Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 1 Environmental Technologies Verification Systems Institute for Prospective Technological.

Slides:



Advertisements
Similar presentations
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Advertisements

Study: Trustmarks Provision in Europe Luca Alessandro Remotti Intrasoft International.
Sarah Radovan | Chief, Measurement and Reporting, Government of Canada Considerations for Building a Cost Efficient Environmental Technology Performance.
John H. Neate, Senior Associate, OCETA/ETV Canada, Canada Boosting Eco-technologies through Verification Expectations Parallel Sessions – Part I: Scope.
Environmental Performance Verification
Mette Tjener Andersson Environmental Technology Verification (ETV) Head of DANETV, DHI Urban & Industry.
WP4 – Task 4.4 LCA Activities
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Voluntary instruments Daniel Hajek 1.Environmental labelling 2.EMAS 3.Cleaner productions 4.Green public procurement 5.Voluntary agreements Voluntary.
ISO 9001 : 2000.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Overview of Printing Industries Environmental Initiatives Presentation by Hagop Tchamkertenian Manager, Industry & Commercial Policy Printing Industries.
ISO Energy Management System Certification
Marketing Research Aaker, Kumar, Day Seventh Edition Instructor’s Presentation Slides.
Green School Design Gary A. Jerue ED 846 Spring 2010.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Quality assurance in IVET in Romania Lucian Voinea Mihai Iacob Otilia Apostu 4 th Project Meeting Prague, 21 st -22 nd October 2010.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
MISMO Business and Standards Round-up Fall 2013 Educational Summit & Workshops MISMO Business and Standards Round-up Presenters: Kyle Bensen, MGIC, Chair.
Kevin A. Jones, MBA, M.Sc.Pl., President & CEO, OCETA, Canada Environmental Performance Verification - Managing Expectations for Meaningful Results Boosting.
Aaker, Kumar, Day Eighth Edition Instructor’s Presentation Slides
WISE experience in AUSTRIA WISE Final Workshop Brussels, 22 March 2007 Gabriele Sauberer (TermNet)
Environmental auditing
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
DG Environment European Commission Introduction to European ETV Promoting New Technologies Environmental Technology Verification Schemes Introduction to.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Sustainable Development Impact Evaluation Miriam Hinostroza.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
EMAS V ERIFICATION AND V ALIDATION Impressions from an Accreditation Body M ARC WOUTERS BELAC EMAS S TAKEHOLDERS D IALOGUE B RUSSELS The views.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.
Result Orientation in Interreg CENTRAL EUROPE Annual Meeting, Luxemburg, 15 September 2015 Monika Schönerklee-Grasser, Joint Secretariat.
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Tom Vereijken | Chairman, Eucetsa TOWARDS A EUROPEAN ETV SYSTEM Tom Vereijken EUCETSA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
EPA c:\nsf\powerpnt\nrwa 1 U.S. EPA’s Environmental Technology Verification (ETV) Program.
NATO CCMS Pilot Study Meeting, Athens 2006 | Slide 1 Applying Innovative Land Remediation Johan van Veen (TNO) NATO CCMS Pilot Study Meeting Athens, June.
1 CREATING AND MANAGING CERT. 2 Internet Wonderful and Terrible “The wonderful thing about the Internet is that you’re connected to everyone else. The.
High Assurance Products in IT Security Rayford B. Vaughn, Mississippi State University Presented by: Nithin Premachandran.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Internal Audit Quality Assessment Guide
Environment Premium environmental management EU Eco-Management and Audit Scheme.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
EIA approval process, Management plan and Monitoring
Integrated Management System and Certification
Building a cost-efficient system
The EU pilot programme on Environmental Technology Verification (ETV)
OIML Certification System (OIML-CS)
Raising the Standards in European Homeopathy
Presentation transcript:

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 1 Environmental Technologies Verification Systems Institute for Prospective Technological Studies Luis Delgado Sancho

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 2 Outline ETAP ETV Existing systems, structure and costs Market Survey Scheme for an EU model Upcoming ETV events

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 3 Environmental Technologies Action Plan Improving testing, performance verification and standardisation related to environmental technologies

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 4 To establish or prove the truth of the performance of a technology under specific, predetermined criteria or protocols and adequate data quality assurance procedures (from US ETV glossary) Accelerate diffusion –market acceptance – of innovative technologies trough: –Independent validation of performance –Networking centres for the testing and verification of technologies –Develop commonly agreed protocols, possibly common certificates European Network of technology performance verification Verification:

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 5 IPTS study EURODEMO PROMOTE AIRTV TRITECH ETV 47 organisations 18 EU countries 5.5 M€ EC contribution 8.5 M€ total cost Existing ETV systems, European related systems Market Survey, Models for EETVS TESTNET European ETV initiatives Soil and groundwater remediation technologies Collect and process information on technology demonstration Water technologies and clean production technologies including monitoring Soil and groundwater remediation technologies Air emission reduction technologies Soil remediation, waste water, energy

