M. Kezunovic, G. Huang, TAMU M. Grady, S. Santoso, UT Austin W-J. Lee, UT Arlington ERCOT, August 11, 2006 ©2006 Mladen Kezunovic. All rights reserved.

Slides:



Advertisements
Similar presentations
LOGO Safety Through Prevention – Safe Switching Using Smart Key Technology Shuqiang Jin, Unitech, Zhuhai, China Nan Liu Youru Huang, SERCC EPRI's 14th.
Advertisements

A Path breaking Technology for Network Maintenance and Optimization
1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support
Milton Holloway, Ph.D. President & COO Center for the Commercialization of Electric Technologies Synchrophasor Developments for the ERCOT Grid A Cooperative.
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
Cut Costs and Increase Productivity in your IT Organization with Effective Computer and Network Monitoring. Copyright © T3 Software Builders, Inc 2004.
Marianna Vaiman, V&R Energy
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Multi Functional Digital Fault Recorder
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
and Trend for Smart Grid
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
Understanding the IEC Standard 李嘉凱 指導教授:柯開維.
Peter Hofmann Chief Engineer-Distribution Engineering Consolidated Edison, New York PQView User Group Meeting New York, NY August 31 – September 02, 2010.
Introduction to Phasor Measurements Units (PMUs)
Industrial Systems Introducing the L90 Universal Relay Advanced transmission line protection and control High-speed current differential protection for.
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
Macomber Map Demonstration
Group Meeting – Pepco Holdings, Inc. July 17, 2014.
1 Some Issues about Big Data in Power Grid Gary Quan.
Synchrophasor Measurement Implementation in ERCOT
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Make the most of your energy Make the most of your energy SM Add application photo in this area Need an easy to use, modular system for revenue metering?
Common Information Model and EPRI Smart Grid Research
CCET as a Forum to Help Resolve Interoperability Issues Grid-Interop Stakeholders Coordination Panel Nov 11-13, 2008 Atlanta, GA Milton Holloway, Ph.D.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
Accurate Fault Location Using Detailed Transmission Line Models NSF/EPRI Workshop M. Kezunovic Texas A&M University March 29, 2002.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Smart Grid Task Force Workshop meeting Mladen Kezunovic Texas A&M University Coordinator PSerc Workshop August 10-13, 2009 Breckenridge CO.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Topics of presentation
PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity ( ) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Load Modeling for Dynamic Studies ROS Meeting – July 2005 ERCOT System Planning.
9/12/20071 CCET at Two Years Presentation to Demand Side Working Group Meeting of ERCOT Austin, Texas October 12, 2007 Jay Zarnikau Frontier Associates.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
PS ERC Transmission and Distribution Technology Research Stem Meeting #10 Committee Meeting Mount Hood, August 15-18, 2002.
- 1 IPv6 Quality of Service Measurement Issues and Solutions Alessandro Bassi Hitachi Europe SAS RIPE 50 meeting Stockholm, 2 nd May 2005.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
PJM Interconnection Smart Grid Investment Grant Update
Substation Data Integration & Information Exchange Advisor: Dr. Mladen Kezunovic Student: Sasa Jakovljevic Texas A&M University, Department of Electrical.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Office of Administration Enterprise Server Farm November 2004 Briefing.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
ISO-NE Synchrophasor Related Projects
About Georgia Transmission Corporation (GTC)
Automation Technologies SCADA SENSORS HMI
Substation Automation IT
Electricity Distribution Network Design Training & Courses
Accurate Fault Location Using Modeling and Simulation
Substation Automation System
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Enhanced State Estimation by Advanced Substation Monitoring
PowerLogic ION6200 Power and energy meter.
Presentation transcript:

M. Kezunovic, G. Huang, TAMU M. Grady, S. Santoso, UT Austin W-J. Lee, UT Arlington ERCOT, August 11, 2006 ©2006 Mladen Kezunovic. All rights reserved Use of synchronized sampling in substations and system-wide applications

Copyright 2006 Kezunovic2 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic3 CCET and TEES CCET: - Formed in September Funded by members: TXU, CNP, AEP-Texas, Austin Energy, Freescale, National Instruments - Focused on commercialization investments TEES: - State Agency managed by Texas A&M University - Leader of a consortium of universities (TxCEE) - Interested in working with CCET on development of new solutions (Synchronized Sampling Project)

Copyright 2006 Kezunovic4 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic5 Scope of Work Introduce new concept of data integration and information exchange Explore the use of synchronized samples Make products to facilitate the use Demonstrate the benefits Define a commercialization path

Copyright 2006 Kezunovic6 The Main Idea Transmission Line Current Transformer Bus Contact “A” Contact “B” Capacitive Voltage Transformer ) Current Voltage ( ( CBM DPR DFR CB

Copyright 2006 Kezunovic7 Background CFLMS PEEMS LMS FL ISSC RC DFR CBM DPR RTU SOE A SA S A AS AS A S LEVEL I CENTRALIZED LOCATION LEVEL II SUBSTATION LEVEL III SWITCHYARD INTERFACE

Copyright 2006 Kezunovic8 Concept DPRs CBMs RTUs DFRs SERsPLCs Data Integration Information Exchange PQ Meters Database: Raw and pre-processed measurements System configuration data

Copyright 2006 Kezunovic9 Information Users Summary Report Comprehensive Report Brief Report EngineerDispatcher Technician Reports can be customized according to the need of a particular category of users and disseminated via fax, e- mail, website, pager, etc.

