 Applied Technologies Group Chair Mark Crawford Vice Chairs Gait Boxman Jostein Frømyr
1 SBDH 3.0 Project Session SBDH 3.0 Project leader Shingo Sakaguchi Oslo, Norway June 2010.
30 March th UN/CEFACT Forum - Dublin1 10th UN/CEFACT FORUM March Dublin, Ireland Forum Host & Supporting Sponsors:
Slide 1 UBL Forum Tim McGrath Vice Chair UBL Technical Committee Allerod, Denmark November UBL and UN/CEFACT a status report.
UN/CEFACT Forum Wednesday, 16 March 2005 Lunch & Learn ATG XML NDR Mark Crawford ATG2 Chair U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC.
UN/CEFACT TMG Closing Plenary Syndey Face-to-Face Interim Meeting 9-13 January 2006 at Newport Mirage Hotel.
Electronic Business XML Copenhagen Sue Probert Senior Director, Document Standards, Commerce One Vice-Chair, UN/CEFACT Forum’s International Trade & Business.
UN/CEFACT ORGANISATION 04/07/2006F. De Vos Freddy De Vos, Chair of UN/CEFACT TBG1 (Supply chain and procurement) Eindhoven, 04 July (Eindhoven/de.
th UN/CEFACT Forum ● TMG Closing Plenary1 7th UN/CEFACT Forum: Lyon, France Techniques & Methodologies Group (TMG) Closing Plenary 30 September.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
EbXML Technical Overview How all the pieces fit together Duane Nickull CTO – XML Global Technologies Chair – UN/CEFACT eBusiness Architecture
UN/CEFACT TMG Closing Plenary  New Delhi, IndiaSlide 1 UN/CEFACT TMG Closing Plenary New Delhi, India 02 – 06 October 2006.
UN/CEFACT TMG Closing Plenary  Zurich, SwitzerlandSlide 1 UN/CEFACT TMG Closing Plenary Zurich, Switzerland 10 – 14 December 2007 Gunther Stuhec,
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
How eBusiness Standardization can help XBRL Dick Raman, CEO TIE Holding NV Chair UN/CEFACT Forum.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
UN Economic Commission for Europe UN/CEFACT Report UNECE Committee on Trade 15 June
Introduction U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for.
UN/CEFACT TMG Meeting UN/CEFACT TMG Meeting Closing Plenary 6 – 10 June 2005 Walldorf/Germany.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT UN/CEFACT Core Components.
CSDAT Question 10 Peter Potgieser Sue Probert Mary Kay Blantz.
ISO/TC 154 Processes, data elements and documents in commerce, industry and administration ISO/TC 154.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
UCM Team Update on 13th UN/CEFACT Forum Senegal November 2008 (condensed from closing plenary) Scott R. Hinkelman.
UN Economic Commission for Europe 18 th UN/CEFACT PLENARY Methodology & Technology Programme Development Area Report Peter Amstutz & Tim McGrath UN/CEFACT.
UN/CEFACT TMG Closing Plenary  Dublin, IrelandSlide 1 UN/CEFACT TMG Closing Plenary Chair: Gunther Stuhec Vice Chair: Christian Huemer Secretary:
EAN.UCC Implementation of ebXML Pere Rosell, AECOC - EAN Spain Melanie Kudela, UCC May 2002.
Business Informatics Group Institute of Software Technology and Interactive Systems Vienna University of Technology Favoritenstraße 9-11/188-3, 1040 Vienna,
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
Going forward UN/CEFACT Bureau 14 May 2007 U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission.
Copyright © Open Applications Group, Inc. All rights reserved Open Applications Group OAGIS Core Components WG Tax Component
Standards Development Organizations: Stakeholders Perspectives 16 September 2008 Mark Palmer UN/CEFACT Vice Chair U NITED N ATIONS C ENTRE F OR T RADE.
12 ML X Welcome to the February 2001 Accredited Standards Committee X12 Meeting.
EbXML Business Process Dept of Computer Engineering Khon Kaen University.
Secretariat Service Support May 2006 U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe Stakeholder’s Perspectives.
ODP The Open Development Process Anders Grangård Vice Chair FMG.
1 Item 2.1.b of the agenda IT Governance in the ESS and related issues Renewal of mandates STNE Adam WROŃSKI Eurostat, Unit B5.
UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006.
UN/CEFACT Mission Role of Architecture and Deliverables.
July 11, 2008OASIS SET TC OASIS Semantic Support for Electronic Business Document Interoperability (SET) TC Overview.
EbXML Semantic Content Management Mark Crawford Logistics Management Institute
Overview of stakeholder priorities UN/CEFACT Bureau 14 May 2007 U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations.
Draft Programme of Work May 2006 U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic.
CEN WS/BII Business interoperability interfaces for public procurement in Europe The path towards more efficient procurement in Europe through standards.
Applied Technologies Group Report Chair: Mark Crawford Vice Chair: Jostein Frømyr Vice Chair: Gait Boxman.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT.
International Trade & Business Process Group (TBG)
Presentation transcript:

U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS Under the auspices of United Nations Economic Commission for Europe UN/CEFACT Techniques and Methodologies Group (TMG) Klaus-Dieter Naujok, TMG Chair

UN/CEFACT Group’s Mandate (Summary) The purpose of the Techniques and Methodologies Group (TMG) is to provide all UN/CEFACT Groups with Meta (base) Business Process, Information and Communications Technology specifications, recommendations and education. The TMG shall also function as a research group evaluating new information and communication technologies (ICT), as well as techniques and methodologies that may assist UN/CEFACT and its groups to fulfill their mandate and vision in Trade Facilitation and e-Business.

Work Programme ProjectDefinitionStatus Projected Completion Date Project team leader N090 – BCF Introduction Overview of all documents that comprise the Business Collaboration Framework Final Draft ON HOLD due to IPR Policy Issue ???Paul Levine N091 - UMM Meta Model UN/CEFACT Modeling Methodology – Meta Model (UML Profile) Stable (Version 12) Klaus-Dieter Naujok N092 - UMM Reference Guide UN/CEFACT Modeling Methodology – Reference Guide describing the technical detail of the meta model. Targeted at software implementers and developers of UML tools 1 st Draft of Version 12 ON HOLD due to IPR Policy Issue ???Paul Levine N093 - UMM User Guide UN/CEFACT Modeling Methodology –User Guide describing step by step how to develop Business Collaboration models using UMM. Targeted for Business Experts and Facilitators within TBG Completed (Version 12) Paul Levine

Work Programme ProjectDefinitionStatus Projected Completion Date Project team leader N094 – BCSS Technical Specification The Business Collaboration Schema Specification (BCSS) represents the centralized semantics of the UN/CEFACT’s Modeling Methodology (UMM) Meta-Model in technology- and implementation-neutral computational syntax. New Project Proposal Approved by FCT 03/12/18 ON HOLD due to IPR Policy Issue ???Simon Seow N095 - BCM Implementation Guide Business Collaboration Model – Implementation Guide describing what aspects need to be taken into account when applying a specific technology at the implementation layer. To start after completion of N092 & N094 ???TBA N096 – BCM Integration Guide Business Collaboration Model – Integration Guide describing the requirements for storing not only Business Collaboration Models but also the libraries for reusable components such as Business Entities and Business Processes. To start after completion of N092 & N094 ???TBA

Work Programme ProjectDefinitionStatus Projected Completion Date Project team leader ebXML - BPSS V1.1 ebXML Business Process Specification Schema Technical Specification. This is a maintenance release fixing implementation issues found in the original ebXML release (May 2001), Completed Dave Welsh ebXML - BPSS V2.0 ebXML Business Process Specification Schema Technical Specification. This version will be aligned with the UMM meta model, especially regarding the BTV layer New Project Proposal Approved by FCT 03/12/18 ON HOLD due to IPR Policy Issue ???TBA ebXML - BPSS V3.0 ebXML Business Process Specification Schema Technical Specification. This version will be aligned with the UMM meta model, especially regarding the BRV layer To start after completion of BPSS V2.0 ???TBA