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 6 Environmental Technology Verification - Definitions What is ETV? Build confidence to buyers Independent 3 rd party verification Protocols/test plans designed to suit specific technologies Stakeholder input No single definition of ETV

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 7 Environmental Technology Verification - Definitions What ETV is not? ETV is NOT certification (ISO, CEN, National systems…): ETV does not verify against a standard (or minimum performance requirements), but can use standards and modify them ETV does not necessarily use laboratories/personnel that are certified for specific tests/tasks ETV does not supervise sound manufacturing

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 8 Available in the Market Certification Self Declarations ETV R&D No need for certification, but need for credible performance data Compliance to standards No standards exist Early research Prototypes, Demonstration The “positioning” of ETV

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 9 US ETV and ETV Canada – two different “philosophies” Vendor ETV system ETV Managing Organisation Verification and Testing Organisation Vendor Testing laboratory ETV Managing Organisation Verification Organisation ETV system US ETV objective Testing done “inside” the system Allows easy comparison Stakeholder input very important Protocol/Test plan development ETV Canada flexible Testing done “outside” the system Strongly producer/vendor oriented Uses previously established data

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 10 The US ETV system : structure ETV system Vendor ETV Team Establishment of general protocols and quality system Review of quality Oversight of verification organisations Review of final verification report Verification Organisations Development of test protocols and test plans Execution of verification tests Preparation of verification report Stakeholder Groups Set verification priorities Review protocols and operating procedures

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 11 The US ETV system : Costs ~ 380 verified technologies Vendor contribution to costs was 8-13 % for years Verification costs 3-5 times more than Centre support costs (’99–’04) Total costs and Vendor Contribution

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 12 The US ETV system : average per technology verification costs Technology category average verification cost ( k€ ) Number of verified technologies (until 2005) Air pollution control6567 Monitoring50132 Drinking water treatment9564 Groundwater/surface water protection and wastewater treatment Coatings and coating equipment13515 But the costs are very technology specific. Big differences in costs can be encountered even inside the same technology category

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 13 The ETV Canada system : structure ETV system Environment Canada Program policy ETV Canada Collection of vendor claims and data Identification of the Verification entity Review of the final Verification report Award of the Verification certificate Verification Entities Verification of supporting data Comparison of data to claims Preparation of the Verification report Independent Laboratories Execution of tests Generation of data to verify the claims Vendor

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 14 The ETV Canada system : Costs Verification cost k € Vendor contribution k€ Additional service for mini-market survey (optional) 3-5 k € Testing (not included in the verification, paid by the vendor) up to 71 k€ ~ 50 verified technologies The vendor pays ~ 60% of the verification costs This amount does not include the tests/protocol development etc. costs that are paid directly to the testing laboratory There are no protocols/test plans developed by ETV Canada, but with the optional step of the “mini-market survey” recommendations can be given

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 15 Other ETV systems, Japan, South Korea… The Japan ETV system was inspired by the US ETV. This program is separated into a government sponsored scheme and a vendor financed scheme. Each verification project starts inside the first scheme but has to transfer to the second after a fixed period of time. The South Korea ETV program is the only one which offers two separate certificates. The certificate of designation is awarded when the vendor can provide sufficient data to support his technology and the certificate of verification when the vendor cannot provide this data and the system has to verify the performance. Verified technologies benefit from a point system to be used in public procurement bids and special attention is paid to SME's with specific funds and loans.

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 16 IPTS Market Survey : the interviewed panel EuropeUSACanadaTotal Vendor Buyer/User4004 Public Authorities 1000 Other Stakeholders 1000 ETV-related programs Total Carried out between 02/2006 – 06/2006 Questionnaires and telephone interviews Strongly focused on technology producers The majority of the producers had previous experience with an ETV system

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 17 IPTS Market Survey : key findings – stakeholder expectations A European ETV system is considered as a useful tool, provided bureaucracy is kept to a minimum and high technical level is guaranteed. It is expected to supersede existing, national procedures for technology evaluation. Through European-wide recognition it should be able to eliminate any need for duplication of effort and tests throughout Europe. Harmonization with other non- European ETV programs is a factor of success. Priority should be given to innovative, commercially available technologies with a positive environmental impact. Prototypes may be considered inside a limited scope framework.