Copyright 2006 Kezunovic10 , Fax, Hosting, WWW, Pager Notification Intranet Internet Wide-area networks (hubs, routers, gateways) System wide analysis Mobile Agent Server System wide control COMTRADE IEC Substation Analysis and Control RTUDPR SERCBM PMUDFR GPS Substation Analysis and Control DFR RTU SER PMU DPR CBM GPS

Copyright 2006 Kezunovic11 Scope of Work Task #1: Development of New Field Equipment (CB Monitor, field test set) Task#2: Deployment of new applications (substations, control Center, ERCOT) Task #3: Exploration of new services (Calibration Lab and Economic study of benefits)

Copyright 2006 Kezunovic12 Products Substations: - Circuit Breaker Monitor (CBM), Task#1A - CBM analysis (CBMA), Task#2B&2D - DFR analysis (DFRA), Task#2B&2D - DPR analysis (DPRA), Task#2B&2D - Integrated substation analysis, Task#2C&2D Test Equipment: - Certification and calibration lab, Task#3A - Field test equipment for GPS-enabled IEDs, Task #1B

Copyright 2006 Kezunovic13 Products Control Center: - Fault location, Task#2B&2D ERCOT: - Alarm Processor, Task#2A - Voltage Security, Task#2A - Sate Estimator, Task#2A - Model Verification, Task#2A Study of Economic Benefits, Task#3B

Copyright 2006 Kezunovic14 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Automated Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic15 Substation applications Developed CBM Developed CBMA, DPRA, DFRA Performed testing in TAMU labs Designed client-server architecture Started field demonstration

Copyright 2006 Kezunovic16 Substation Application Overall Architecture

Copyright 2006 Kezunovic17 Synchronized Sampling CBM Synchronization circuit

Copyright 2006 Kezunovic18 Field Deployment 345KV Line, CNP Substation

Copyright 2006 Kezunovic19 IED connections Field Setup

Copyright 2006 Kezunovic20 Field Deployment PhaseStepsDescription Phase 1 Lab testing and field installation of individual monitoring and control functions Step 1 Testing at the Texas A&M University (TAMU) lab using digital simulator Step 2 Testing at CNP substation using field data Phase 2 Lab testing and field installation of an integrated monitoring and control functions Step 1 Testing at the TAMU lab using digital simulator Step 2 Testing at CNP substation using field data

Copyright 2006 Kezunovic21 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic22 ERCOT Analysis Applications Use of Synchronized samples - Alarm Processor - Voltage Security - State Estimator - Model Verification Graphical Interfaces for operators

Copyright 2006 Kezunovic23 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic24 Synchronized sampling utilization Take advantage of synchronized samples coming from variety of IEDs (DFRs, DPRs, CBMs, etc) Use extracted features from the measured data (phasors, switching times, parameters) Correlated features using GPS- precision time-stamps

Copyright 2006 Kezunovic25 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic26 Field deployment and demonstration Alarm Processor: - Automate Cause-effect analysis of alarms using GPS synchronization - Use data from other IEDs in addition to RTUs - Incorporate the information into SCADA database - Make enhancement to existing operator displays - Archive detailed information and raw data for reporting purposes

Copyright 2006 Kezunovic27 Field deployment and demonstration Voltage Security: - Calculate static stability margin index for the voltage regulated buses - Use of GPS-synchronized measurements from IEDs located at neighboring buses - Use voltage stability index for estimating security margin of transactions - Make enhancement to existing operator displays by introducing a warning - Archive trends for future training uses and transaction estimated

Copyright 2006 Kezunovic28 Field deployment and demonstration State Estimator: - Use GPS-synchronized data from other IEDs in addition to RTUs - Incorporate Synchronized Phasor measurements to improve accuracy - Improve Topology Processor by using Synchronized CBM status data - Make enhancement to existing operator displays with time-stamps - Monitor performance of the existing SE by comparing the results with GPS-synchronized measurements

Copyright 2006 Kezunovic29 Field deployment and demonstration Model Verification: - Use GPS-Synchronized measurements from other IEDs in addition to RTUs - Compare system responses (measured) against simulations (using models) - Measure dynamic responses (machines and loads) and estimate parameters - Make enhancement to existing operator displays by adding measurements - Update the models “Continuously”

Copyright 2006 Kezunovic30 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic31 ETF Application April 3, 2006: CCET Board Approval August 3, 2006: TO’s feedback August 11, 2006: ROS vote August ???, 2006: CCET Board Approval of the commercialization plan September???, 2006: ERCOT Board Approval September 27, 2006: ETF Application Deadline December 2006: ETF award decision January 2007: start of work

Copyright 2006 Kezunovic32 Outline Who are we: CCET and TEES What have we proposed to do: Scope of Work What have we already accomplished: Substation Applications What is the opportunity available to ERCOT: Analysis Applications What is the scope of work for ERCOT: Synchronized Sampling Utilization What are the expected deliverables and benefits: Field Deployment and Demonstration What is the timing: ETF Application Conclusion

Copyright 2006 Kezunovic33 Conclusions Initial substation developments will be completed in FY2006 and demonstrated in FY2007 Host utility in FY2006 will be CNP (two substations) with a possible extension to AEP-Texas and TXU in FY2007 Development of ERCOT applications will be initiated in FY2007 ETF support will bring match-funding for FY2007 Other match-funding will come from EPRI, DOE and ERCOT (pending budget approval) Three TxCEE universities will be involved in development; TEES will be the Lead institution Commercialization plan will be outlined