Work Programme ProjectDefinitionStatus Projected Completion Date Project team leader N092 Addition - UMM Profile of UML Artifacts A set of rules that enables the consistent specification and validation of UML artifacts through the notion of “well formed” UMM. The rules would be captured as a UMM profile of UML Artifacts. New Project Proposal Approved by FCT 04/03/11 ON HOLD due to IPR Policy Issue ???TBA CCTS V2.01Core Component Technical Specification – Part 8 of the ebXML Framework Completed Alan Stitzer CCTS V2.10Core Component Technical Specification – Part 8 of the ebXML Framework New Project Proposal Approved by FCT 03/12/18 ON HOLD due to IPR Policy Issue ???Alan Stitzer CC User GuidePrimer for the CCTS using examples to describing how to rediscover CC. Completed Fred van Blommestein

Work Programme ProjectDefinitionStatus Projected Completion Date Project team leader EBA V1.0e-Business Architecture Technical Specification Revised Project Proposal to align with the work programme and vision of UN/CEFACT Approved by FCT 03/12/18 ON HOLD due to IPR Policy Issue ???TBA EBG V1.0e-Business Glossary1st Draft Kenji Itoh UBAC V1.0 Joint Project with LG Unified Business Agreement and Contracts Technical Specification Started, Requirements phase to be completed 3rd Qtr Anders W. Tell

UN/CEFACT New Projects  N092 - Additions of UMM Profile of UML Artifacts  N094 - BCSS Technical Specification  ebXML BPSS V2.0 Technical Specification  CCTS - Part 8 of the ebXML Framework  EBA V1.0 - e-Business Architecture TS

UN/CEFACT Items for Plenary Approval  In order to have all specifications within the ebXML framework within ISO, We resolve to submit the Core Components Technical Specification Version 2.01 to ISO TC 154 for fast-tracking as a Draft Technical Specification  In order to have all specifications within the ebXML framework within ISO, We resolve to submit the ebXML Business Process Schema Specification Version 1.1 or any future approved version to ISO TC 154 for fast-tracking as a Draft Technical Specification.

UN/CEFACT Items for Plenary Noting The BCF is no more than a name for the packaging of a number of standing (approved) TMG work items related to the UMM set of deliverables. The BCF is not in itself a deliverable but a publicly friendly representative branding of a number of approved TMG deliverables and the result for UN/CEFACT users asking to correct the problem of an over used term "UMM". It is similar to the term UN/EDIFACT covering all EDIFACT specifications such as directories, syntax and design rules, or ebXML being the brand name for a number of different technical specifications, each deliverable having it’s own approval process.

UN/CEFACT Issues for Plenary action  IPR Policy  There is a urgent need to have a “written” IPR Policy for the use by all Groups to allow the reissue of calls for participation of 5 TMG projects currently on hold  Without a “written IPR Policy that can be reviewed by potential participants, TMG will not be able to continue work, such as all Business Process related projects, that depend on IP to be submitted  Previous Call for Participation pointed to the “Provisional” IPR Policy

UN/CEFACT TMG Activity Update not included in submitted Report  BPWG  Reviewed BCF Roadmap with general session to clarify what work items would be in what document with in the N09X set  Progressed work on N090 (BCF Introduction)  UBAC:  Joint meeting with LG for continued requirements and use case discussions  Conducted discussion seminars: Legal considerations and ebXML, Standard Business Document Header (SBDH)  CCWG  Finalize CC UG alignment with UMM User Guide

New TMG Membership Levels Proposal (modified taking comments from FCT into account)

UN/CEFACT Next meetings  May 2004, TMG Meeting  Waldorf Germany (CANCELED)  September, Forum Meeting  McLean, VA, USA  6-10 December, TMG Meeting  Detroit, MI, USA  March 2005, Forum  Asia  May/June 2005, TMG Meeting  Barcelona, Spain (???)

UN/CEFACT S IMPLE, T RANSPARENT AND E FFECTIVE P ROCESSES FOR G LOBAL B USINESS.