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 18 SMEs are the type of companies that are expected to benefit the most from an ETV system, since they are considered as innovation oriented and at the same time they have limited financial, logistic or testing capabilities. It was however stressed that bigger companies should be welcomed as well. The different ETV or ETV related systems offer a large range of procedural choices (US ETV-type, ETV Canada-type) and vendors' opinions are divided. The meaning of the verification award (logo) that differs in every system and how this is interpreted by potential buyers was mentioned as an important issue that is possible to improve. IPTS Market Survey : key findings – stakeholder expectations

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 19 IPTS Market Survey : key findings – stakeholder expectations The ETV system has to be totally independent. The respondents see it as a public or private organization, supervised by a public body. The cost is an issue of the utmost importance for the vendors. As many stakeholders as possible should financially contribute to the system. Financial help is a strong incentive for vendors to go through the verification process. The ETV system should remain voluntary but strategies have to be developed to motivate the vendors to participate to it, without the system becoming mandatory.

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 20 The market survey revealed a contradiction in the way the respondents envisage the ETV system: The vendors did not associate any increase in sales or any additional market penetration to the effects of the ETV system. Despite of that, almost all the respondents declared that ETV was worth the time and money spent. They did associate the presence of the ETV logo next to their mark as a contribution to the positive image of their company and admitted that they gained in recognition and in credibility. The effects of ETV verification are difficult to detect. Vendors are reluctant to attribute part of their sales to the ETV logo; they prefer to attribute them to their product's own performance. Plausibly, both the product's performance characteristics and the ETV logo influence at the same time the purchase decision. IPTS Market Survey : key findings – expected impact

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 21 IPTS Market Survey : key findings – willingness to pay The practice followed until now by the existing ETV systems (US ETV and to a lesser extent Canada ETV) is that the vendor contributes only for a small part to the total costs necessary for the realization of the verification. The rest is supplied by the government and by other stakeholders. The vendors' willingness to pay is directly related to the access to national markets, without having to go through additional national systems. They stated that they are willing to pay if the verification enables them to enter any national market in Europe, with no need of additional testing in national systems. Vendors consider that they should not be charged for the development of generic protocols. In general, in voluntary schemes, vendors expect to receive substantial public funding.

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 22 ETVS model : different possibilities Verification tools EU ETV Team Promotion Execution of tests/verification Execute tests using predefined protocols and test plans Verify the data Network of national/regional/local “ETV points” Review and approval of verification report Awarding certificate/logo Review of applications Dissemination of results Write verification report Appoint thematic verification organisations (VO) Stakeholders group(s) Auditing theVOs (Quality Management) Designate and coordinate the stakeholders group(s) Test labs / verification centres Thematic VO Vendor ETV Team Promotion Execution of tests/verification Execute tests using predefined protocols and test plans* Verify the data Network of national/regional/local “ETV points” verification report Awarding certificate/logo Review of applications Dissemination of results Write verification report Appoint thematic verification organisations (VO) Stakeholders group(s) Auditing theVOs (Quality Management) Designate and coordinate the stakeholders group(s) Define quality management plan Develop verification tools Define quality management plan Develop verification tools Decides on program scope, objective and strategy Develops program level protocols Audits, evaluates Verifies cost effectiveness Xxxx XXX Xxxx Organisation Component of program Task Organisation involved in Organisation responsible for Establish test plans* Establish protocols* Define minimum performance requirements (if relevant) Appoint Test Lab or Verification Centre * Technology testing is done inside the ETV system

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 23 Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report Scheme for an EU model

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 24 EU EPV Secretariat Testing Laboratories Contact Points Vendor Thematic Verification Centres Contact Phase Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report Scheme for an EU model

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 25 Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report EU EPV Secretariat Testing Laboratories Vendor Thematic Verification Centres Claims and existing Data Application Phase Scheme for an EU model Contact Points

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 26 Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report EU EPV Secretariat Testing Laboratories Contact Points Vendor Thematic Verification Centres Testing Phase Scheme for an EU model

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 27 Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report EU EPV Secretariat Testing Laboratories Contact Points Vendor Thematic Verification Centres Assessment Phase Scheme for an EU model

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 28 Application phase Claim definition and review First review of available data and assessment whether further tests are needed Assessment phase Final review of data Drafting of verification report Testing phase Elaboration of test plan Implementation of tests Test report If further tests needed Contact phase Vendor contacts a Verification Center directly or through a contact point Publication phase Award of verification certificate Publication of synthesis report EU EPV Secretariat Testing Laboratories Contact Points Vendor Thematic Verification Centres Publication Phase ETV logo Scheme for an EU model

Sevilla 16 October 2007 – ECREINetwork, 2 nd Interregional Workshop 29 Upcoming ETV events European Forum on Eco-Innovation: Boosting Eco-technologies through Verification November – Ministry of Sustainable Development, Paris 3 rd International Forum on Environmental Performance Verification 'Engaging the Developing World' within the Pollutec fair, November 28, Paris